Solid Waste requires professional consulting services associated with landfill management and other related landfill ancillary facilities, programs, projects, and other related activities on an as needed basis. BackgroundCurrent contract for same services is set to expire on August 19, 2024. The consulting services described in the SOW are needed on a continual basis. Below is a list of projected costs associated with the use of this contract. Note: With the exception of the annual regulatory reporting and performance monitoring task, the list of projects are potential and the values and timing are estimates only. Regulatory reporting and performance monitoring for Toytown and BWA landfills (annual) - 250k Site Life ReportingWater Quality Monitoring/ReportingFinancial AssuranceRecord Buildout Drawings (Landfill)Permitting AssistanceToytown gradient study, $200k (FY25)Landfill Solar Energy on closed slopes feasibility, $250k (FY28)Pond A East side slope improvement $100k (FY25)Pond B Vegetation assessment $100k (FY27)Site civil engineering for micro-grid, $400k (FY25)Pond B to A ditch improvements, $300 (FY27)Bulky Waste feasibility Study, $500k (FY26)Landfill Expansion Master plan, $500k (FY29)Leachate transfer from Toytown to BWA, $500k (FY26)Water truck fill station from IWTF, $100k (FY25)Removal of vegetative nuisance species and replace vegetative buffer $150k (FY28)Site exit road transitions modification, $100k (FY27)Mulch Improvement designs, $100k (FY26)Recycling center improvements, $150k (FY25)Recycling program expansion studies, $200k (FY26)WTE (N-S) ditch improvement, $150k (FY28)Dust suppression water piping to metals cleaning, $100k (FY25)West Landfill side slope assessment, $75k (FY27)LFG extraction and energy recovery feasibility, $200k (FY28)TimelineRelease Project Date:November 30, 2023Question Submission Deadline:January 4, 2024, 3:00pmSubmission Deadline:January 23, 2024,