tewater Treatment Plant UV Disinfection Replacement Plans

From: City of Franklin(City)

Basic Details

started - 15 Dec, 2023 (4 months ago)

Start Date

15 Dec, 2023 (4 months ago)
due -

Due Date

N/A
Bid Notification

Type

Bid Notification

Identifier

N/A
CITY OF FRANKLIN

Customer / Agency

CITY OF FRANKLIN
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

© 2023 Microsoft Corporation © 2023 TomTom "MISS UTILITY" DIAL - 811 PRIOR TO CONSTRUCTION, CONTRACTOR SHALL FOR LOCATION OF UNDERGROUND UTILITIES OF VIRGINIA CALL ® FRANKLIN WASTEWATER TREATMENT PLANT UV DISINFECTION REPLACEMENT DECEMBER 27, 2023 VICINITY MAP 1' = 1000' NORTH © PROJECT LOCATION FR AN KL IN W AS TE W AT ER TR EA TM EN T PL AN T U V D IS IN FE C TI O N R EP LA C EM EN T PR EP AR ED F O R C IT Y O F FR AN KL IN Sheet List Table 1. WARRANTY/DISCLAMER: THE DESIGNS REPRESENTED IN THESE PLANS ARE IN ACCORDANCE WITH ESTABLISHED PRACTICES OF CIVIL ENGINEERING FOR THE DESIGN FUNCTIONS AND USES INTENDED BY THE OWNER AT THIS TIME. HOWEVER, NEITHER THE ENGINEER NOR ITS PERSONNEL CAN OR DO WARRANT THESE DESIGNS OR PLANS AS CONSTRUCTED EXCEPT IN THE SPECIFIC CASES WHERE THE ENGINEER INSPECTS AND CONTROLS THE PHYSICAL CONSTRUCTION ON A CONTINUOUS BASIS AT THE SITE. 2. SAFETY NOTICE TO CONTRACTOR: IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR SHALL BE
SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS OF THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. ANY CONSTRUCTION INTENDED TO INCLUDE REVIEW OF THE ADEQUACY OF THE CONTRACTOR’S SAFETY MEASURES, IN, ON OR NEAR THE CONSTRUCTION SITE. 3. ALL MATERIALS AND METHODS OF CONSTRUCTION SHALL CONFORM TO THE CURRENT EDITION OF THE CITY OF FRANKLIN CONSTRUCTION SPECIFICATIONS AND STANDARDS AND HAMPTON ROADS PLANNING DISTRICT COMMISSION REGIONAL CONSTRUCTION STANDARDS. 4. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE CITY AND THE AFFECTED UTILITY, IN THE EVENT THAT ANY UTILITIES ARE DAMAGED DURING CONSTRUCTION. ANY UTILITIES DAMAGED AS A RESULT OF THE CONSTRUCTION SHALL BE REPLACED OR REPAIRED TO THE SATISFACTION OF THE UTILITY OWNER AT NO ADDITIONAL COST TO THE PROJECT. A. CITY OF FRANKLIN PUBLIC WORKS (757-562-8563) 5. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY SHOULD ANY FIELD CONDITIONS BE ENCOUNTERED THAT VARY FROM THE INFORMATION PROVIDED IN THE CONTRACT DOCUMENTS. 6. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION, ELEVATION, ORIENTATION, DIMENSIONS, MATERIALS, ETC. OF EXISTING PIPE PRIOR TO ORDERING MATERIAL AND SHALL USE NECESSARY FITTINGS FOR CONNECTIONS. 7. THE CONTRACTOR SHALL RESTORE GRADE TO PRE-CONSTRUCTION CONDITION UNLESS OTHERWISE NOTED ON THE DRAWINGS. 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL EQUIPMENT, MATERIAL AND GENERAL CONSTRUCTION DEBRIS FROM THE SITE, STREET, PUBLIC RIGHT OF WAY OR PROPERTY THEREIN OR ADJACENT THERETO. DUMPING OF SUCH DEBRIS INTO SEWERS, ONTO ADJACENT PROPERTY OR ONTO OTHER LAND IN THE CITY IS PROHIBITED. 9. THE CONTRACTOR SHALL NOT PARK EQUIPMENT IN THE RIGHT OF WAY OVERNIGHT OR ON WEEKENDS WITHOUT PRIOR PERMISSION FROM THE CITY OF FRANKLIN. 