Pearland Parkway Traffic Improvements (COP PN: TR1902): The project will entail the construction of intersection improvements for Pearland Parkway & Forest Park Lane/Summit Springs Lane, including construction of a traffic signal and the extension of left turn bays. The project also includes installation and testing of fiber optic cable via 4” ITS Multiduct along McHard Road & Pearland Parkway from Old Alvin Road to Barry Rose Road/Hughes Road.
Pearland Parkway Traffic Circle Modifications (COP PN: TR1903): The project will entail the construction of a roundabout in the Pearland Parkway and McHard Rd. intersection. It will include an additional lane along Pearland Parkway as well as a driveway into the University of Houston Clear Lake Campus. Besides the proposed roadway construction, the project will entail the extension of an existing storm sewer system, relocation of illumination structures, relocation of an electric meter, demolition of 2 monument signs and the extension of existing sidewalk.
Intersection Improvements – Windward Bay/Broadway (COP PN: TR1803): The project will entail the construction of intersection improvements for Windward Bay Drive and Broadway Street including construction of a fully actuated traffic signal, extension and widening of existing eastbound and westbound left turn lanes, traffic signage, and pavement markings. The project also includes installation and testing of fiber optic cable via 4” ITS Multiduct, communication ground boxes, and fiber markers along Broadway Street from Shadow Creek High School to Windward Bay Drive. Fiber interconnect will be provided to three traffic signals along Broadway Street (including Windward Bay Drive signal). The project includes the construction of left turn lanes at two additional locations in the City of Pearland: Pearland Parkway at Oak Ridge and Dixie Farm Road near Long Oak