Stager Controllers for well-water filtration systems

expired opportunity(Expired)
From: Federal Government(Federal)
W912ES22Q0103

Basic Details

started - 05 Oct, 2022 (18 months ago)

Start Date

05 Oct, 2022 (18 months ago)
due - 18 Oct, 2022 (18 months ago)

Due Date

18 Oct, 2022 (18 months ago)
Bid Notification

Type

Bid Notification
W912ES22Q0103

Identifier

W912ES22Q0103
DEPT OF DEFENSE

Customer / Agency

DEPT OF DEFENSE (708180)DEPT OF THE ARMY (132982)USACE (38072)MVD (4892)W07V ENDIST ST PAUL (1153)
[object Object]

SetAside

SBA(Total Small Business Set-Aside (FAR 19.5))

Attachments (3)

unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

The Contractor shall provide five (5) custom Stager Controllers for the well-water filtration systems that are installed at the following Locks and Dams; LD2 (Hastings, MN), LD5 (Minnesota City, MN), LD5A (Fountain City, WI), LD7 (La Crescent, MN), LD9 (Eastman, WI).  These systems were originally designed, built and installed by Robert Hill Company in St Louis Park, MN.Stager ControllerComplete Stager ModuleUL (or nationally accredited test lab) listed components.12-month parts and labor warrantyPrograms start, stop and cycle time of backflush cycle for well water filtration system.Capable of controlling pump and up to four greensand tanks.Measures and displays flow which can be used to determine that system is working effectively.Water flow ranges between 0-100 GPM (gallons per minute).  Typical service flow rate is 75 GPM (@ 3.5 fps).Backwash Cycle:First Stage: 8 GPM/Sq FtMain Wash: 15 GPM/Sq FtMaximum Backwash Rate: 18 GPM/Sq FtBackwash Flow Rate: 75 GPMFirst Stage Flow Rate: 40 GPMFirst Stage Duration: 2 minutesTotal Backwash Duration: 10 minutesQuantity of Five (5) units at locations listed. Installation and TrainingIncludes turnkey installation, integration, programming and trainingIncludes Operator and Maintenance (O&M) Manual complete with schematics, recommended spare parts, part

KO CONTRACTING DIVISION 180 FIFTH STREET EAST  SUITE 700  SAINT PAUL , MN 55101-1678  USALocation

Place Of Performance : KO CONTRACTING DIVISION 180 FIFTH STREET EAST SUITE 700 SAINT PAUL , MN 55101-1678 USA

Country : United StatesState : Minnesota

You may also like

MTB #24-07 WATER TREATMENT SYSTEM IMPROVEMENTS - WELL 19

Due: 30 Apr, 2024 (in 4 days)Agency: Township of Mahwah

Classification

naicsCode 237110Water and Sewer Line and Related Structures Construction
pscCode J046Maintenance, Repair and Rebuilding of Equipment: Water Purification and Sewage Treatment Equipment