2024 Chapel Avenue Culvert Replacement

From: Cherry Hill(Town)

Basic Details

started - 12 Apr, 2024 (23 days ago)

Start Date

12 Apr, 2024 (23 days ago)
due - 14 May, 2024 (in 8 days)

Due Date

14 May, 2024 (in 8 days)
Bid Notification

Type

Bid Notification

Identifier

N/A
Cherry Hill Township

Customer / Agency

Cherry Hill Township
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

ADDENDUM #2 HAS BEEN ISSUED AND MAY BE DOWNLOADED BELOW. BID OPENING DATE HAS BEEN CHANGED TO: MAY 14, 2024, 11:00AM. ALL ADDENDA AND THE ADDENDUM ACKNOWLEDGEMENT FORM (P-3) MUST BE SIGNED AND ENCLOSED WITH SUBMISSION. FAILURE TO SIGN AND INCLUDE THESE DOCUMENTS WILL RESULT IN REJECTION OF YOUR BID.********************************************************************************************************ADDENDUM #1 HAS BEEN ISSUED AND MAY BE DOWNLOADED BELOW. ADDENDUM AND ADDENDUM ACKNOWLEDGEMENT FORM (P-3) MUST BE SIGNED AND ENCLOSED WITH SUBMISSIONS, FAILURE TO SIGN AND INCLUDE BOTH DOCUMENTS WILL RESULT IN REJECTION OF YOUR BID.************************************************************* The Source of Funding for this Project will include American Rescue Plan Act of 2021 (ARPA) - State and Local Fiscal Recovery Funds (SLFRF).Summary of Project Scope The Township of Cherry Hill is proposing construction improvements along Chapel Avenue between Hastings Road and Douglas Drive. The
improvements generally consist of replacement of an existing deteriorated arched corrugated metal culvert which runs in the southerly direction under Chapel Avenue, providing scour and erosion protection improvements adjacent to the culvert, updating stormwater conveyance infrastructure between Hastings Road and Douglas Drive and improving the roadway pavement and grading within the project limits on Chapel Avenue. The condition of the existing roadway and culvert have been monitored over time and the frequency of sinkhole development has increased, prompting continual repairs of the roadway over the culvert. The presence of sinkholes and differential settlement of the subsoil continually impact the adjacent drainage inlets, curb, sidewalk, and roadway which is in severely deteriorating condition. The project consists of the following improvements; removal of the existing culvert and replacing with sixty (60) linear feet of double-cell, 7 foot span and 4 foot rise four-sided box culvert, construction of headwalls, installation of buried steel piling cut-off walls (5 feet deep), construction of reno-mattress scour protection within the entrance and exit channel of the culvert, construction of stone-filled gabion basket slope stabilization along the banks of the channel, removal, replacement and/or relocation of fencing and landscaping within the disturbed areas near the culvert, removal, replacement, addition and/or reconstruction of inlets on the roadway, removal and replacement of approximately 150 linear feet of reinforced concrete pipe, installation of a new 10 foot by 10 foot drainage structure with new connections between the stormwater conveyance and headwall, reconstruction of the roadway within proximity of the culvert replacement (~450 SY) and a 2” mill and overlay within the remaining area of Chapel Avenue between Hastings Road and Douglas Drive (~750 SY), replacement of curb and sidewalk, as well as other related miscellaneous improvements . PLEASE DOWNLOAD SPECIFICATIONS BELOW. Instructions to download: On the bottom left side of page, click "VIEW DOCUMENTS". Upon completion and submission of the registration information, you will be returned to this page. The links for downloading each document will replace the "View Documents" link under the "Related Documents" section (bottom left of page).

Cherry Hill, NJ 08002, USALocation

Address: Cherry Hill, NJ 08002, USA

Country : United StatesState : New Jersey

You may also like

RFQ #02-24-16- Trench Rescue Certification Training

Due: 17 May, 2024 (in 12 days)Agency: City of Keene

Woodman Avenue SE Road Rehabilitation

Due: 09 May, 2024 (in 3 days)Agency: City of Medicine Hat

2024 Chapel Avenue Culvert Replacement

Due: 14 May, 2024 (in 8 days)Agency: Cherry Hill

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.

Classification

Construction