DFCM Construction-DWR Logan FES Water Collection/Distribution Reconstruction-22388520

expired opportunity(Expired)
From: Utah(State)
MW23015

Basic Details

started - 12 Oct, 2022 (18 months ago)

Start Date

12 Oct, 2022 (18 months ago)
due - 01 Dec, 2022 (16 months ago)

Due Date

01 Dec, 2022 (16 months ago)
Bid Notification

Type

Bid Notification
MW23015

Identifier

MW23015
State of Utah

Customer / Agency

State of Utah
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

12 October 2022 DFCM Construction-DWR Logan FES Water Collection/Distribution Reconstruction-22388520 DFCM Construction-DWR Logan FES Water Collection/Distribution Reconstruction-22388520-Single Project Multi-Step 12 October 2022 Open 10/12/2022 3:00 PM MDT Type Invitation for Bid Close 12/1/2022 3:00 PM MST Number MW23015 Currency US Dollar Sealed Until 12/1/2022 3:00 PM MST 12 October 2022 Contacts Tim Parkinson timkparkinson@utah.gov 12 October 2022 Commodity Codes Commodity Code Description 99901 DFCM Division Facilities and Construction and Managment 72120 Nonresidential building construction services including commercial and office building new construction services and construction services and renovation and repair services 12 October 202212 October 202212 October 2022 mailto:timkparkinson@utah.gov *ACKNOWLEDGEMENT OF THE DFCM GENERAL CONDITIONS AND OTHER
POLICIES IS NOW REQUIRED TO VIEW THIS EVENT* CONTRACTORS WISHING TO VIEW THE BIDDING DOCUMENTS MUST CREATE AN ACCOUNT AND SIGN INTO THE UTAH PUBLIC PROCUREMENT PLACE WEBSITE. NOTICE TO CONTRACTORS The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the following project: WATER COLLECTION AND DISTRIBUTION RECONSTRUCTION - LOGAN FISHERIES EXPERIMENT STATION DIVISION OF WILDLIFE RESOURCES LOGAN, UTAH DFCM PROJECT #22388520 Project Description: The existing warm and cold water well supply collection and distribution pipelines consist of varying pipe materials of varying age and have diameters ranging from 4” to 12” in diameter. A majority of the 6” and larger diameter pipelines are concrete-encased steel pipe which, over time, have developed leaks. The primary purpose of this project is to remove, dispose of, and replace these aging pipelines with DR17 D.I.P.S PE4710 HDPE pipe having fused/welded fittings, joints, and/or connections. In conjunction with the removal and replacement of the warm water distribution system, the existing fish food storage building is to be removed, disposed of, and replaced in-situ with a prefabricated, heavily-insulated metal building (under deferred submittal). Well Nos. 22 and 23 are to be constructed with control valves, bypass discharge, and flow meter. Construction Cost Estimate: $490,000.00 DFCM is entering into a Multi-Step Bidding Process for Construction Services. A short-listing of Contractors will be based on the evaluation of proposals submitted and the selection criteria outlined in the solicitation documents contained herein. Short-listed Contractors will be invited to submit bids on the project. The only Contractors allowed to bid on this project will be Contractors short-listed by the selection committee. All Contractors responding to this procurement must comply with and require all of their Subcontractors to comply with the license laws as required by the State of Utah. The Multi-Step Bidding Process Request for Proposals documents which will be available at 3:00 PM on Wednesday, October 12, 2022 on the Utah Public Procurement Place (U3P) website (and can also be accessed via the DFCM website - Electronic Bidding) will provide the requirements, due dates, and times of all proposals and bids in addition to dates, times and locations of important events and meetings. For questions regarding this project, please contact Tim K. Parkinson | timkparkinson@utah.gov | 801-450-2478. No others are to be contacted regarding this project. A MANDATORY Pre-Bid Meeting to discuss the Multi-Step Bidding Process will be held at 11:00 AM on Wednesday, October 26, 2022 in the Fisheries Experiment Station Building Breakroom, 1465 West 200 North, Logan, Utah. All Contractors wishing to bid on this project are required to attend this meeting. The Division of Facilities Construction and Management reserves the right to reject any or all bids or to waive any formality or technicality in any bid in the interest of the State. Description

195 N 1950 W, Salt Lake City, UT 84116, United StatesLocation

Address: 195 N 1950 W, Salt Lake City, UT 84116, United States

Country : United StatesState : Utah

You may also like

Culligan Water Conditioning contract to service water conditioner at SEVC

Due: 30 Jun, 2024 (in 2 months)Agency: Military and Veterans Affairs

Request for Prequalification of Contractors for Water, Sewer & Water Reclamation Projects

Due: 26 Feb, 2026 (in 22 months)Agency: Purchasing Department

DC WATER AND SEWER FEE

Due: 30 Apr, 2024 (in 11 days)Agency: BUREAU OF ENGRAVING AND PRINTING

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.