Steam Repairs Phase VIIIC

expired opportunity(Expired)
From: North Carolina University(Higher Education)
Steam Repairs Phase VIIIC

Basic Details

started - 29 Oct, 2018 (about 5 years ago)

Start Date

29 Oct, 2018 (about 5 years ago)
due - 16 Nov, 2018 (about 5 years ago)

Due Date

16 Nov, 2018 (about 5 years ago)
Bid Notification

Type

Bid Notification
Steam Repairs Phase VIIIC

Identifier

Steam Repairs Phase VIIIC
The University of North Carolina

Customer / Agency

The University of North Carolina
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

 Institution NC State University  Institution URL for Additional
Information about this Project (Optional) https://facilities.ofa.ncsu.edu/category/ads/  Project Name Steam Repairs Phase VIIIC  Prequalifying for North Carolina State University is seeking qualification
statements from general contractors for improvements to
Steam Repairs Phase VIIIC, located on North Campus. This
project will complete upgrades to the steam and condensate
piping in the North Campus walkable steam tunnel, trench and
mechanical rooms of DH Hill Library. The scope includes
asbestos abatement of all insulation around existing steam
pipe; removal of the 30 psi steam pipe and associated
condensate pipe; removal of the existing Pressure Reducing
Valve (PRV) station that was installed as part of the
previous phase and reuse some of the valves and fittings;
removal of the existing hangers
for the pipes along the
walkable tunnel; excavation of the area over the trench
located south of the Atrium; installation of new 150 psi
steam pipe and condensate pipe; installation of new
structural supports including anchors and guides for the
steam and condensate lines; installation of new insulation
around the new 150 psi steam pipe; building and installation
of new PRV stations in the mechanical rooms to convert the
incoming 150 psi steam to 30 psi steam; installation of taps
on the tunnel steam and condensate pipes to allow for use in
future buildings adjacent to the site. The construction is
expected to be done in two phases: the North-South walkable
tunnel in summer 2019, and the East-West trench and building
interior work in summer 2020.  Main Contact for Submission Campus Contact  Name of Design Firm RMF Engineering  Design Firm Contact Name Jonathan Eveleth  Design Firm Telephone Number (919) 941-9876  Design Firm Email jonathan.eveleth@rmf.com  CM at Risk Firm Name   CM at Risk Firm Email   Campus Contact Email llzaytou@ncsu.edu  Due Date 11/16/2018  Due Time 3:00 pm  Submit To NC State University
Laura L Zaytoun
Capital Project Management
2701 Sullivan Drive, Suite 331
Campus Box 7520
Raleigh, NC 27695-7520

Phone: 919-515-8049 

UNC System Office, Chapel Hill, NC 27514Location

Address: UNC System Office, Chapel Hill, NC 27514

Country : United StatesState : North Carolina

You may also like

EMERGENCY REPAIR OF CHILLER COMPRESSOR

Due: 27 Aug, 2024 (in 3 months)Agency: VETERANS AFFAIRS, DEPARTMENT OF

FAY ANNUAL BOILER SAFETY TESTING AND REPAIR.

Due: 01 May, 2029 (in about 5 years)Agency: VETERANS AFFAIRS, DEPARTMENT OF

COOLING TOWER BLOWDOWN LINES

Due: 23 Jun, 2024 (in 1 month)Agency: NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.

Classification

Construction