35631500 This project consists of the widening of Township Road 230 between and County Road 212 and Township Road 99 as well as a sanitary sewer along TR 99 from Howard Run Ditch to TR 230. The project widening is from 2-lanes to 3-lanes with the addition of a fourth lane at CR 212. The project also includes installing storm sewer and concrete curb & gutter the length of the TR 230 project. Included in the storm sewer improvement, but not limited to, is 1,042 LF of 24-inch storm sewer, 10 LF of 18-inch storm sewer, 367 LF of 15-inch storm sewer, 665 LF of 12-inch storm sewer, storm manhole installations, and catch basins. The sanitary sewer improvement is 3,605 LF of 18-inch sanitary sewer, sanitary manhole, and asphalt pavement trench repair as required. Grading & seeding is also included. Estimated Cost: $3,631,000 04/30/2024 06:00 PM