10. ALL CONSTRUCTION SHALL BE CONTAINED WITHIN THE LIMITS OF THE PUBLIC RIGHT OF WAY AND CITY OF FRANKLIN PROPERTY, UNLESS OTHER AGREEMENTS BETWEEN THE CONTRACTOR AND PRIVATE LAND OWNER(S) ARE ESTABLISHED. THE CONTRACTOR SHALL PROVIDE THE CITY WITH A COPY OF ALL FINAL AGREEMENTS FOR THE USE OF PRIVATE LAND(S). 11. VEHICULAR INGRESS AND EGRESS FOR PROPERTIES ALONG THE AFFECTED RIGHT OF WAY, INCLUDING BUT NOT LIMITED TO MAIL AND PARCEL DELIVERY, SCHOOL BUSES, REFUSE COLLECTION, POLICE, FIRE AND OTHER EMERGENCY VEHICLES, ETC., SHALL BE MAINTAINED AT ALL TIMES. 12. THE CONTRACTOR SHALL INSTALL EROSION CONTROL MEASURES IN ACCORDANCE WITH THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND THE CITY OF FRANKLIN EROSION AND SEDIMENT CONTROL ORDINANCE. 13. EXCESS EXCAVATED MATERIAL SHALL BE DISPOSED OF OFF-SITE. A SOIL AND EROSION CONTROL PLAN SHALL BE SUBMITTED BY THE CONTRACTOR AND APPROVED FOR THE DISPOSAL SITE(S). 14. FINAL INSPECTION SHALL BE REQUIRED BY THE CITY OF FRANKLIN PRIOR TO ACCEPTANCE OF THE PROJECT. 15. THE CONTRACTOR SHALL REPAIR OR REPLACE ALL PAVED OR GRAVEL DRIVEWAYS, CURB AND GUTTER, AND CONCRETE APRONS DAMAGED DURING CONSTRUCTION IN ACCORDANCE WITH ALL APPLICABLE REQUIREMENTS OF THE CONTRACT DOCUMENTS AND THE CITY OF FRANKLIN CONSTRUCTION SPECIFICATIONS. 16. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL SHEETING REQUIRED FOR THE PROJECT AND THE SHEETING SHALL BE INSTALLED AS REQUIRED TO PROTECT EXISTING UTILITIES. 17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING AND MAINTAINING ALL LINES AND GRADES. 18. ALL ROADWAYS SHALL BE KEPT FREE OF MUD AND DEBRIS AND SHALL BE CLEANED AT THE END OF EACH WORK DAY. 19. DAMAGE TO EXISTING PAVEMENT AREAS OUTSIDE THE LIMITS SHOWN IN THE DETAILS WILL BE RESTORED BY THE CONTRACTOR BY PAVEMENT REPLACEMENT REPAIR FOLLOWED BY MILLING AND OVERLAYING AT NO ADDITIONAL COST TO THE PROJECT. 20. THE CONTRACTOR SHALL COMPLY WITH THE TERMS OF THE "UNDERGROUND UTILITY DAMAGE PREVENTION ACT" TITLE 56, CHAPTER 10.3, SECTIONS 56-265.14 THROUGH 56-265.29 OF THE CODE OF VIRGINIA, AS AMENDED, PRIOR TO DOING ANY EXCAVATION TO ENSURE THAT NO DAMAGE WILL BE DONE TO EXISTING UNDERGROUND FACILITIES AND AGREES TO HOLD THE CITY OF FRANKLIN AND THE ENGINEER HARMLESS AGAINST ANY LOSS, DAMAGES, OR CLAIMS OF ANY NATURE WHATSOEVER ARISING OUT OF THE CONTRACTOR'S FAILURE TO SO COMPLY WITH THE REQUIREMENTS OF SAID ACT. WHERE UNDERGROUND FACILITIES ARE ENCOUNTERED, THEY SHALL BE PROTECTED, EVEN TO THE EXTENT THAT HAND EXCAVATION SHALL BE PERFORMED. 21. THE WORK IN THIS CONTRACT WILL BE PERFORMED ADJACENT TO OVERHEAD POWER LINES. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS FOR EQUIPMENT AND MATERIALS OR OTHER MEASURES AS REQUIRED FOR PROTECTION FROM INDUCED CURRENTS OR SHOCK HAZARD. CONTRACTOR SHALL COMPLY WITH THE "OVERHEAD HIGH VOLTAGE LINE SAFETY ACT" (SECTION 59.1-406, ET. SEC. OF THE CODE OF VIRGINIA). 22. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION SCHEDULE AND ACTIVITIES THROUGH CHAD EDWARDS OF THE CITY OF FRANKLIN'S DEPARTMENT OF PUBLIC UTILITIES (757-562-8564). © FR AN KL IN W AS TE W AT ER TR EA TM EN T PL AN T U V D IS IN FE C TI O N R EP LA C EM EN T PR EP AR ED F O R C IT Y O F FR AN KL IN 1. THE CONTRACTOR SHALL COORDINATE THE DEMOLITION OF THE ELECTRICAL CONDUIT, WIRE, EQUIPMENT AND DEVICES WITH THE GENERAL DEMOLITION AND SCHEDULE. THE DRAWINGS ARE INTENDED TO CONVEY THE GENERAL NATURE AND SCOPE OF THE DEMOLITION WORK. EVERY ITEM TO BE DEMOLISHED MAY NOT BE SHOWN.FIELD VERIFY WITH OWNER PRIOR TO BID, AND INCLUDE ALL DEMOLITION WORK IN THE CONTRACT PRICE. 