Institution UNC - Chapel Hill Academic Affairs Institution URL for Additional Information about this Project (Optional) Project Name S-1 Parking Deck & Central Generator Plant Project Manager Nathan Harms Phone Number (919) 843-0849 Contact Email nathan.harms@fac.unc.edu Pre-Bid Date 04/12/2019 Pre-Bid Time 2:00 pm Pre-proposal Location Giles Horney Bldg., Magnolia Conf Room, 103 Airport Drive Closing Date 04/25/2019 Project Budget $65,000,000 Project Description One-Two Sentences In order to align with the University Masterplan, a co-located Parking Deck and Central Generator Plant are currently in Schematic Design at the site of the existing S-1 Parking Lot. The S-1 Parking Deck is a new 450 space multi-level parking facility. It is expected that the structure will be cast-in-place concrete. The current design includes two stair towers and one elevator. The West extension of Paul Hardin Drive
from Morrison Residence Hall to Emergency Room Drive, a parallel pedestrian pathway, and reconfiguration of a plaza adjacent to the Public Safety Building are also included. Utility reconfiguration and improvements include: steam, chilled water, electrical, telecommunication, sanitary sewer, domestic water, and storm water (including BMP's). The Central Generator Plant and Electrical Modernization project consists of the construction of a new facility to house eight generators to produce 24 mega-watts of emergency power. The building to house the generators and equipment will be approximately 15,000 sf. The new generators will replace the existing generators that are now located in the existing hospital. New underground connections for the emergency power will be required. Renovation for each building to provide separate normal and emergency power electrical rooms will be a part of this project. Although the University and Hospital is collectively selecting one CMR Firm, due to site constraints it is expected that the selected Construction Manager at Risk will hold two construction contracts. One Contract for the scope of work associated with the Central Generator Plant (CGP) and its Hospital Utility Connections; and one contract for the scope of work associated with the Parking Deck including Roadway, Site and Utilities Improvements. The total project budget is $65,000,000 and is being funded by both the University of North Carolina and UNC Hospitals. Submit To UNC Chapel Hill Facilities Planning & Design Att: Tanya Vogel Giles F. Horney Building - Room 210 103 Airport Drive Campus Box 1090 Chapel Hill, NC 27599