(Site Visit Attendance List Available)The DLA Aviation Operations Center Phase II project requirements will construct a multi-story office building of 281,075 SF to accommodate 1,622 employees in an administrative operations center. The Operations Center includes: open and individual administrative office and support areas (mail distribution, packing, shipping, reception space, reproduction area, unclassified conference and Video Tele-Conference (VTC) space, law library, kitchenette/break, restrooms, storage, equipment and supply rooms, passenger and service elevators, lightning protection, fire suppression, fire alarm, mass notification systems, Intrusion Detection System (IDS) and energy management control system (EMCS), and building information systems.The project will utilize conventional design and construction methods to accommodate the mission of the facility. The facility will be compatible with the Department of Defense (DoD), DLA, and Defense Supply Center, Richmond design standards. Local material and construction techniques will be used where cost effective. The facility will be designed as a permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The project will comply with DoD minimum Antiterrorism Standards for buildings per UFC 4-010-01. The project also includes emergency generators, site improvements, special foundations, parking and all necessary supporting