2. PROVIDE TEMPORARY WIRE AND CONDUIT FOR THE EQUIPMENT WHICH MAY BE AFFECTED BY THE DEMOLITION BUT TO REMAIN IN SERVICE. WHERE NECESSARY TO MAINTAIN PLANT OPERATION, THE CONTRACTOR SHALL PROVIDE A GENERATOR OR GENERATORS TO KEEP THE PROCESS IN OPERATION WHILE SERVICE SWITCHOVER IS BEING PERFORMED. 3. RELOCATE AND RECONNECT POWER AND CONTROL RACEWAYS AND CONDUCTORS TO EQUIPMENT AFFECTED BY DEMOLITION WORK. 4. ALL CONDUCTORS BEING DEMOLISHED SHALL BE DISCONNECTED AND REMOVED FROM THE LOAD TO THE SURFACE MOUNTED CONDUITS AND MOUNTING HARDWARE SHALL BE REMOVED. UNDERGROUND CONDUITS WHICH ARE NOT BEING REMOVED OR NOT BEING REUSED SHALL BE CAPPED AND TAGGED AS SPARE, WITH INFORMATION CLEARLY INDICATING THE LOCATION OF THE OTHER END, UNLESS NOTED OTHERWISE. 5. ALL SURFACES WHERE DEMOLISHED EQUIPMENT OR CONDUIT IS REMOVED SHALL BE CLEANED, PATCHED AND PAINTED TO MATCH THE SURROUNDING SURFACE. 6. THE CONTRACTOR SHALL BE RESPONSIBLE TO CHECK THE FUNCTION OF EACH CONDUCTOR BEFORE REMOVING OR DISCONNECTING. 7. THE CONTRACTOR SHALL FIELD VERIFY PRIOR TO BID TO DETERMINE IF CONDUCTORS WHICH ARE TO STAY IN SERVICE (NOT BEING DEMOLISHED) ARE INSTALLED IN A COMMON CONDUIT WITH CONDUCTORS WHICH ARE BEING DEMOLISHED, THE CONTRACTOR SHALL REMOVE ALL CONDUCTORS FROM THE CONDUIT, PROVIDE NEW CONDUCTORS WHICH ARE REPLACEMENTS FOR THE CONDUCTORS THAT ARE TO REMAIN IN SERVICE AND RE-INSTALL THE NEW CONDUCTORS. AFTER THE CONDUCTORS ARE PULLED, MEGGER OR HIPOT TEST EACH CONDUCTOR. CONNECT BOTH ENDS OF THE NEW CONDUCTORS AND TEST THE SYSTEM FOR PROPER FUNCTION. DO NOT RE-PULL USED CONDUCTORS. 8. WHERE EQUIPMENT IS BEING RE-FED FROM A NEW SOURCE, EXISTING CONDUIT MAY BE REUSED ONLY IF THE CONDUIT AND FITTINGS ARE OF THE TYPE SPECIFIED FOR NEW WORK ON THIS CONTRACT. IF NOT, THE CONDUIT AND CONDUCTORS SHALL BE REPLACED WITH NEW MATERIAL MEETING THE SPECIFICATIONS, AT NO ADDITIONAL COST TO THE OWNER. 9. THE CONTRACTOR SHALL NOT MAKE ANY MODIFICATIONS UNTIL THE FOLLOWING HAS BEEN DONE: 9.1. THE OWNER/CONTRACTOR SHALL WITNESS AND RECORD THE CONDITION OF THE EXISTING EQUIPMENT, THE CONTRACTOR SHALL NOTE DOWN ANY DEFECTS OR DEFICIENCIES. 9.2. THE OWNER SHALL OPERATE THE EQUIPMENT TO DEMONSTRATE THE CURRENT CONDITIONS. THE CONTRACTOR SHALL NOTE DOWN ANY DEFECTS OR DEFICIENCIES. 9.3. A WRITTEN AND PHOTOGRAPHIC RECORD OF THE OPERATION AND EXISTING CONDITION SHALL BE KEPT IN A THREE RING BINDER IN THE OWNERS ADMINISTRATIVE BUILDING, IN FORM OF PICTURES AND INFORMATION ON A FORM. 9.4. A FORM SHALL BE GENERATED BY THE CONTRACTOR TO RECORD THE OBSERVATIONS. BOTH PARTIES SHALL SIGN ON THE FORM. 9.5. AFTER THE CHANGES ARE MADE, THE EQUIPMENT SHALL BE INSPECTED AND RE-TESTED TO DEMONSTRATE THAT IT FUNCTIONS CORRECTLY. 9.6. NO PORTION OF EXISTING CONDUCTORS SHALL BE SPLICED TO NEW CONDUCTORS FOR RE-USE WITHOUT SPECIFIC APPROVAL FROM THE OWNER/ENGINEER ON A CASE-BY-CASE BASIS. 