Elena Street Slope Repair and Utilities Replacement Project

expired opportunity(Expired)
From: Morro Bay(City)
MB2020-SD03

Basic Details

started - 12 Nov, 2022 (17 months ago)

Start Date

12 Nov, 2022 (17 months ago)
due - 15 Dec, 2022 (16 months ago)

Due Date

15 Dec, 2022 (16 months ago)
Bid Notification

Type

Bid Notification
MB2020-SD03

Identifier

MB2020-SD03
City of Morro Bay

Customer / Agency

City of Morro Bay

Attachments (2)

unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Bid Number:MB2020-SD03 Bid Title:Elena Street Slope Repair and Utilities Replacement Project Category:Construction ServicesStatus:Open Description: ELENA STREET SLOPE REPAIR AND UTILITIES REPLACEMENTS PROJECT Project No. MB2020-SD03 Notice is hereby given by the Public Works Department and the City Clerk of the City of Morro Bay, California, in the City Clerk’s Office, 595 Harbor Street, Morro Bay, CA 93442, that the City will receive sealed bids for this formal project until 2:00 P.M. Thursday, December 15, 2022. Bids received after that time will be returned unopened. The bids shall be opened and read aloud by the City Clerk, on the above-specified date at or about 2:05 P.M. in an adjacent conference room accessible to the bidders and the public or in front of City Hall if dictated by current public health guidelines. Requests for information or clarification and any questions must be submitted IN WRITING and received in the Department of Public Works no later than 5:00 p.m. on
Thursday, December 8, 2022. Requests may be submitted via e-mail addressed to Eric Riddiough, PE - City Engineer, at document.write('eriddiough'+'@'+'morrobayca.gov')eriddiough@morrobayca.gov For security reasons, you must enable JavaScript to view this E-mail address.. Scope of Work: General work description: The work shall include, but is not limited to, providing all tools, materials, labor, equipment, and incidentals necessary for the excavation, removal and replacement of an 18” diameter storm drain pipe and a 6” vitrified clay pipe sewer line and all connections, inlets, backfill, and pavement restoration. In addition, the area will be stabilized by the construction of a reinforced concrete, cast-in-place gravity retaining wall with additional placed drainage media and backfill. All utilities not replaced will be protected in place including manholes and returned to their prior condition. The work will also include any required traffic control, signage, public notifications, stormwater control, bypass pumping, shoring, formwork, and all other work necessary to render the infrastructure/facility complete and operational, as shown on the Project Plans and Specifications, as specified herein, and in accordance with City of Morro Bay Standard Specifications and Drawings, Caltrans Standard Specifications, and Greenbook with whichever is more restrictive applying if a conflict arises. The Contract Documents may be obtained for electronic download from ASAP Reprographics, www.asapreprographics.com. Bidders must register as an Official Plan Holder by contacting ASAP Reprographics and pay $25 (non-refundable) to download Contract Documents (including technical specifications and drawings) and be assured of receiving all addenda and plan revisions that may occur during the bidding process. Hard copies of the Contract Documents can be purchased by registered plan holders directly from ASAP Reprographics located at 365 Quintana Road, Morro Bay, CA 93442. Publication Date/Time: 11/12/2022 12:00 AM Closing Date/Time: 12/15/2022 2:00 PM Pre-bid Meeting: 12/07/2022 at 2:00 PM Related Documents: MB2020-SD03 - Elena Street Slope Repair & Utilities Replacement Project Notice to BiddersAddendum 1 MB2020-SD03 Return To Main Bid Postings Page

595 Harbor Street, Morro Bay, CA 93442Location

Address: 595 Harbor Street, Morro Bay, CA 93442

Country : United StatesState : California

You may also like

St Clair Street Waterline Replacement Between Kern Street & San Joaquin Street

Due: 23 Apr, 2024 (in 4 days)Agency: City of Escalon

2024 Jacksonville Street Paving Project

Due: 23 Apr, 2024 (in 4 days)Agency: Jacksonville City

2024 Street Paving Project

Due: 29 Apr, 2024 (in 10 days)Agency: Town of Teulon

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.

Classification

Construction Services