Chain Link Fence Parts

From: Duval County Public Schools(School)
ITB-014-23/JR

Basic Details

started - 13 Oct, 2022 (18 months ago)

Start Date

13 Oct, 2022 (18 months ago)
due - 31 Aug, 2024 (in 4 months)

Due Date

31 Aug, 2024 (in 4 months)
Bid Notification

Type

Bid Notification
ITB-014-23/JR

Identifier

ITB-014-23/JR
Duval County Public Schools

Customer / Agency

Duval County Public Schools
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Dr. Diana L. Greene, Superintendent of Schools EVERY SCHOOL. EVERY CLASSROOM. EVERY STUDENT. EVERY DAY. Duval County Public Schools www.duvalschools.org Purchasing Services PH: (904) 858-4848 1701 Prudential Drive, Suite 322 FAX: (904)858-4868 Jacksonville, FL 32207 June 14, 2022 All State Construction 8640 Philips Highway, Suite 23 Jacksonville, FL 32256 RE: RFP No. 12-22/LM, Carpentry and Repair Services On Tuesday, June 7, 2022, The Duval County School Board approved the contract for Carpentry and Repair Services, RFP No.12-22/LM. In accordance with Section 19.0 of the RFP, Insurance Requirements, please forward an updated copy of your insurance certificate. If you have any questions about this award, please contact Louis Mitchum at (904) 858-4859. We look forward to a continued successful partnership. Terrence Wright, Director Duval County Public Schools cc Louis Mitchum Anita Locke Master Bid File
rel="nbinson\nMaster Bid folder\n\nDr. Diana L. Greene, Superintendent of Schools\n\nEVERY SCHOOL. EVERY CLASSROOM. EVERY STUDENT. EVERY DAY.\n" "ITB-014-23/] R CHAIN LINK FENCE PART\n\nUS WHOLESALE PIPE &\nTUBE INC\n\nItemDcePs# _ ________Descriotion ________| Qty | Unit\n\nBID TABULATION\n\nItems #1 -#3 shall be chain ink wire fencing, 2\"\n\nmesh, 9 gauge, and galvanized before weaving\n(GBW-smoothing) 50 ft. Rolls. ASTM A392, Class\n#1, zinc coating. GAW (galvanized after weaving) is\nacceptable . All 50 ftrolls of fencing must be\nbundled and palletized. shipment shall be refused if\nnot bundled and palletized properly Aluminum wire\nin not acceptablel\n\nKnuckle to knuckle , 48\"H. Merchants Metals\n\n#01125, Orlando Steel #FA20090048KK or al ac\n1 | 2365 lacceptable substitution ROLL $214.00 $12,840.00\n\nKnuckle to knuckle , 72\"H. Merchants Metals\n\n#01142, Orlando Steel #FA20090072KK or een) ou)\n2 | 2366 Jacceptable substitution 150 |ROLL $321.00 $48,150.00\n\nKnuckle to knuckle , 96\"H. Merchants Metals\n\n#01144, Orlando Steel #FA20090096KK or an can\n3 | 2367 Jacceptable substitution \u2014 Bu $428.00 $12,840.00\n\n1 | ____TOTALTEMSITHRU3 \u2014 |\n\nI 0 TOTALMEMS IHR USE m | - IIT77T973,830.00\n\n1-5/8\" o.d. Top rail, hot dipped galvanized inside\nand outside, walltthickness to be 140 and weight\n2.28 Ibs. Per foot. Top railmustbe completely\nencased in protective wrapping attime of deliverly.\nAll unwrapped shipment will be refused.\nMerchants metals #14601, Orlando Steel #P 15821\nor acceptable subatitution. 21ft. lengths.\nSCHEDULE 40, SS-40, TUF-40 OR ACCEPTABLE PER\n2379 |SUBSTITUTION 15,000 |FOOT $3.45 $51,750.00\n\nTIEMS 5 AND 6 AWARDED ALL OR NONE\nTtems #5 and #5 shall be tension bars , high\ncarbon steel galvanized\nFor 48\" fencing, 3/16 x 3/4. Merchants Metals\n#04011, Orlando Steel #TBR48 or acceptable cl\n5 | 2374 \\substitution 100 |EACH $3.00 $300.00\nFor 72\" fencing, 3/16 x 3/4. Merchants Metals\n#04013, Orlando Steel #TBR 72-3/4 or acceptable al an\n2375 |substitution EACH $4.50 $2,700.00\n\nPagelof4\n\n08/18/2022\n" "ITB-014-23/] R CHAIN LINK FENCE PART\n\nUS WHOLESALE PIPE &\n\nBID TABULATION\n\nTUBE INC\n\nte MD ce ps # Description | Qty | Unit | Price | Extension _\nBEE TOTAL mENS 5 AND TE BEE EEE EEE =\n\nITEMS 7 AND 8 AWARDED ALL OR NONE Items\n#7 and #8 shall be line posts hot dipped galvanized\ninside and outside SCHEDULE 40, TUF-40, SS-40,\nOR ACCEPTABLE SUBSTITUTION\n2\" 0.D. with wall thickness of .145x6' high and\nweight per foot 2.72 Ibs. Merchants Metals #14630,\nOrlando Steel #PC2006 or acceptable substitution\nSAW CUT ONLY, TORCH CUT IS NOT\nACCEPTABLE 144 |EACH $24.75 $3,564.00\ng\nweight