10. THE CONTRACTOR SHALL BE RESPONSIBLE TO FURNISH AND INSTALL MATERIAL OR EQUIPMENT DAMAGED DURING THE COURSE OF HIS WORK 1. ALL EQUIPMENT WIRING, RACEWAYS, ETC. SHALL BE INSTALLED AND GROUNDED IN ACCORDANCE WITH THE LATEST EDITION OF THE NATIONAL ELECTRICAL CODE, LOCAL CODES, AND INDUSTRY STANDARDS (UL, NEMA, IEEE, ANSI, ETC.) THE DRAWING NOTES AND DETAILS SHALL BE COMPLIED WITH IN ADDITION TO THE REQUIREMENTS IN THE SPECIFICATIONS. REFER TO EACH SPECIFICATION SECTION FOR SPECIFIC REQUIREMENTS. 2. ALL RACEWAY INSTALLATIONS SHALL BE INSTALLED IN A MANNER TO PREVENT CONFLICTS WITH EQUIPMENT AND STRUCTURAL CONDITIONS. ALL EXPOSED RACEWAY SHALL BE INSTALLED PARALLEL TO BEAMS, CEILINGS, FLOORS AND WALLS. 3. CONDUITS SHALL BE TERMINATED IN A NEAT MANNER AND STRICTLY IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWING DETAILS. 4. CONDUITS TERMINATED INTO ENCLOSURES SHALL BE PERPENDICULAR TO THE WALLS OF THE ENCLOSURE. THE USE OF SHORT SEALTIGHT ELBOW FITTINGS FOR SUCH TERMINATIONS WILL NOT BE PERMITTED. 5. ALL RACEWAY INSTALLATIONS, CROSSING EXPANSION JOINTS OR TRANSITIONS FROM BELOW GRADE TO EXPOSED ABOVE GRADE, SHALL HAVE EXPANSION OR EXPANSION/DEFLECTION TYPE FITTINGS AS SPECIFIED FOR THE APPLICATION. SEE THE DRAWINGS FOR THE EXACT TYPE OF FITTING TO BE USED. 6. NO EXPOSED CONDUIT SMALLER THAN 3/4", NOR WIRE SMALLER THAN NO. 12 AWG, SHALL BE USED UNLESS SPECIFICALLY NOTED. 7. LIQUID TIGHT FLEXIBLE ALUMINUM CONDUIT SHALL BE USED FOR THE PRIMARY AND SECONDARY OF TRANSFORMERS, GENERATOR TERMINATIONS AND OTHER EQUIPMENT WHERE VIBRATION IS PRESENT. USE IN OTHER LOCATIONS IS NOT PERMITTED, EXCEPT FOR CONNECTIONS TO INSTRUMENTATION TRANSMITTERS, WHERE MULTIPLE PENETRATIONS ARE REQUIRED. LIQUID TIGHT FLEXIBLE ALUMINUM CONDUIT SHALL HAVE A MAXIMUM LENGTH NOT GREATER THAN THAT OF A FACTORY MANUFACTURED LONG RADIUS ELBOW OF THE CONDUIT SIZE BEING USED. THE MAXIMUM BENDING RADIUS SHALL NOT BE LESS THAN THAT SHOWN IN THE NEC CHAPTER 9, TABLE 2, "OTHER BENDS". BX OR AC TYPE PREFABRICATED CABLES WILL NOT BE PERMITTED. 8. THE WIRING DIAGRAMS, BLOCK DIAGRAMS, QUANTITY, SIZE OF WIRES, AND CONDUIT REPRESENT A SUGGESTED ARRANGEMENT BASED UPON SELECTED STANDARD COMPONENTS OF ELECTRICAL EQUIPMENT. MODIFICATIONS ACCEPTABLE TO THE ENGINEER MAY BE MADE BY THE CONTRACTOR TO ACCOMMODATE EQUIPMENT ACTUALLY APPROVED. ALL MODIFICATIONS SHALL BE SUBMITTED TO THE ENGINEER FOR APPROVAL. THE BASIC SEQUENCE AND METHOD OF CONTROL MUST BE MAINTAINED AS INDICATED ON THE DRAWINGS AND/OR SPECIFIED. 9. FOR ALL JUNCTION BOXES, PULL BOXES AND TERMINATION BOXES IN THE RACEWAY SYSTEM IN NEMA 12 AREAS, BOXES SHALL BE OF ALUMINUM. FOR NEMA 4X AREAS BOXES SHALL BE OF 316 STAINLESS STEEL, UNLESS NOTED OTHERWISE. 10. WHERE RACEWAYS ENTER JUNCTION BOXES OR CONTROL PANELS CONTAINING ELECTRICAL OR INSTRUMENTATION EQUIPMENT, ALL ENTRANCES SHALL BE SEALED WITH WATERTIGHT SEALANT. 11. ALL EQUIPMENT AND ELECTRICAL EQUIPMENT ENCLOSURE LOCATIONS, OR TERMINAL BOX LOCATIONS, ARE APPROXIMATE. THE EXACT LOCATIONS SHALL BE COORDINATED WITH AND APPROVED BY THE OWNER/ENGINEER, DURING CONSTRUCTION, AT NO ADDITIONAL COST TO THE OWNER. 