Nutrient Reduction Wetland - Two wetlands, one contract

expired opportunity(Expired)
From: Iowa Department of Administrative Services(State)
24-03

Basic Details

started - 05 Apr, 2024 (25 days ago)

Start Date

05 Apr, 2024 (25 days ago)
due - 24 Apr, 2024 (6 days ago)

Due Date

24 Apr, 2024 (6 days ago)
Bid Notification

Type

Bid Notification
24-03

Identifier

24-03
Agriculture and Land Stewardship

Customer / Agency

Agriculture and Land Stewardship

Attachments (7)

unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

These two wetlands will be bid as one contract. WOR982203C-N This project is for a constructed wetland and a saturated buffer. In general, the work involves, but is not limited to, selective clearing, excavation, grading, steel sheet pile weir construction, tile installation, water control structures and seeding. This project includes around 17,350 cubic yards of earthwork, 610 square feet of steel sheet pile, 1,950 linear feet of tile installation, 760 linear feet of reinforced concrete pipe (RCP), 50 tons of riprap, 40 cubic yards of concrete grout, 10.8 acres of seeding and water control structures. The estimated construction cost range for this project is $230,000 to $290,000. WOR982203C-S This project is for a pumped, tile-zone, constructed wetland for nutrient removal. In general, the work involves, but is not limited to, selective clearing, excavation, grading, lift station with electric transmission to pump, tile installation, inlet and outlet concrete structures and seeding. This project includes around 10,750 cubic yards of earthwork, 138 linear feet of 30-inch diameter gasketted reinforced concrete pipe (RCP), 100 tons of riprap, inlet and outlet concrete structures, lift station with a 1.5 cubic feet/second pump (5 HP, TDH of 14 feet) with VFD, electric transmission line to the lift station and 2.6 acres of seeding. The estimated construction cost range for this project is $125,000 to

1305 E Walnut St 3rd floor, Des Moines, IA 50319, United StatesLocation

Address: 1305 E Walnut St 3rd floor, Des Moines, IA 50319, United States

Country : United StatesState : Iowa

You may also like

Nutrient Reduction Strategy Demonstration Projects

Due: 24 May, 2024 (in 22 days)Agency: Iowa Department of Agriculture and Land Stewardship