Interior Buildout of New Rezen Studio in Existing Fitness ClubCLUB WILL REMAIN OPEN DURING CONSTRUCTIONSTEEL SUPPORTS FOR ROOF TOP EQUIPMENT, ROOF REPAID, MECHANICAL SCOPE NOT SHOWN ON DRAWINGS. PLEASE CONTACT MICHAEL CARNEY (
CARNEY@GLEESONCONSTRUCTORS.COM) FOR CLARIFICATION.Division 2 Demo: Selective Demolition Division 3 Concrete: N/ADivision 4 Masonry: N/ADivision 5 Metals: Cold-Formed Metal Framing, Steel Supports for Roof Top Equipment (Not shown on Drawings)Division 6 Wood and Plastics: Wood Treatment, Rough Carpentry, Paneling, Solid Surface Countertops Custom Millwork (By Owner Vendor)Division 7 Thermal and Moisture Protection: Roof Repair (Not Shown on Drawings) Division 8 Doors and Windows: Doors, Door Hardware, Glazing, (Glass Contractor shall include their Hardware), Aluminum- Frames Windows and DoorsDivision 9 Finishes: Gypsum Board Assemblies, Tile, Acoustical Ceilings, Resilient Tile Flooring, Carpet,
Painting, Wall Coverings Division 10 Specialties: Lockers Division 11 Equipment: N/ADivision 12 Furnishings: N/ADivision 13 Special Construction: Fire AlarmDivision 15 Mechanical: Mechanical Demolition, Relocation and Alteration, Mechanical Insulation, Fire Protection, Packaged Rooftop Air Conditioning Units, Air Distribution, TAB (Not shown on Drawings) Division 16 Electrical: Electrical Demolition, Relocation and Alteration, Grounding and Bonding, Electrical Hangers and Supports, Overcurrent Protective Device Coordination Study, Electrical Identification, Building Wire and Cable, Raceway and Boxes, Wiring Devices, Floor Boxes, Enclosed Switches, Enclosed Circuit Breakers, Enclosed Controllers, Switchboards and Panelboards, Dry Type Transformers, Interior Luminaires, Low Voltage and CCTV Conduit System (Please review all drawings for owner supplied items, EC to provide power) Number E24-131 Title LA Fitness-Aliana-Richmond, TX Available Date 3/11/2024 2:00 PM Due Date 4/2/2024 2:00 PM Contact Information Bid Type