Design-Bid Build Repair Project of AUTEC Pier, Facility 1902 at Andros Island, Bahamas

expired opportunity(Expired)
From: Federal Government(Federal)
N6945021R0028

Basic Details

started - 08 Jun, 2021 (about 2 years ago)

Start Date

08 Jun, 2021 (about 2 years ago)
due - 30 Sep, 2023 (6 months ago)

Due Date

30 Sep, 2023 (6 months ago)
Pre-Bid Notification

Type

Pre-Bid Notification
N6945021R0028

Identifier

N6945021R0028
DEPT OF DEFENSE

Customer / Agency

DEPT OF DEFENSE (708533)DEPT OF THE NAVY (156879)NAVFAC (10911)NAVFAC ATLANTIC CMD (6593)NAVFAC SOUTHEAST (1197)NAVFACENGSYSCOM SOUTHEAST (1047)
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Pier Repair Project, Atlantic Undersea Test and Evaluation Center (AUTEC), Andros Island, Bahamas  Project Description:This project is for repair of the pier located at Facility 1902, AUTEC, Andros Island, Bahamas. The existing superstructure will be removed, and the existing steel piles will be cutoff and incorporated in the repaired pier. The proposed pier repair is a closed-pier mole-type structure with a steel H-pile combination wall aligned at the existing pier’s perimeter that will retain compacted structural fill. The compacted fill will be capped with a reinforced concrete slab-on-grade deck. The new pier will abut the existing landside bulkhead. The proposed pier will include shore power, potable water, fire protection system, lighting, mooring hardware and foam filled fender system. Pier utilities will tie-in to existing landside sources. Temporary mooring for AUTEC vessels will be constructed to provide safe mooring for the vessels during construction. The temporary mooring facility will be constructed to minimize interruptions to AUTEC operations.The AUTEC pier facility is the only berthing facility located at Andros Island, Bahamas to support the AUTEC Range. Potable water and AC electric power are available at the pier.In accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236 204, the Construction Magnitude for this project is between $25,000,000 and $100,000,000.The period of performance for this project is approximately 730 - 955 days.The Small Business Size Standard is $39.5 million

PO BOX 30 BLDG 903  JACKSONVILLE , FL 32212-0030  USALocation

Place Of Performance : PO BOX 30 BLDG 903 JACKSONVILLE , FL 32212-0030 USA

Country : United StatesState : Florida

Classification

naicsCode 237990Other Heavy and Civil Engineering Construction
pscCode Z2PZREPAIR OR ALTERATION OF OTHER NON-BUILDING FACILITIES