Mill Creek Road & Elgin Street Watermain

expired opportunity(Expired)
From: Waterloo(County)
T2024-119

Basic Details

started - 19 Mar, 2024 (1 month ago)

Start Date

19 Mar, 2024 (1 month ago)
due - 23 Apr, 2024 (7 days ago)

Due Date

23 Apr, 2024 (7 days ago)
Bid Notification

Type

Bid Notification
T2024-119

Identifier

T2024-119
Region of Waterloo

Customer / Agency

Region of Waterloo
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

This project includes the construction of new 300mm transmission watermain and replacement of the existing local 150mm watermain on Mill Creek Road. Removal of the existing watermain and installation of a dual use watermain on Samuelson Street, and the installation of an interconnect watermain on Elgin Street between Linnwood Ave and Hilltop Drive. The watermains listed above are to be installed by a combination of open-cut methods, including usage of a trench box to limit the proximity to the 10” high pressure gas main, and horizontal directional drilling for the Franklin Boulevard and Mill Creek box culvert crossings. The works also include the installation of a combination air and vacuum release valve. Bid Document Access : - Bid document preview, bid opportunity, and award notices are available on the site free of charge. Suppliers are not required to register for a bid opportunity prior to previewing unsecured bid documents. Please note, some documents may be secured and you will be required to register for the bid to download and view the documents. To obtain an unsecured version of the bid document and/or to participate in this opportunity, an annual or a per bid fee must be paid (annual fee - $418.95, per bid fee -

235 King St. E., 6th Floor Kitchener N2G 4N5 99Location

Address: 235 King St. E., 6th Floor Kitchener N2G 4N5 99

Country : CanadaState : Ontario

You may also like

2024 City of Red Wing Bituminous Mill & Overlay

Due: 21 May, 2024 (in 20 days)Agency: City of Red Wing

Invitation to Tender - Rupert Road Watermain Extension to Airport

Due: 02 May, 2024 (Tomorrow)Agency: Water main construction service

Small bridge replacement - Wolf Creek (Lower Grave Creek Road) Bridge 33C01

Due: 20 Jan, 2033 (in about 8 years)Agency: Josephine County

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.

Classification

Construction