12. ALL EQUIPMENT AND ELECTRICAL EQUIPMENT ENCLOSURES DIMENSIONS ARE APPROXIMATE. ALL EQUIPMENT AND ELECTRICAL EQUIPMENT ENCLOSURES OR TERMINAL BOX DIMENSIONS SHALL BE VERIFIED WITH THE EQUIPMENT SUPPLIER. ALLOW FOR LOCATION CHANGES AND INCLUDE IN THE CONTRACT PRICE. THE EXACT LOCATIONS OF ALL ELECTRICAL EQUIPMENT AND ROUTING OF ALL CABLES AND CONDUITS SHALL BE COORDINATED WITH AND APPROVED BY THE OWNER/ENGINEER DURING CONSTRUCTION. 13. CORING OF AN EXISTING STRUCTURE SHALL BE COORDINATED WITH AND APPROVED BY THE OWNER/ENGINEER. CORING THROUGH STRUCTURAL BEAMS IS STRICTLY PROHIBITED, WITHOUT PRIOR WRITTEN APPROVAL FROM THE OWNER/ENGINEER. 14. PROVIDE CONDUIT SEALS FOR CONDUIT PENETRATIONS. 15. THIS IS AN OPERATING FACILITY. THE CONTRACTOR SHALL COORDINATE ALL WORK WITH THE OWNER. NO SHUTDOWN OF ELECTRICAL OR CONTROL EQUIPMENT WILL NOT BE PERMITTED WITHOUT A SHUTDOWN REQUEST IN WRITING BEING SUBMITTED AND APPROVED PER SPECIFICATIONS. 16. THE CONTRACTOR SHALL BE RESPONSIBLE TO POTHOLE AS REQUIRED IN ORDER TO LOCATE AND DETERMINE DIRECTION OF ALL UNDERGROUND UTILITIES, PIPES, AND DUCTBANKS BEFORE DIGGING AT EVERY NEW POLE, GUY WIRE ANCHORS, DUCTBANK, AND MANHOLE LOCATIONS. CONTRACTOR SHALL COORDINATE THIS PROCEDURE WITH THE OWNER PRIOR TO COMMENCING WORK. CONTRACTOR IS RESPONSIBLE TO REPAIR WITHOUT COST TO THE OWNER ANY DAMAGES THAT OCCURRED TO UNDERGROUND UTILITIES DURING CONSTRUCTION. 17. ALL SLOTTED CHANNEL, SLOTTED CHANNEL SUPPORT MATERIAL, WASHERS, SCREWS, NUTS, CONDUIT CLAMPS, ALL THREAD SPRING NUTS AND MISC. MOUNTING HARDWARE SHALL BE 316 STAINLESS STEEL. 18. ALL CONDUITS AND WIRES SHOWN ON THE INTERFACE DIAGRAM SHALL BE INSTALLED BY THE CONTRACTOR. GROUPING OF CONDUIT AND WIRE MAY BE CHANGED, IF APPROVED BY THE ENGINEER AND OWNER. 19. ALL CONDULETS SHALL BE ALUMINUM FORM 7 AND SHALL HAVE 316 SS CLAMP COVERS WITH 316 SS CLAMPS AND SCREWS. SCREW DOWN COVERS ARE UNACCEPTABLE. 20. ALL BARE COPPER GROUNDING CONDUCTORS SHALL BE TINNED, ALL GROUND RODS SHALL BE COPPER CLAD STEEL, 3/4" BY 10' LONG. ALL EXPOSED COPPER GROUND CABLES SHALL BE GREEN INSULATED CONDUCTORS. PROVIDE XHHW-2 INSULATION. 21. WHERE NOTES ON THE DRAWING INDICATE THAT THE CONTRACTOR SHALL FIELD VERIFY, THE INTENT IS FOR THE CONTRACTOR TO INVESTIGATE TO THE EXTENT NECESSARY TO PROVIDE THE WORK AND MATERIALS PRIOR TO BIDDING AND INCLUDE ALL COSTS IN THE BID PRICE. THE CONTRACT PRICE SHALL NOT BE INCREASED WHEN THE CONTRACTOR HAS NOT INVESTIGATED PER THE NOTES DIRECTING THAT TO BE DONE. 22. CONDUITS SHALL NOT BE INSTALLED INTO THE TOP OF ANY NEMA ENCLOSURES RATED FOR DAMP, WET OR HOSE DOWN AREAS MOUNTED IN INDOOR PROCESS AREAS, OUTDOOR AREAS, OR ANY AREA NOT RATED TO BE DRY (ELECTRICAL ROOMS, CONTROL ROOMS, OR OFFICE AREAS). ANY ENCLOSURES THAT HAVE BEEN INSTALLED WITH TOP CONDUIT ENTRIES SHALL BE REMOVED AND REPLACED AT THE CONTRACTOR'S EXPENSE. 23. ALL PORTIONS OF CONDUITS INDICATED FOR REUSE SHALL BE CLEANED BY THE CONTRACTOR BEFORE REUSE. CLEANING PROCEDURES ARE AS FOLLOWS: A. PULL A WIRE BRUSH OF THE APPROPRIATE SIZE THROUGH THE CONDUIT. B. PULL A CONDUIT SWAB OF THE APPROPRIATE SIZE THROUGH THE CONDUIT. C. PULL A MANDREL OF THE APPROPRIATE SIZE THROUGH THE CONDUIT. D. THIS PROCEDURE MAY HAVE TO BE REPEATED SEVERAL TIMES UNTIL THE CONDUIT IS CLEAN. E. LEAVE A PULL STRING IN THE EMPTY CONDUIT AND PLUG BOTH ENDS OF THE CONDUIT AFTER CLEANING.PLUGS ARE TO BE REMOVED ONLY TO INSTALL NEW CONDUCTORS. THE CONTRACTOR IS RESPONSIBLE TO REPLACE ANY CONDUIT DAMAGED DURING THESE CLEANING PROCEDURES AT NO ADDITIONAL COST TO OWNER. 