The Lindsey Academy HVAC Replacement Project & The Barton Elementary School HVAC Replacement Project

expired opportunity(Expired)
From: Tilden-Coil Constructors(Co-op)
The Lindsey Academy HVAC Replacement Project & The Barton Elementary School HVAC Replacement Project

Basic Details

started - 18 Apr, 2018 (about 6 years ago)

Start Date

18 Apr, 2018 (about 6 years ago)
due - 02 May, 2018 (about 6 years ago)

Due Date

02 May, 2018 (about 6 years ago)
Bid Notification

Type

Bid Notification
The Lindsey Academy HVAC Replacement Project & The Barton Elementary School HVAC Replacement Project

Identifier

The Lindsey Academy HVAC Replacement Project & The Barton Elementary School HVAC Replacement Project
Long Beach Unified School District

Customer / Agency

Long Beach Unified School District
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Project: LBUSD -The Lindsey Academy HVAC Replacement Project & The Barton Elementary School HVAC Replacement Project Project Manager Due Date Project Status Amanda Apat 05-02-2018 02:00 PM (PT) Past Bid Due Date Phone Fax (951) 684-5901 (951) 321-6037 Architect Owner (GBA) Ghataode Bannon Architects Long Beach Unified School District Project Location Lindsey Academy - 5075 Daisy Ave. - Long Beach, CA View location in Google Map. Google Map D Description REQUEST FOR BIDS TO PERFORM SUBCONTRACTOR CONSTRUCTION SERVICES Tilden-Coil Constructors is requesting subcontractor proposals with a SEPARATE price for each project listed below: The Lindsey Academy HVAC Upgrade Project The Barton Elementary School HVAC Upgrade Project These are Lease-Leaseback projects for Long Beach USD consisting of the installation of an HVAC System in classrooms, offices and support spaces including, but not limited to: upgrades of utility service, accessibility, technology, interior/exterior finishes,
lighting and electrical; and tactile signage per the bid specifications. Tilden-Coil Constructors is the awarded Lease-Leaseback General Contractor for these projects. Subcontractor / Trade Descriptions: 01- Not Used 14 – Acoustical Ceiling 02 – Demolition & Abatement 15 – Flooring 03 – Concrete 16 – Painting 04 – Miscellaneous Steel 17 – Markerboard & Tackboards 05 – Casework 18 – Signage 06 – Rough Carpentry 19 - Toilet Compartments & Accessories 07 – Drywall & Plaster 20 – Window Treatment 08 – Building Insulation 21 – Plumbing 09 – Roofing 22 – HVAC 10 – Sheet Metal 23 – Electrical & Low Voltage 11 – Doors, Frames, Hardware 24 – Chainlink Fencing & Gates 12 - Aluminum & Glazing 25 – Fire Extinguishers 13 – Tile Bid Submissions: Bids must be submitted on or before 2:00 pm on May 2, 2018 Please submit your proposal to Tilden-Coil Constructors using the SmartBid submit proposal feature through your secure project link; or, by emailing them to precon@tilden-coil.com. To become a plan holder and obtain a secure project link please contact Amanda Apat aapat@tilden-coil.com or 951-684-5901. Pre-Bid Conference: For the Lindsey Academy HVAC Replacement there will be two, non-mandatory pre-bid conferences held at Lindsey Academy, 5075 Daisy Avenue, Long Beach, CA 90805. The following trades are strongly encouraged to attend: demo, framing, drywall, plumbing and HVAC Conference #1 - 8:00 am on April 16, 2018 Conference #2 – 8:00 am on April 18, 2018 For the Barton Elementary School HVAC Upgrade Project there will be two, non-mandatory pre-bid conferences held at Barton Elementary School, 1100 E. Del Amo Blvd., Long Beach, CA 90807. The following