Town of Silverthorne Silverthorne, Colorado Hummingbird Circle Water and Sewer Replacement General Notice The Town of Silverthorne is requesting Bids for the construction of the following Project: Hummingbird Circle Water and Sewer Replacement Bids for the construction of the Project will be received by Jeremy Pirkle, Water & Sewer Manager, located at 26250 Blue River Parkway Silverthorne, Colorado, until Friday, April 26, 2024, at 10AM local time. At that time the Bids received will be publicly opened and read. The Project includes the following Work: The project consists of replacing approximately 800 L.F. of 4” CIP water main to 8” C900 water main and approximately 800 L.F. of 8” VCP sanitary sewer to 8” SDR 26 PVC sanitary sewer main. Construction includes valves, manholes, air relief vault, water and sewer service connections, curb valves, cleanouts, asphalt roadway; concrete curbs, gutters, pans and sidewalks; storm sewers, inlets and other associated items. Prospective Bidders may request the Bidding Documents and send questions to Jeremy Pirkle, Water & Sewer Manager by email:
jpirkle@silverthorne.org. Questions must be received by Tuesday, April 23, 2024 at 1PM. Answers will be provided by 5PM on Wednesday, April 24, 2024. Pre-bid Conference A mandatory pre-bid conference for the Project will be held on April 11, 2024 at 10AM at 26250 Blue River Parkway Silverthorne CO, 80498 . Attendance at the pre-bid conference is required and will be followed by a site visit. Bids will not be accepted from bidders that do not attend the mandatory pre-bid conference. Instructions to Bidders. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. This Advertisement is issued by: Owner: Town of Silverthorne By: Jeremy Pirkle Title: Water & Sewer Manager Date: April 1,