29. THE CONTRACTOR SHALL INSTALL ON ALL CONDUITS PROVIDED OR MODIFIED UNDER THE SCOPE OF THIS PROJECT WITH CONDUIT IDENTIFICATION PLATES. MODIFICATIONS TO CONDUITS INCLUDE CHANGES IN CONDUIT ROUTING AND/OR REPLACING EXISTING OR INSTALLING NEW CONDUCTORS. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER THE NAMING SYSTEM TO USE IN IDENTIFYING CONDUITS. WHEN MORE THAN TWO CONDUITS ENTER A JUNCTION BOX, PULL BOX, TERMINAL ENCLOSURE, ETC., ALL CONDUITS SHALL CONTAIN AN IDENTIFICATION PLATE WITH A UNIQUE IDENTIFICATION. 30. THE CONTRACTOR SHALL PROVIDE NAMEPLATES ON ALL EQUIPMENT WITH DESIGNATIONS AS REQUIRED BELOW, UNLESS NOTED OTHERWISE BY OWNER. A. SWITCHGEAR, SWITCHBOARDS, PANELBOARDS, SUBSTATIONS, ETC., SHALL HAVE NAMEPLATE DESIGNATIONS AS SHOWN ON THE DRAWINGS. FOR EXAMPLE; P1-35, LCS-2, SWBD-1, ETC. B. JUNCTION BOXES, PULL BOXES, TERMINAL ENCLOSURES, ETC. SHALL HAVE NAMEPLATE DESIGNATIONS THAT ARE UNIQUE AND SEQUENTIAL. FOR EXAMPLE; JB-1, PB-2, ETC. C. NAMEPLATES SHALL BE ENGRAVED, LAMINATED PLASTIC, NOT LESS THAN 1/16_IN THICK BY 3/4_IN HIGH BY 2_1/2_IN WIDE (MINIMUM) WITH 3/16_IN HIGH BLACK LETTERS ON A WHITE BACKGROUND. D. NAMEPLATES SHALL BE 316 SS SCREW MOUNTED TO ALL ENCLOSURES. SCREWS ON NEMA 4 ENCLOSURES SHALL BE SEALED BY UL LISTED METHOD. CONTRACTOR SHALL PROVIDE SUBMITTAL FOR METHOD OF SEALING SCREWS FOR APPROVAL. EPOXY ADHESIVE OR FOAM TAPE IS NOT ACCEPTABLE. THE CONTRACTOR SHALL SUBMIT AS-BUILT DRAWINGS INDICATING ALL EQUIPMENT IDENTIFIED ABOVE WITH THEIR APPROPRIATE NAMEPLATE DESIGNATION. 31. REFER TO THE CONDUIT TABLE BELOW FOR APPLICABLE TYPE OF CONDUIT PER LOCATION. © FR AN KL IN W AS TE W AT ER TR EA TM EN T PL AN T U V D IS IN FE C TI O N R EP LA C EM EN T PR EP AR ED F O R C IT Y O F FR AN KL IN 1. THE CONTRACTOR SHALL COORDINATE THE DEMOLITION OF THE ELECTRICAL CONDUIT, WIRE, EQUIPMENT AND DEVICES WITH THE GENERAL DEMOLITION AND SCHEDULE. THE DRAWINGS ARE INTENDED TO CONVEY THE GENERAL NATURE AND SCOPE OF THE DEMOLITION WORK. EVERY ITEM TO BE DEMOLISHED MAY NOT BE SHOWN. FIELD VERIFY WITH OWNER PRIOR TO BID, AND INCLUDE ALL DEMOLITION WORK IN THE CONTRACT PRICE. 2. PROVIDE TEMPORARY WIRE AND CONDUIT FOR THE EQUIPMENT WHICH MAY BE AFFECTED BY THE DEMOLITION BUT TO REMAIN IN SERVICE. WHERE NECESSARY TO MAINTAIN PLANT OPERATION, THE CONTRACTOR SHALL PROVIDE A GENERATOR OR GENERATORS TO KEEP THE PROCESS IN OPERATION WHILE SERVICE SWITCHOVER IS BEING PERFORMED. 3. RELOCATE AND RECONNECT POWER AND CONTROL RACEWAYS AND CONDUCTORS TO EQUIPMENT AFFECTED BY DEMOLITION WORK. 4. ALL CONDUCTORS BEING DEMOLISHED SHALL BE DISCONNECTED AND REMOVED FROM THE LOAD TO THE SOURCE. SURFACE MOUNTED CONDUITS AND MOUNTING HARDWARE SHALL BE REMOVED. UNDERGROUND CONDUITS WHICH ARE NOT BEING REMOVED OR NOT BEING REUSED SHALL BE CAPPED AND TAGGED AS SPARE, WITH INFORMATION CLEARLY INDICATING THE LOCATION OF THE OTHER END, UNLESS NOTED OTHERWISE. 5. ALL SURFACES WHERE DEMOLISHED EQUIPMENT OR CONDUIT IS REMOVED SHALL BE CLEANED, PATCHED AND PAINTED TO MATCH THE SURROUNDING SURFACE. 6. THE CONTRACTOR SHALL BE RESPONSIBLE TO CHECK THE FUNCTION OF EACH CONDUCTOR BEFORE REMOVING OR DISCONNECTING. 