trades are strongly encouraged to attend: demo, framing, drywall, plumbing and HVAC Conference #1 - 8:00 am on April 17, 2018 Conference #2 – 8:00 am on April 19, 2018 Requests for Information (RFI’s): Requests for information for both projects are due by 2:00 pm April 23, 2018. Bidders are required to indicate the project name in the title of your request submission. Submit all requests for information to Robert Gonzalez rgonzalez@tilden-coil.com and copy David Joseph djoseph@tilden-coil.com. Prequalification: Per PCC 20111.6, if not already prequalified, all MEP subcontractors are required to be prequalified with Long Beach USD and must submit a prequalification questionnaire with QualityBidders.com ten (10) days prior to the bid opening. Bids will not be accepted from a Subcontractor holding an MEP, Solar or Sheet Metal License: C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43 or C-46 that has not been prequalified where prequalification is required. The Current list of LBUSD Prequalified contractors can be obtained by visiting: http://lbschoolbonds.net/contractor-prequalification.cfm Owner Controlled Insurance Program (OCIP): This project is subject to an Owner Controlled Insurance Program (OCIP). Subcontractors of all tiers must have an EMR of 1.24 or less at the time of enrollment. Skilled and Trained Workforce: Respondents are advised that this project must conform to the revisions of the California Education Code Section 17407.5, mandated by AB 418. As such, all subcontractors, are required to provide a "Skilled and Trained Workforce". DIR Registration: This Project is a public works project as defined in Labor Code section 1720. All subcontractors (of any tier) bidding on this Project or performing any portion of the Work must comply with the Labor Code sections 1725.5 and 1771.1 and must be properly and currently registered with DIR and qualified to perform public works pursuant to Labor Code section 1725.5 throughout the duration of the Project. For more information and up to date requirements, contractors are recommended to periodically review the DIR’s website at www.dir.ca.gov. All subcontractors (of any tier) shall be responsible for ensuring compliance with Labor Code section 1725.5 as well as any requirements implemented by DIR applicable to its services or its subcontractors throughout the term of the Agreement and in no event shall contractor be granted increased payment or any time extensions to complete the Project as a result of contractor’s efforts to maintain compliance with the Labor Code or any requirements implemented by the DIR. Failure to comply with these requirements shall be deemed a material breach of Agreement and grounds for termination for cause. All subcontractors (of any tier) shall furnish certified payroll records as required pursuant Labor Code section 1776 directly to the Labor Commissioner in accordance with Labor Code section 1771.4 on at least on a monthly basis (or more frequently if required by Tilden-Coil Constructors or the Labor Commissioner) and in a format prescribed by the Labor Commissioner. Tilden-Coil Constructors reserves the right to withhold contract payments if Tilden-Coil Constructors is notified, or determines as the result of its own investigation, that a Subcontractor is in violation of any of the requirements set forth in Labor Code section 1720 et seq. at no penalty or cost to Tilden-Coil Constructors or the District. Monitoring and enforcement of the prevailing wage laws and related