Water Controllers for USACE Locks and Dams

expired opportunity(Expired)
From: Federal Government(Federal)
W912ES23Q0099

Basic Details

started - 21 Nov, 2023 (5 months ago)

Start Date

21 Nov, 2023 (5 months ago)
due - 15 Dec, 2023 (4 months ago)

Due Date

15 Dec, 2023 (4 months ago)
Bid Notification

Type

Bid Notification
W912ES23Q0099

Identifier

W912ES23Q0099
DEPT OF DEFENSE

Customer / Agency

DEPT OF DEFENSE (710429)DEPT OF THE ARMY (133321)USACE (38203)MVD (4909)W07V ENDIST ST PAUL (1154)

Attachments (5)

unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

The Contractor shall provide five (5) custom programed Stager Controllers for the well-water filtration systems that are installed at the following Locks and Dams: LD2 (Hastings, MN), LD5 (Minnesota City, MN), LD5A (Fountain City, WI), LD7 (La Crescent, MN), LD9 (Eastman, WI). These systems were originally designed, built and installed by Robert Hill Company in St Louis Park, MN.The resulting contract is for the replacement of the controller units only. The U.S. Army Corps of Engineers (USACE) has no preference for brand, make, or model of the controllers provided they comply with the performance requirements listed below and integrate into the currently working system. Additional parts may be required to insure the system and new components are compatible. No adjustment in contract price will be made for failure to ensure component compatibility. The systems at all five sites incorporate four tanks on a balanced manifold. Iron in the water is oxidized then filtered through
backwashing filters. Oxidation is accomplished with dissolved potassium permanganate injected into the water stream via a chemical feed pump. The chemical feed pump is wired to operate with the well pump. The filters are four 30” diameter steel tanks. The filter beds are composed of manganese greensand, a manganese coated glauconite capped with anthracite filter coal. The four in-line tanks filter, until a set volume is treated, or a set period of time has passed. The filters are then taken off-line and back-washed individually. Following backwash, the filters are then returned to service. Backwash is provided by the remaining tanks on-line, so there is no contamination in the lower distributor or lower layers of the filter bed. Stager Controller Complete Stager ModuleUL (or nationally accredited test lab) listed components. 12-month parts and labor warranty.Components and spare parts must be available within 10 days.Electronic copies of schematics, program data and ladder diagrams must be provided prior to award for evaulation. Programs start, stop and cycle time of back flush cycle for well water filtration system.Capable of controlling pump and up to four greensand tanks.Measures and displays flow which can be used to determine that system is working effectively.Water flow ranges between 0-100 GPM (gallons per minute). Typical service flow rate is 75 GPM (@ 3.5 fps).Backwash Cycle: o First Stage: 8 GPM/Sq Ft o Main Wash: 15 GPM/Sq. Ft o Maximum Backwash Rate: 18 GPM/Sq. Ft o Backwash Flow Rate: 75 GPM o First Stage Flow Rate: 40 GPM o First Stage Duration: 2 minutes o Total Backwash Duration: 10 minutesQuantity of Five (5) units at locations listed. Contractor Requirements  Must have minimum of five years documented experience in well water filtration systems and satisfactory performance ratings in Federal rating systems.Installation and Training Includes turnkey installation, integration, programming and trainingIncludes Operator and Maintenance (O&M) Manual complete with schematics, recommended spare parts, and part numbers.Electronic copies of schematics, program data and ladder diagrams must be provided. Contractor Site Visits Interested contractors are encouraged to see the application prior to bidding on these controllers.Minimum 48 hours’ notice is required and is limited to maximum of two hours per site. Availability for site visits is during work hours of Monday through Friday 08:00 – 15:00.

KO CONTRACTING DIVISION 332 MINNESOTA STREET SUITE 1500  SAINT PAUL , MN 55101-1323  USALocation

Place Of Performance : N/A

Country : United StatesState : MinnesotaCity : Dellwood

Office Address : KO CONTRACTING DIVISION 332 MINNESOTA STREET SUITE 1500 SAINT PAUL , MN 55101-1323 USA

Country : United StatesState : MinnesotaCity : Saint Paul

You may also like

Stormwater Pump Stations and Control Structures Improvements

Due: 08 May, 2024 (in 5 days)Agency: Miami-Dade County

Classification

naicsCode 237110Water and Sewer Line and Related Structures Construction
pscCode J046Maintenance, Repair and Rebuilding of Equipment: Water Purification and Sewage Treatment Equipment
naicsCode 238220Plumbing, Heating, and Air-Conditioning Contractors