Project Title Transitional Kindergarten Classroom Expansion Invitation # 133-24 Bid Posting Date 03/27/2024 2:48 PM (PDT) Project Stage Bidding Bid Due Date 04/25/2024 2:00 PM (PDT) Response Format Paper Project Type Bid Response Types Line Items Type of Award Lump Sum Categories 238110 - Poured Concrete Foundation and Structure Contractors 238210 - Electrical Contractors and Other Wiring Installation Contractors 238220 - Plumbing, Heating, and Air-Conditioning Contractors 238290 - Other Building Equipment Contractors 238390 - Other Building Finishing Contractors 238910 - Site Preparation Contractors 238990 - All Other Specialty Trade Contractors License Requirements A or B Department Purchasing Address 2985 Bear St. Bldg A Costa Mesa, California 92626 County Orange Bid Valid 5/2024 Liquidated Damages $2,500.00/Day Estimated Bid Value $9,200,000.00 Start/Delivery Date 5/2024 Project Duration 95 Calendar Days Bid Bond Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00%
Pre-Bid Meeting Information Pre-Bid Meeting Yes - Mandatory Pre-Bid Meeting Date 04/09/2024 10:00 AM (PDT) Pre-Bid Meeting Location California Elementary School 3232 California Street, Costa Mesa, CA 92626, Contractors will be taken to all additional project sites following this initial meeting. Online Q&A Online Q&A Yes Q&A Deadline 04/16/2024 4:00 PM (PDT) Contact Information Contact Info Jonathan Geiszler 714-424-5063 jgeiszler@nmusd.us Bids to Jonathan Geiszler Owner's Agent SafeWork CM Description Scope of Services Newport-Mesa School District is adding portable classrooms, portable restrooms and modifying the TK/Kindergarten outdoor play area at five elementary school campuses: California, Eastbluff, Killybrooke, Victoria and Newport Heights. The general scope at each site shall include the purchase and installation of playground equipment and two shade structures at each site. The new and refurbished portable buildings will be owner purchased and installed on raised foundations with ramps, contractor will be responsible for preparing site for building placement. This scope will require the contractor to extend existing utilities, including water, sewer, electrical / low voltage, and fire alarm and making final utility connections of the portable buildings shown at each campus. The overall project will also include DSA required accessibility and fire life safety upgrades to the five elementary school campuses as shown in the drawings. Other Details Notes Special Notices Local Programs & Policies
238110 - Poured Concrete Foundation and Structure Contractors 238210 - Electrical Contractors and Other Wiring Installation Contractors 238220 - Plumbing, Heating, and Air-Conditioning Contractors 238290 - Other Building Equipment Contractors 238390 - Other Building Finishing Contractors 238910 - Site Preparation Contractors 238990 - All Other Specialty Trade Contractors