Project dates: Date Due: Feb 22, 2022 at 9:00 AM PST Job Walk: Jan 19, 2022 at 10:30 AM PST RFIs Due: Feb 4, 2022 at 9:00 AM PST Expected Start: Mar 4, 2022 Expected Finish: Jul 15, 2022 Date Invited: Jan 10, 2022 at 12:51 PM PST General info: Project Name: Brooks Hall Matsumoto Wing HVAC Renovation Location: NCSU Brooks Hall #011 – Matsumoto Wing, 50 Pullen Rd, NC 27607, United States of America Project Size: 52,257 sq. ft. Project Information: This project is designed and specified to add a rooftop dedicated outdoor air handler (DOAH) on the roof of Brooks Hall Matsumoto Wing located at NC State University’s main campus. The DOAH will provide ventilation air and relief air to the second and third floors of the Matsumoto Wing that currently do not have mechanical means of outdoor air ventilation. Equipment is sized to provide future capacity for first floor ventilation for use in future renovation projects. The DOAH includes a total enthalpy energy recovery wheel in addition to chilled water cooling coil and a steam reheat coil to deliver dehumidified neutral temperature air into the facility. Related organizations: Architect: McKim & Creed Client Files 20-22446-01A NCSU ADDENDUM 1 20-22446-01A – NCSU ADDENDUM 2 20-22446-01A – NCSU ADDENDUM 3 + Google Calendar+ Add to iCalendar Details Date: February 22 Event Category: Bid