Project Title Estancia High School Student Gathering and Paving Invitation # 127-24 Bid Posting Date 03/13/2024 4:02 PM (PDT) Project Stage Bidding Bid Due Date 04/25/2024 2:00 PM (PDT) Response Format Electronic Project Type RFQual (Request for Qualification) Response Types Response File Type of Award Lump Sum Categories 236220 - Commercial and Institutional Building Construction License Requirements B Department Purchasing Address 2985 Bear St. Bldg A Costa Mesa, California 92626 County Orange Bid Valid 5/2024 Liquidated Damages Estimated Bid Value $4,000,000.00 Start/Delivery Date 5/2024 Project Duration 54 Calendar Days Bid Bond Bid Bond 0.00% Payment Bond 100.00% Performance Bond 100.00% Pre-Bid Meeting Information Pre-Bid Meeting Yes - Mandatory Pre-Bid Meeting Date 03/26/2024 10:06 AM (PDT) Pre-Bid Meeting Location Estancia High School, 2323 Placentia Ave., Costa Mesa, California, 92627. Meet at flagpole. Contractors will need to sign-in at front office before the start of the
Job Walk. Please bring photo ID. Online Q&A Online Q&A Yes Q&A Deadline 04/10/2024 2:00 PM (PDT) Contact Information Contact Info Jonathan Geiszler 714-424-5063 jgeiszler@nmusd.us Bids to Jonathan Geiszler Owner's Agent Safework CM Description Scope of Services The RFQ includes two construction projects that will be managed concurrently. The Estancia HS Student Gathering project includes improvements to the site’s exterior pool area, including a new sunshade structure, new hardscape, landscape, electrical infrastructure, and irrigation. The Estancia HS Paving Project is an required to furnish a Labor and Material Payment Bond in an amount equal to 100 percent of the Contract Price, as well as a Faithful Performance Bond in an amount equal to 100 percent of the Contract Price. Said Bonds shall be from an admitted California Surety satisfactory to the DISTRICT and listed in the Federal Register, issued by the Department of Treasury and licensed in California. Said Bonds shall remain in full force and effect through all guarantee and/or warranty periods stated in the Project Documents. Use of the bond forms, without variations, as set forth in Section 11 is mandatory. Other Details Notes Special Notices Local Programs & Policies Place eBid