Project: Pine Lakes Estates Main Replacement Project Ref. #: IFB-24-109 Type: IFB Status: Open Open Date: Apr 3rd 2024, 12:00 PM EDT Questions Due Date: Apr 22nd 2024, 12:00 PM EDT Close Date: May 9th 2024, 2:00 PM EDT Days Left: 5 Project Description:The Work to be done includes furnishing all labor, equipment and materials necessary to construct the water main replacement project in two (2) phases all-inclusive of the following: Phase 1 includes the construction of approximately 2,500 lineal feet of 10” PVC (C900/DR-18) water main, 360 lineal feet of 8” PVC (C900/DR-18) water main, 100 lineal feet of 6” PVC (C900/DR-18) water main, 340 lineal feet of 8” HDPE (DR-11) directional bore water main, 6” through 12” wet tap connections to existing mains, asphalt roadway open cut and repair with final mill and resurfacing, concrete curb removal and replacement, isolation valves, fire hydrants, new residential services, relocation of existing meters requiring access to private property and
City of St. Cloud applicable permits and the usual appurtenances. The project also includes the abandonment in place of existing water mains via grouting. The contractor shall note that some existing water mains are asbestos cement pipe and if sections are removed all applicable regulations will apply in regards to handling and disposal of the materials. Phase 2 includes the construction of approximately 4,800 lineal feet of 8” PVC (C900/DR-18) water main, 65 lineal feet of 6” PVC (C900/DR-18) water main, 6” through 12” wet tap connections to existing mains, asphalt roadway open cut and repair with final mill and resurfacing, concrete curb removal and replacement, isolation valves, fire hydrants, new residential services, relocation of existing meters requiring access to private property and City of St. Cloud applicable permits and the usual appurtenances. The project also includes the abandonment in place of existing water mains via grouting. The contractor shall note that some existing water mains are asbestos cement pipe and if sections are removed all applicable regulations will apply in regard to handling and disposal of the materials. The project is being completed in two phases to allow for the use of grant funding as described in Appendix B. Contractors shall note that phase 1 work shall be issued final completion by Toho prior to work commencing on phase 2 of the project. The work in phase 1 shall also be finalized by the prescribed time line for substantial and final completion for this phase 1 of the project. Important Events:OngoingOpen DateOnline PortalPosting date for the OpportunityApr 3rd 2024, 12:00 PM EDTN/AUpcomingClose DateOnline PortalDeadline for SubmissionsMay 9th 2024, 2:00 PM EDTN/APassedQuestions Due DateOnline PortalDeadline to submit QuestionsApr 22nd 2024, 12:00 PM EDTN/A Supporting Documentation:Addendum #1 IFB-24-109.pdfAddendaAddendum #1 IFB-24-109Apr 22nd 2024, 12:51 PM EDT - IFB-24-109 Pine Lakes Estates Water Main.pdfDocumentationBid documents IFB-24-109Apr 3rd 2024, 10:31 AM EDT - IFB-24-109 Pine Lakes WM Replacement Plans-signed (1).pdfDocumentationBid Plans IFB-24-109Apr 3rd 2024, 10:31 AM EDT - Commodity Codes: UNSPSC 22 Building and Construction Machinery and Accessories: This segment includes the machines and accessories used in support of the construction, repair and maintenance of structures and roads. UNSPSC 70 Farming and Fishing and Forestry and Wildlife Contracting Services: This segment includes services associated with the production, management and protection of plants, soil and land resources as well as those related to the breeding of animals and services related to wildlife. UNSPSC 83 Public Utilities and Public Sector Related Services: This segment includes services associated with the supply of power and water as well as the provision, management or enhancement of voice or data communications such as postal, telex, fax and telephone charges. This segment also includes the cable and satellite television, installation and service charges UNSPSC 95 Land and Buildings and Structures and Thoroughfares: Land and waterways and related real property physical and structural assets