GOLETA VALLEY COMMUNITY CENTER SEISMIC RETROFIT PROJECT

expired opportunity(Expired)
From: Goleta(City)
22-03

Basic Details

started - 09 Nov, 2022 (17 months ago)

Start Date

09 Nov, 2022 (17 months ago)
due - 19 Dec, 2022 (16 months ago)

Due Date

19 Dec, 2022 (16 months ago)
Bid Notification

Type

Bid Notification
22-03

Identifier

22-03
General Services

Customer / Agency

General Services
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Project Title GOLETA VALLEY COMMUNITY CENTER SEISMIC RETROFIT PROJECT Invitation # 22-03 Bid Posting Date 11/09/2022 11:47 AM (PST) Project Stage Bidding Bid Due Date 12/19/2022 2:00 PM (PST) Response Format Electronic Project Type Bid Response Types Line Items Bid Forms - 1.1 Bid (required) Bid Forms - 1.2 Bid Bond (required) Bid Forms - 1.3 List of Subcontractors (required) Bid Forms - Article 34 - Information About Bidder (required) Bid Forms - Article 35 - List of Current Projects (Backlog) (required) Bid Forms - Article 36 - List of Completed Projects - Last Three Years (required) Bid Forms - Article 37 - Experience and Technical Qualifications Questionnaire (required) Bid Forms - Article 38 - Verification and Execution (required) Bid Forms - 1.5 - Non-Collusion Declaration (required) Bid Forms - 1.6 Iran Contracting Act Certification (required) Bid Forms 1.7 - Public Works Contractor Registration Certification (required) Bid Forms 1.8 - Contractor's Certificate Regarding
Workers' Compensation (required) Type of Award Lump Sum Categories 236220 - Commercial and Institutional Building Construction 238110 - Poured Concrete Foundation and Structure Contractors 238160 - Roofing Contractors 238190 - Other Foundation, Structure, and Building Exterior Contractors License Requirements Valid Class "A" or Class "B". Valid C-22 (asbestos), C-7 (low voltage), C-21 (building moving/demolition) Department General Services Address 130 Cremona Drive Suite B Goleta, California 93117 County Santa Barbara Bid Valid 90 days after bid opening date Liquidated Damages $2000 per day for each day of unauthorized delay beyond the completion date Estimated Bid Value 5,000,000.00 Start/Delivery Date February 2023 Project Duration 90 Calendar Days - delay in receiving materials is not included in the number of calendar days Bid Bond Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Pre-Bid Meeting Information Pre-Bid Meeting Yes - Mandatory Pre-Bid Meeting Date 11/29/2022 2:00 PM (PST) Pre-Bid Meeting Location Goleta Community Center - 5679 Hollister Ave., Goleta, CA 93117 Online Q&A Online Q&A Yes Q&A Deadline 12/06/2022 2:00 PM (PST) Contact Information Contact Info Matt Fore 805-562-5507 mfore@CityofGoleta.org Bids to Owner's Agent Description Scope of Services A. The Contractor shall provide all materials, labor, tools, plant, supplies, equipment, transportation, superintendence, temporary construction of every nature, and all other services and facilities necessary to complete the construction of the Goleta Valley Community Center, including all incidental work described in the contract documents. B. The general scope of work is contained in the contract documents: C. The scope of work includes all work described in this spec and also what is shown in the construction documents, but is not limited to the following: 1. Anchorage and strengthening of existing wood diaphragms and truss connections to existing concrete walls. 2. Extent of all existing “sprung” floor locations to be verified in field. 3. Patch & paint interior drywall and new exterior plaster. 4. Provide seismic bracing for non-structural elements. 5. Remove existing roofing in its entirety down to the existing plank sheathing. Remove all existing roof crickets and built-up areas prior to installing new structural sheathing. Provide new roofing system. 6. Repair deteriorated and damaged rafter tails and exposed wood elements. 7. Extend roof drains to drain into existing planter including selective demolition entrance planter. 8. Remove existing skylight and replace on a new curb. 9. Interior painted mural at the east wall of the Dining Room shall not be disturbed. 10. Removal of floor finishes as required to install new boundary and floor nailing. Reinstall carpet following repairs. 11. Fully cooperate with all City agencies and others who might be working within the premise of the proposed project site. 12. Contractor to obtain building permit(s) from the City’s Building and Safety Division. Contractor shall pay for the permit fee. Plans have been approved by the Building and Safety Division. 13. Install electrical power and water connections for all contractors use. Provide and install one toilet, fencing with green screening around the construction site and dumpster/laydown area (if needed, with prior approval of location from City Engineer). Contractor is not permitted to use the existing restrooms, kitchen, or break rooms in the Goleta Valley Community Center building during the course of the construction. 14. The contractor is responsible to familiarize themselves with the existing utilities and electronic systems inside and outside the building project to facilitate their work on this project. 15. The contractor is responsible for providing all required insurance, bonds, schedule of values, construction schedules, monthly updated schedules, attending weekly Owner, Architect, Contractor meetings, submitting monthly invoices, certified payrolls, three sets of closeout binders. 16. Contractor shall maintain during construction and provide final as-built drawings at completion of project. 17. No excavations (such as for landscaping planters) directly adjacent to perimeter walls are permitted. D. All work shall be in accordance with applicable codes and local regulations that may apply. In case of conflict in or between the Contract Documents and a governing code or ordinance, the more stringent standard shall apply. Other Details Notes Special Notices Local Programs & Policies Place eBid

130 Cremona Drive Suite B Goleta, CaliforniaLocation

Address: 130 Cremona Drive Suite B Goleta, California

Country : United StatesState : California

You may also like

Designs for the St. John Community Safe Room/Building Retrofit project.

Due: 20 Sep, 2024 (in 4 months)Agency: Department of Sports Parks and Recreation

SAN FRANCISCO VA MEDICAL CENTER BUILDING 8 SEISMIC RETROFIT PROJECT

Due: 15 Apr, 2025 (in 11 months)Agency: DEPT OF DEFENSE