requirements will be performed by the Labor Commissioner/ Department of Labor Standards Enforcement (DLSE). Plan Room / Project Files Select All | Clear Selected | Collapse All | Expand All | o Folder: [root] (Click to Expand: 16 sub folders and 78 files) Zip and Download this Folder o Folder: 00 - General Docs & Notice to Bidders-Instructions to Bidders (Click to Expand: 0 sub folders and 2 files) Zip and Download this Sub Folder Navigating_SmartBid_-_Bidder_User_Reference.pdf (344 KB) Pages: 3 Version: 1 Size: 9''x11'' Uploaded: 4/9/2018 Notice_to_Bidders_Instructions_to_Bidders_-_REVISED_04.17.18.pdf (221 KB) Pages: 5 Version: 1 Size: 9''x11'' Uploaded: 4/18/2018 o Folder: 00 - LBUSD LLB Agreement s & Owner Requirements - Lindsey & Barton (Click to Expand: 0 sub folders and 2 files) Zip and Download this Sub Folder LBUSD_BartonHVAC_FullyExecuted_for_subcontractors1.pdf (47221 KB) Pages: 238 Version: 1 Size: 9''x11'' Uploaded: 4/18/2018 LBUSD_LindseyAcademyHVAC_FullyExecuted_for_subcontractors.pdf (46800 KB) Pages: 234 Version: 1 Size: 9''x11'' Uploaded: 4/18/2018 o Folder: 00 - LBUSD OCIP Requirements (Click to Expand: 0 sub folders and 2 files) Zip and Download this Sub Folder LBUSD_OCIP_Insurance_Manual_rev_9-7-2017.pdf (1618 KB) Pages: 51 Version: 1 Size: 9''x11'' Uploaded: 4/9/2018 LBUSD_Safety_Standards_9-7-17.pdf (1521 KB) Pages: 105 Version: 1 Size: 9''x11'' Uploaded: 4/9/2018 o Folder: 00 - TCC Bid Clarification 01 - Issued 04.25.2018 (Click to Expand: 0 sub folders and 8 files) Zip and Download this Sub Folder 00._TCC_Bid_Clarification_01_Narrative.pdf (110 KB) Pages: 3 Version: 1 Size: 9''x11'' Uploaded: 4/25/2018 01._Bid_Form_-_Lindsey___Barton.pdf (135 KB) Pages: 2 Version: 1 Size: 9''x11'' Uploaded: 4/25/2018 Barton_Elem_Schedule.pdf (465 KB) s Pages: 14 Version: 1 Size: 17''x11'' Uploaded: 4/25/2018 Barton_Logistics_Plan.pdf (1466 KB) s Pages: 1 Version: 1 Size: 42''x30'' Uploaded: 4/25/2018 Lindsey_Academy_HVAC_Upgrade_-_Final_Hazmat_Report.pdf (54110 KB) s Pages: 737 Version: 1 Uploaded: 4/25/2018 Lindsey_Academy_HVAC_Upgrade_-_Logistics_Plan.pdf (1186 KB) s Pages: 1 Version: 1 Size: 30''x42'' Uploaded: 4/25/2018 Lindsey_Bldg_D_Window_Replacement_Plans_Addendum_2.pdf (2269 KB) s Pages: 3 Version: 1 Size: 36''x24'' Uploaded: 4/25/2018 Lindsey_Elem_Schedule.pdf (314 KB) s Pages: 9 Version: 1 Size: 17''x11'' Uploaded: 4/25/2018 o Folder: 00 - TCC Bid Clarification 02 - Issued 04.27.2018 (Click to Expand: 0 sub folders and 2 files) Zip and Download this Sub Folder 00_TCC_Bid_Clarification_02_Narrative.pdf (90 KB) Pages: 2 Version: 1 Size: 9''x11'' Uploaded: 4/27/2018 RFI_PB057_-_Fire_Alarm_Device_Clarifications_180427.pdf (90 KB) Pages: 2 Version: 1 Size: 9''x11'' Uploaded: 4/27/2018 o Folder: 00 - TCC Subcontract Docs, Exhibits & TCC SWPPP Responsibility Docs (Click to Expand: 0 sub folders and 5 files) Zip and Download this Sub Folder 01_TCC_Sample_Subcontract.pdf (232 KB) Pages: 17 Version: 2 Size: 9''x11'' Uploaded: 4/18/2018 02_Exhibit_B_Conditional_Unconditional_Releases.pdf (18 KB) Pages: 4 Version: 1 Size: 9''x11'' Uploaded: 4/18/2018 02_Exhibit_C_TCC_Site_Safety_Expectations_.pdf (503 KB) Pages: 40 Version: 1 Size: 9''x11'' Uploaded: 4/18/2018 02_Exhibit_E_Subcontractor_s_Bonds.pdf (226 KB) Pages: 5 Version: 2 Size: 9''x11'' Uploaded: 4/18/2018 03_TCC_SWPPP_Responsibility_Doc.pdf (110 KB) Pages: 3 Version: 1 Size: 9''x11'' Uploaded: 4/18/2018 o Folder: 01 - Lindsey - Plans & Specs (Click to Expand: 0 sub folders and 3 files) Zip