The design an 8-inch water main, largely within SHA right of way from the intersection of Main Street (south extension) and Castle Marina Road west to the intersection of Main Street and Shopping Center Road. The design is time critical. As detailed following, once an alignment is determined, the Project will solely be for the drafting and plan sheet generation, as well as preparing permit applications. Common construction details will be provided by the County for incorporation into a plan sheet. Basic sediment control sheet can be provided by the County although may need updating or modification. Traffic control will utilize standard SHA details. The County will handle the Project Manual, specifications, bidding (other than pre-bid participation), and construction