7. THE CONTRACTOR SHALL FIELD VERIFY PRIOR TO BID TO DETERMINE IF CONDUCTORS WHICH ARE TO STAY IN SERVICE (NOT BEING DEMOLISHED) ARE INSTALLED IN A COMMON CONDUIT WITH CONDUCTORS WHICH ARE BEING DEMOLISHED, THE CONTRACTOR SHALL REMOVE ALL CONDUCTORS FROM THE CONDUIT, PROVIDE NEW CONDUCTORS WHICH ARE REPLACEMENTS FOR THE CONDUCTORS THAT ARE TO REMAIN IN SERVICE AND RE-INSTALL THE NEW CONDUCTORS. AFTER THE CONDUCTORS ARE PULLED, MEGGER OR HIPOT TEST EACH CONDUCTOR. CONNECT BOTH ENDS OF THE NEW CONDUCTORS AND TEST THE SYSTEM FOR PROPER FUNCTION. DO NOT RE-PULL USED CONDUCTORS. 8. WHERE EQUIPMENT IS BEING RE-FED FROM A NEW SOURCE, EXISTING CONDUIT MAY BE REUSED ONLY IF THE CONDUIT AND FITTINGS ARE OF THE TYPE SPECIFIED FOR NEW WORK ON THIS CONTRACT. IF NOT, THE CONDUIT AND CONDUCTORS SHALL BE REPLACED WITH NEW MATERIAL MEETING THE SPECIFICATIONS, AT NO ADDITIONAL COST TO THE OWNER. 9. THE OWNER HAS THE RIGHT OF FIRST REFUSAL TO THE EQUIPMENT BEING REMOVED. THE CONTRACTOR SHALL DELIVER THE EQUIPMENT WHICH THE OWNER WISHES TO KEEP TO A LOCATION DESIGNATED BY THE OWNER. SEE SECTION 26 05 33. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS AND PERMITS REQUIRED TO DISPOSE OFF SITE ALL DEMOLISHED EQUIPMENT REFUSED BY OWNER. 10. THE CONTRACTOR SHALL NOT MAKE ANY MODIFICATIONS UNTIL THE FOLLOWING HAS BEEN DONE: A. THE OWNER/CONTRACTOR SHALL WITNESS AND RECORD THE CONDITION OF THE EXISTING EQUIPMENT, THE CONTRACTOR SHALL NOTE DOWN ANY DEFECTS OR DEFICIENCIES. B. THE OWNER SHALL OPERATE THE EQUIPMENT TO DEMONSTRATE THE CURRENT CONDITIONS. THE CONTRACTOR SHALL NOTE DOWN ANY DEFECTS OR DEFICIENCIES. C. A WRITTEN AND PHOTOGRAPHIC RECORD OF THE OPERATION AND EXISTING CONDITION SHALL BE KEPT IN A THREE RING BINDER AT THE OWNER/CONTRACTOR TRAILER, IN FORM OF PICTURES AND INFORMATION ON A FORM. D. A FORM SHALL BE GENERATED BY THE CONTRACTOR TO RECORD THE OBSERVATIONS. BOTH PARTIES SHALL SIGN ON THE FORM. E. AFTER THE CHANGES ARE MADE, THE EQUIPMENT SHALL BE INSPECTED AND RE-TESTED TO DEMONSTRATE THAT IT FUNCTIONS CORRECTLY. F. NO PORTION OF EXISTING CONDUCTORS SHALL BE SPLICED TO NEW CONDUCTORS FOR RE-USE WITHOUT SPECIFIC APPROVAL FROM THE OWNER/ENGINEER ON A CASE-BY-CASE BASIS. 11. THE CONTRACTOR SHALL BE RESPONSIBLE TO FURNISH AND INSTALL MATERIAL OR EQUIPMENT DAMAGED DURING THE COURSE OF HIS WORK. CONDUIT TYPE LOCATION 1. LIQUID TIGHT FLEXIBLE ALUMINUM CONDUIT 2. RIGID ALUMINUM CONDUIT 3. PVC COATED RIGID ALUMINUM CONDUIT RACEWAY CONNECTION TO VIBRATING EQUIPMENT ONLY, IN ALL AREAS. ALL ABOVE GRADE AREAS, EXCEPT FOR CONCRETE EMBEDDED AND THOSE AREAS DESCRIBED IN LOCATION 2. ALL ELBOWS UNDERGROUND ENCASED IN RED DYE REINFORCED CONCRETE AND USED AS SHOWN ON VARIOUS ELECTRICAL STANDARD DETAILS. 