per foot 2.735 Ibs. Merchants Metals #\n14634, Orlando Steel #PC2008 or acceptable\nsubstitution\nSAW CUT ONLY, TORCH CUT IS NOT\nACCEPTABLE 200 |EACH $33.00 $6,600.00\n\nOP ToTa Ems TaNDe | | [sa\n\nPage20f4\n\n08/18/2022\n" "ITB-014-23/] R CHAIN LINK FENCE PART\n\nBID TABULATION a re WHOLESALE PIPE &\n\na re\nItembePs# _ ________Descripion _______| Qty | Unit\n\np\nhot galvanized inside and outside. Wall thickness to\nbe. 154 and weight per foot 3.650 Ib merchant\nMetals #13109, SCHEDULE 40, TUF-40, SS-40\nOrlando Steel #PC3009 or acceptable substitution\nSAW CUT ONLY, TORCH CUT IS NOT\n2381 |ACCEPTABLE 300 |JEACH $79.50 $23,850.00\nTerminal post 6\" 0.D. x 9', Hot dipped galvanized\ninside and outside. Schedule 40 or SS-40 is\nacceptable (5) Pieces per bundle Orlando Steel #\nPC6589 or acceptable substitution SAW CUT\n10| 8252 |ONLY, TORCH CUT IS NOT ACCEPTABE 50 [EACH $280.00 $14,000.00\n- Loop caps for top rail, pressed steel only\ncommercial grade. Merchant Metals #02417,\nOrlando Steel #LCS200 or acceptable subatitution Bam\n2364 |Aluminum not acceptable EACH $2.50 $1,500.00\nITEMS 12 AND 13 AWARDED ALL OR NONE\nItems #12 and #13 shall be Acorn/Dome Caps\naluninum POINT TYPE ONLY\n\n1-5/8\" Orlando Steel #DCACRN158 or acceptable\n3\", Orlando Steel #DCACRN300 or acceptable\n\n0 TOTALTEMSDANDDBE | I mp 51,160.00\n\nBEE HEN en \u2014 galvanized thoroughly one way,\nwithout bolt. For 15/8\" O.D. posts. Mechant Metals\n#02223, Orlando Steel #TB250 or acceptable\n14 | 2348 |substitution 2,000 |EACH $0.70 $1,400.00\nTension band for 3\" 0.D. Posts. Galvanized\nthoroughly one way without bolts(100 qaty per bag)\nMechants Metals #2226. Orlando Steel #TB300 or\n15 | 2351 Jacceptable substitution 1,500 |JEACH $0.90 $1,350.00\n\nPage 30f4\n\n08/18/2022\n" "ITB-014-23/] R CHAIN LINK FENCE PART\n\nUS WHOLESALE PIPE &\n\nBID TABULATION\n\nTUBE INC\ntem DC PS DescHhion | Ay | unit || Price | Extension |\n\nRail ends Bands (Brace) 3\" O.D. Steel Galvanized\n\nthoroughly, one way without bolts. (250 qty per bag)\n\nMerchants Metals #02232 , Orlando Steel\n16 | 2353 |#RECC158 or acceptable substitution 300 [EACH $0.91 $273.00\n\nCarriage bolts and nuts, 5/16\" x 1-1/4\" , Galvanized.\n\n100 per box, Merchants Metals #10002, Orlando len\n17 | 2356 |Steel #3LT516125 or acceptable substitution. 100 |BOX $19.00 $1,900.00\n\nSleeves, steel, minimum wall thickness of .005. Min.\n\n6\"-7\" long. 0-5/8\" x 6\"L Merchants Metals #02042, Bun\n18 | 2373 |Orlando Steel #5LE158 or acceptable substitution 300 [EACH $1.95 $585.00\n\nCap, 1-5/8\", Rail end for top rail Aluminum, (250 qaty\n\n\u201a per bag) Merchant Metals #05059, Orlando Steel al am\n#RECA158 or acceptable substitution $2.20 $660.00\n\nGate, fitting, galvanized industrial box hinge, 3' post\nx 1-5/8\" size, \"bulldog\" (U-Bolttype) Steel\nassemblies. (10 qty per bag) Hinges must be\nassembled prior to shipping. Standard nut and\nbolt size required, (7/16\" U-Bolt and 5/16\" carriage\nbolt) Merchants Metals #02412, Orlando Steel\n#GHNG 905300 or acceptable substitution. Metric\n20| 2371 |size nuts and bolts are not acceptable. 300 [EACH $16.95 $5,085.00\n\nTie wires, aluminum, 9 gauge, (100/bag) 8-1/4\"\nlong. For 2-1'2\" diameter posts (100 qty per bag)\nMerchants Metals #08011, Orlando Steel #TWAI6\n21| 2377 Jor acceptable substitution. 150 [BAG $10.00 $1,500.00\n\nPrepared by: James Robinson\nVerified by: Mari Waremburg\n\nDate: 08/26/2022\nAward =\n\nPage 4of4\n\n08/18/2022\n"

1701 Prudential Drive Jacksonville, FL 32207Location

Address: 1701 Prudential Drive Jacksonville, FL 32207

Country : United StatesState : Florida

You may also like

RFQ #24.0030 Chain Link Fence Construction and Repair Services

Due: 14 May, 2024 (in 15 days)Agency: Strathcona County

11490 Chain Link Fencing at Silver Falls State Park

Due: 01 Jul, 2024 (in 2 months)Agency: Pacific Fence and Wire Company

Chain Link Fence Material

Due: 07 Sep, 2033 (in about 9 years)Agency: Highways and Infrastructure

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.