and Download this Sub Folder Lindsey_HAVC_Specs_-_DSA_APPROVED.pdf (47750 KB) Pages: 928 Version: 1 Size: 11''x9'' Uploaded: 4/18/2018 Lindsey_HVAC_Plans.pdf (134994 KB) s Pages: 108 Version: 1 Size: 42''x30'' Uploaded: 4/18/2018 Lindsey_Window_Replacement_Plans_-_Clouded.pdf (7567 KB) s Pages: 11 Version: 1 Size: 36''x24'' Uploaded: 4/18/2018 o Folder: 01 - Lindsey - Addendum 01 - Issued 04.26.2018 (Click to Expand: 0 sub folders and 1 files) Zip and Download this Sub Folder Linsdey_HVAC__-_Addendum_01_2018.04.26.pdf (12946 KB) s Pages: 85 Version: 1 Uploaded: 4/26/2018 o Folder: 01 - Lindsey - Addendum 02 - Issued 04.27.2018 (Click to Expand: 0 sub folders and 1 files) Zip and Download this Sub Folder Lindsey_HVAC_Addendum_02_2018.04.27.pdf (376 KB) Pages: 5 Version: 1 Size: 9''x11'' Uploaded: 4/27/2018 o Folder: 01 - Lindsey - Reports (Click to Expand: 0 sub folders and 1 files) Zip and Download this Sub Folder Lindsey_Academy_HVAC_Upgrades_Project_-_HazMat_Removals_Specification_Section_-_040318_Draft_APP-A.pdf (241 KB) Pages: 32 Version: 1 Size: 9''x11'' Uploaded: 4/18/2018 o Folder: 01 - Lindsey - Trade Scopes of Work (Click to Expand: 0 sub folders and 23 files) Zip and Download this Sub Folder 02._Demo.Abatement.pdf (25 KB) Pages: 5 Version: 1 Size: 9''x11'' Uploaded: 4/18/2018 03._Concrete.pdf (23 KB) Pages: 5 Version: 1 Size: 9''x11'' Uploaded: 4/18/2018 04._Misc_Metal.pdf (19 KB) Pages: 4 Version: 1 Size: 9''x11'' Uploaded: 4/18/2018 05._Casework.pdf (19 KB) Pages: 4 Version: 1 Size: 9''x11'' Uploaded: 4/18/2018 06._Rough_Carpentry.pdf (22 KB) Pages: 4 Version: 1 Size: 9''x11'' Uploaded: 4/18/2018 07._Drywall.Plaster.pdf (21 KB) Pages: 4 Version: 1 Size: 9''x11'' Uploaded: 4/18/2018 08._Building_Insulation.pdf (18 KB) Pages: 3 Version: 1 Size: 9''x11'' Uploaded: 4/18/2018 09._Roofing.pdf (20 KB) Pages: 4 Version: 1 Size: 9''x11'' Uploaded: 4/18/2018 10._Sheet_Metal.pdf (19 KB) Pages: 4 Version: 1 Size: 9''x11'' Uploaded: 4/18/2018 11._Doors_Frames_Hardware.pdf (19 KB) Pages: 4 Version: 1 Size: 9''x11'' Uploaded: 4/18/2018 12._Aluminum.Glazing.pdf (19 KB) Pages: 4 Version: 1 Size: 9''x11'' Uploaded: 4/18/2018 13._Tile.pdf (18 KB) Pages: 3 Version: 1 Size: 9''x11'' Uploaded: 4/18/2018 14._Acoustical_Ceiling.pdf (19 KB) Pages: 4 Version: 1 Size: 9''x11'' Uploaded: 4/18/2018 15._Finish_Flooring.pdf (20 KB) Pages: 4 Version: 1 Size: 9''x11'' Uploaded: 4/18/2018 16._Painting.pdf (20 KB) Pages: 4 Version: 1 Size: 9''x11'' Uploaded: 4/18/2018 17._Markerboards_Tackboards.pdf (17 KB) Pages: 3 Version: 1 Size: 9''x11'' Uploaded: 4/18/2018 18._Signage.pdf (17 KB) Pages: 3 Version: 1 Size: 9''x11'' Uploaded: 4/18/2018 19._Toilet_Compartment_Accessories.pdf (18 KB) Pages: 3 Version: 1 Size: 9''x11'' Uploaded: 4/18/2018 20._Window_Treatment.pdf (17 KB) Pages: 3 Version: 1 Size: 9''x11'' Uploaded: 4/18/2018 21._Plumbing.pdf (26 KB) Pages: 6 Version: 1 Size: 9''x11'' Uploaded: 4/18/2018 22._HVAC.pdf (25 KB) Pages: 5 Version: 1 Size: 9''x11'' Uploaded: 4/18/2018 23._Electrical.pdf (27 KB) Pages: 6 Version: 1 Size: 9''x11'' Uploaded: 4/18/2018 24._Chainlink_Fence_and_Gates.pdf (17 KB) Pages: 3 Version: 1 Size: 9''x11'' Uploaded: 4/18/2018 o Folder: 02 - Barton - Addendum 01 - Issued 04.25.2018 (Click to Expand: 0 sub folders and 1 files) Zip and Download this Sub Folder Addendum_01_Barton.pdf (25026 KB) s Pages: 69 Version: 1 Uploaded: 4/25/2018 o Folder: 02 - Barton - Addendum 02 - Issued 04.25.2018 (Click to Expand: 0 sub folders and 1 files) Zip and