The Chestnut Street parking lot is located along Chestnut Street just south of Route 113 and is bordered by Bank Street. The proposed work will include mill and overlay of the existing asphalt surface, grade adjustment within the parking lot area, removal and replacement of concrete sidewalk fronting along Chestnut Street, removal of concrete curb and replacement with granite curb, installation of 18-inch wide granite paver buffer zone along Chestnut Street, installation of bituminous paver driveway aprons, installation of handicap ramps, proposed rain gardens and landscape islands, retaining walls, signage, and pavement markings. Stormwater collection inlets and pipes are also proposed to assist with capturing surface runoff and to promote groundwater infiltration.A preconstruction meeting with the Contractor and Borough Engineer is required prior to the start of construction. Contact