4. PVC SCHEDULE 40 CONDUIT UNDERGROUND ENCASED IN RED IN RED DYE REINFORCED CONCRETE. © NORTH FR AN KL IN W AS TE W AT ER TR EA TM EN T PL AN T U V D IS IN FE C TI O N R EP LA C EM EN T PR EP AR ED F O R C IT Y O F FR AN KL IN © FR AN KL IN W AS TE W AT ER TR EA TM EN T PL AN T U V D IS IN FE C TI O N R EP LA C EM EN T PR EP AR ED F O R C IT Y O F FR AN KL IN NO RT H © FR AN KL IN W AS TE W AT ER TR EA TM EN T PL AN T U V D IS IN FE C TI O N R EP LA C EM EN T PR EP AR ED F O R C IT Y O F FR AN KL IN UV DISINFECTION REMOVAL 3UV DISINFECTION REMOVAL 2 UV DISINFECTION REMOVAL 1 NO RT H © FR AN KL IN W AS TE W AT ER TR EA TM EN T PL AN T U V D IS IN FE C TI O N R EP LA C EM EN T PR EP AR ED F O R C IT Y O F FR AN KL IN NO RT H © FR AN KL IN W AS TE W AT ER TR EA TM EN T PL AN T U V D IS IN FE C TI O N R EP LA C EM EN T PR EP AR ED F O R C IT Y O F FR AN KL IN © FR AN KL IN W AS TE W AT ER TR EA TM EN T PL AN T U V D IS IN FE C TI O N R EP LA C EM EN T PR EP AR ED F O R C IT Y O F FR AN KL IN © FR AN KL IN W AS TE W AT ER TR EA TM EN T PL AN T U V D IS IN FE C TI O N R EP LA C EM EN T PR EP AR ED F O R C IT Y O F FR AN KL IN © FR AN KL IN W AS TE W AT ER TR EA TM EN T PL AN T U V D IS IN FE C TI O N R EP LA C EM EN T PR EP AR ED F O R C IT Y O F FR AN KL IN © FR AN KL IN W AS TE W AT ER TR EA TM EN T PL AN T U V D IS IN FE C TI O N R EP LA C EM EN T PR EP AR ED F O R C IT Y O F FR AN KL IN © NORTH FR AN KL IN W AS TE W AT ER TR EA TM EN T PL AN T U V D IS IN FE C TI O N R EP LA C EM EN T PR EP AR ED F O R C IT Y O F FR AN KL IN © FR AN KL IN W AS TE W AT ER TR EA TM EN T PL AN T U V D IS IN FE C TI O N R EP LA C EM EN T PR EP AR ED F O R C IT Y O F FR AN KL IN © FIELD JUNCTIONVENDOR CONTROL PANEL TAG NAME TBD TAG NAME TBD TAG NAME TBD TAG NAME TBD SCADA SYSTEM FIBER OPTIC CABLE ETHERNET CABLE (CAT6) LEGEND FIBER OPTIC TRANSLATOR FIBER OPTIC TRANSLATOR SCADA SERVERVENDOR PLC THE ***FUTURE*** SCADA SYSTEM WILL COMMUNICATE WITH THE FIELD (VENDOR, ETC.) PLCs VIA MODBUS TCP. THIS STANDARD COMMUNICATION PROTOCOL WILL ALLOW THE SCADA SYSTEM TO READ AND WRITE TO THE PLCs PER THE OPERATIONAL REQUIREMENTS OF EACH SYSTEM. 62.5 MICRON MULTI-MODE FIBER (2 PAIR MINIMUM) FR AN KL IN W AS TE W AT ER TR EA TM EN T PL AN T U V D IS IN FE C TI O N R EP LA C EM EN T PR EP AR ED F O R C IT Y O F FR AN KL IN © FR AN KL IN W AS TE W AT ER TR EA TM EN T PL AN T U V D IS IN FE C TI O N R EP LA C EM EN T PR EP AR ED F O R C IT Y O F FR AN KL IN 5/ 6 3/ 4 10 8T X 7/ 8 1/ 2 LNK ACT LNK ACT LNK ACT LNK ACT LNK ACT SPD SPD SPD SPD SPD © FR AN KL IN W AS TE W AT ER TR EA TM EN T PL AN T U V D IS IN FE C TI O N R EP LA C EM EN T PR EP AR ED F O R C IT Y O F FR AN KL IN This product is covered by one or more U.S. and international patents and/or pending patents. © FR AN KL IN W AS TE W AT ER TR EA TM EN T PL AN T U V D IS IN FE C TI O N R EP LA C EM EN T PR EP AR ED F O R C IT Y O F FR AN KL IN This product is covered by one or more U.S. and international patents and/or pending patents. © FR AN KL IN W AS TE W AT ER TR EA TM EN T PL AN T U V D IS IN FE C TI O N R EP LA C EM EN T PR EP AR ED F O R C IT Y O F FR AN KL IN

207 W. 2nd Ave.,Franklin, VA 23851Location

Address: 207 W. 2nd Ave.,Franklin, VA 23851

Country : United StatesState : Virginia

You may also like

Five Year Strategic Consolidated Plan, First Year Action Plan and Analysis

Due: 30 Apr, 2024 (Tomorrow)Agency: County of Rockland

Wastewater Treatment Plant Maintenance Services

Due: 28 Sep, 2028 (in about 4 years)Agency: THE AUTOMATION GROUP INC

Mill Creek Wastewater Treatment Plant Facility Plan

Due: 01 May, 2024 (in 2 days)Agency: City of Cincinnati

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.