T-Hangar Improvements - Northeast Florida Regional Airport - St. Augustine, FL

expired opportunity(Expired)
From: Passero Associates Engineering Architecture(Co-op)
23000081.105F

Basic Details

started - 07 Mar, 2024 (1 month ago)

Start Date

07 Mar, 2024 (1 month ago)
due - 28 Mar, 2024 (1 month ago)

Due Date

28 Mar, 2024 (1 month ago)
Bid Notification

Type

Bid Notification
23000081.105F

Identifier

23000081.105F
Passero Associates Engineering Archtecture

Customer / Agency

Passero Associates Engineering Archtecture

Attachments (6)

unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Project:T-Hangar Improvements - Northeast Florida Regional Airport - St. Augustine, FLProject #:23000081.105FDescription:Base Bid: Hangar Row A – Construction of a new 9-unit T-hangar building, including office space in the south end unit with a single uni-sex restroom, and associated site improvements. Site improvements include miscellaneous demolition, taxilane modifications, access road modifications, new vehicular parking spaces, concrete sidewalk, utility modifications/connections, storm sewer improvements, and stormwater retention pond. Hangar Row J – Construction of a new 10-unit T-hangar building and associated site improvements, including miscellaneous demolition, new taxilane construction, taxilane modifications, access road modifications, new vehicular parking spaces, concrete sidewalk, utility modifications/connections, storm sewer improvements, and stormwater retention pond improvements. Bid Additive 1: Hangars K, L, & M – Construction of two additional hangar units on
the south end of each of the existing hangar buildings K, L, & M (six units total); and associated site improvements including miscellaneous demolition, taxilane construction, access roads, new vehicular parking spaces, concrete sidewalk, and utility improvements. Bid Additive 2:Hangar Row T – Construction of a new 8-unit T-hangar building and associated site improvements including miscellaneous demolition of remaining site pavement and underground utilities/storm-sewer, taxilane modifications, access road modifications, new vehicular parking spaces, concrete sidewalk, utility modifications/connections, and storm sewer improvements. Bid Additive 3:Aircraft Door Replacement for Hangars K, L, & M – Removal of existing bi-fold aircraft hangar doors and installation of new hydraulic aircraft hangar doors for the 36 existing hangar units.Ads: Advertisement T Hangars.pdf 88.5 KB Dates: Pre-Bid Meeting Thu, Mar 7 2:00 pm Last Day for Questions Fri, Mar 15 5:00 pm Bid Opening Thu, Mar 28 2:00 pm Contacts Matt Singletary msingletary@passero.com Pre-Bid Meeting: Pre-bid Mtg.pdf 1.4 MB Addenda / RFI Logs: Addendum 1 (pdf) 12.3 KB Addendum 2 (pdf) 2.1 MB Plan Holder Lists: PHL 3 26 2024 (pdf) 203.8 KB Bid Results: Bid Summary (pdf) 58.6 KB

242 West Main Street Suite 100 Rochester, NY 14614,USALocation

Address: 242 West Main Street Suite 100 Rochester, NY 14614,USA

Country : United StatesState : New York

You may also like

Design Services for Southwest Florida International Airport Terminal Expansion

Due: 01 Jan, 2025 (in 8 months)Agency: Southwest Florida International Airport

PSC East GA Apron Improvements - Tri-Cities Airport 9.27% DBE COA Goal

Due: 29 Apr, 2024 (Tomorrow)Agency: Ben Franklin Transit

PROJECT: MID-ATLANTIC REGIONAL CONSTRUCTION IDIQ MATOC.

Due: 07 May, 2025 (in 12 months)Agency: FEDERAL HIGHWAY ADMINISTRATION

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.