Design-Bid-Build Construction of Army Family Housing Replacement in Baumholder, Rhineland-Palatinate, Germany to support the development of Baumholder Military Community (BMC). This project is required to meet lodging quality of life standards for military personnel and their accompanying family members while in Permanent Change of Station (PCS) into or out of the Baumholder Family Housing Area (Smith Barracks or Wetzel Family Housing).The work includes the construction of a 64-unit Army Family unit replacement at Smith Barracks, Baumholder Military Community, Family Housing Area, USAG Rhineland-Palatinate, Germany. The primary facilities include: 12 three-bedroom apartments on Baumholder and 42 three-bedroom and 10 four-bedroom townhouse in Wetzel. The apartment building has a ground level garage and four apartments on each of the other three stories. The apartment building includes parking courts on each side of the building that provide access to the ground-level garages. Project
includes parking spaces for visitor parking located within close walking distance to the building. Each townhouse includes an attached garage and a driveway. Each townhouse has a lawn and a patio/balcony. Project provides new building systems and components to include electrical and mechanical systems, compliance with applicable force protection and energy conservation requirements, balconies, fire alarms/sprinkler systems, elevators, laundry rooms in each apartment and townhouse, modern kitchens and bathrooms, new efficient heating, plumbing and electrical systems (110 and 220V), TV/telephone/Internet wiring and distribution, built-in closets, doors, windows and storage rooms. Project includes exterior infrastructure that ties into the existing main utility lines and roadways. It includes connections to storm drainage lines, neighborhood recreational amenities, trash collection enclosures, electrical, water and sewer utility distribution systems, landscaping, and playgrounds. Full design drawings and specifications are provided with facility construction dimensions, materials, and details. The project construction is divided in sites. The potential acquisition includes:• Smith Barracks:o Junior Enlisted 3-bedroom Apartment building with 12 units: 22,035 SF • Wetzel housing:o 42 Junior Enlisted 3-bedroom Townhouses: 68,460 SFo 10 Junior enlisted 4-bedroom Townhouses: 19,500 SFo Power Substation: 300 SFo Heating Plant Building: 1,810 SFThe project also includes site-development (sidewalks and water culverts), parking spaces, playgrounds, roads, and junctions.PLEASE NOTE THAT WE WERE UNABLE TO UPLOAD ATTACHMENT 8 - DRAWINGS TO THIS SOLICITATION NOTICE. TO RECEIVE THE ATTACHMENT 8 - DRAWINGS VIA DOD SAFE PLEASE EMAIL
lorraine.q.laurente@usace.army.mil and
shawna.m.west@usace.army.mil.Submit price proposals in Euro using the attached Price Schedule.*****************************************************************************************************************************************************The site visit attendance sheet and pre-proposal PowerPoint presentation were uploaded to
www.SAM.gov on 27 February 2023.*****************************************************************************************************************************************************Amendment 0001 was posted on February 23, 2023.*****************************************************************************************************************************************************Amendment 0002 was posted on March 14, 2023.*****************************************************************************************************************************************************Amendment 0003 was posted on March 27, 2023.