Download this Sub Folder Addendum_02_Barton_2018.04.25.pdf (30039 KB) s Pages: 99 Version: 1 Uploaded: 4/25/2018 o Folder: 02 - Barton - Addendum 03 - Issued 04.27.2018 (Click to Expand: 0 sub folders and 1 files) Zip and Download this Sub Folder Addendum_03_Barton_2018.04.27.pdf (11211 KB) s Pages: 19 Version: 1 Uploaded: 4/27/2018 o Folder: 02 - Barton - Plans & Specs (Click to Expand: 0 sub folders and 3 files) Zip and Download this Sub Folder Barton_Complete_Plans_DSA_Submittal.pdf (124048 KB) s Pages: 145 Version: 1 Size: 42''x30'' Uploaded: 4/18/2018 Barton_DSA_Submittal_Specs_Vol_1_of_2.pdf (6042 KB) Pages: 568 Version: 1 Size: 9''x11'' Uploaded: 4/18/2018 Barton_DSA_Submittal_Specs_Vol_2_of_2.pdf (5386 KB) Pages: 663 Version: 1 Size: 9''x11'' Uploaded: 4/18/2018 o Folder: 02 - Barton - Trade Scopes of Work - Issued 04.25.2018 (Click to Expand: 0 sub folders and 22 files) Zip and Download this Sub Folder 02._Demo.Abatement.pdf (114 KB) Pages: 5 Version: 1 Size: 9''x11'' Uploaded: 4/25/2018 03._Concrete.pdf (109 KB) Pages: 5 Version: 1 Size: 9''x11'' Uploaded: 4/25/2018 04._Misc_Metal.pdf (106 KB) Pages: 4 Version: 1 Size: 9''x11'' Uploaded: 4/25/2018 05._Casework.pdf (106 KB) Pages: 4 Version: 1 Size: 9''x11'' Uploaded: 4/25/2018 06._Rough_Carpentry.pdf (111 KB) Pages: 5 Version: 1 Size: 9''x11'' Uploaded: 4/25/2018 07._Drywall_.Plaster.pdf (110 KB) Pages: 4 Version: 1 Size: 9''x11'' Uploaded: 4/25/2018 08._Building_Insulation.pdf (106 KB) Pages: 4 Version: 1 Size: 9''x11'' Uploaded: 4/25/2018 09._Roofing.pdf (107 KB) Pages: 4 Version: 1 Size: 9''x11'' Uploaded: 4/25/2018 11._Doors_Frames_Hardware.pdf (109 KB) Pages: 4 Version: 1 Size: 9''x11'' Uploaded: 4/25/2018 12._Aluminum.Glazing.pdf (109 KB) Pages: 4 Version: 1 Size: 9''x11'' Uploaded: 4/25/2018 13._Tile.pdf (103 KB) Pages: 4 Version: 1 Size: 9''x11'' Uploaded: 4/25/2018 14._Acoustical_Ceiling.pdf (106 KB) Pages: 4 Version: 1 Size: 9''x11'' Uploaded: 4/25/2018 15._Finish_Flooring.pdf (107 KB) Pages: 4 Version: 1 Size: 9''x11'' Uploaded: 4/25/2018 16._Painting.pdf (106 KB) Pages: 4 Version: 1 Size: 9''x11'' Uploaded: 4/25/2018 17._Markerboards_Tackboards.pdf (104 KB) Pages: 3 Version: 1 Size: 9''x11'' Uploaded: 4/25/2018 18._Signage.pdf (102 KB) Pages: 3 Version: 1 Size: 9''x11'' Uploaded: 4/25/2018 19._Toilet_Compartment_Accessories.pdf (108 KB) Pages: 4 Version: 1 Size: 9''x11'' Uploaded: 4/25/2018 20._Window_Treatment.pdf (105 KB) Pages: 3 Version: 1 Size: 9''x11'' Uploaded: 4/25/2018 21._Plumbing.pdf (115 KB) Pages: 6 Version: 1 Size: 9''x11'' Uploaded: 4/25/2018 22._HVAC.pdf (113 KB) Pages: 6 Version: 1 Size: 9''x11'' Uploaded: 4/25/2018 23._Electrical.pdf (117 KB) Pages: 6 Version: 1 Size: 9''x11'' Uploaded: 4/25/2018 24._Chainlink_Fence_and_Gates.pdf (107 KB) Pages: 3 Version: 1 Size: 9''x11'' Uploaded: 4/25/2018

Lindsey Academy - 5075 Daisy Ave. - Long Beach, CALocation

Address: Lindsey Academy - 5075 Daisy Ave. - Long Beach, CA

Country : United StatesState : California

You may also like

Milford Elementary School HVAC Upgrade, B23120

Due: 15 Aug, 2024 (in 3 months)Agency: Swofford Construction, Inc.

Southside Elementary School HVAC and Window Replacement - Spec# 23-24/004

Due: 09 May, 2024 (in 5 days)Agency: Pittsylvania County Public Schools

Interior Painting Project-Central Elementary School

Due: 22 May, 2024 (in 18 days)Agency: ELIZABETH CITY/PASQUOTANK PUBLIC SCHOOLS

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.

Classification

Architect and Engineering Services