RFP - WILDCAT CREEK RESTORATION AND GREENWAY TRAIL DESIGN AND PERMITTING CONSULTING SERVICES

expired opportunity(Expired)
From: San Pablo(City)
RFP - WILDCAT CREEK RESTORATION AND GREENWAY TRAIL DESIGN AND PERMITTING CONSULTING SERVICES

Basic Details

started - 17 Aug, 2017 (about 6 years ago)

Start Date

17 Aug, 2017 (about 6 years ago)
due - 18 Sep, 2017 (about 6 years ago)

Due Date

18 Sep, 2017 (about 6 years ago)
Bid Notification

Type

Bid Notification
RFP - WILDCAT CREEK RESTORATION AND GREENWAY TRAIL DESIGN AND PERMITTING CONSULTING SERVICES

Identifier

RFP - WILDCAT CREEK RESTORATION AND GREENWAY TRAIL DESIGN AND PERMITTING CONSULTING SERVICES
City of San Pablo

Customer / Agency

City of San Pablo
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

City of San Pablo NOTICE TO BIDDERS WILDCAT CREEK RESTORATION AND GREENWAY TRAIL DESIGN AND PERMITTING CONSULTING SERVICES City of San Pablo Project Number: WCC-TRL Bid Start Date: August 17, 2017 Mandatory Pre-bid Meeting: August 31, 2017 at 2:00 PM Bid Close Date: September 18, 2017, at 5:00 PM The City of San Pablo (the City) seeks a qualified consultant or consultant team to prepare the design documents and obtain the required permits for the: Wildcat Creek Restoration and Greenway Trail, from Church Lane to Vale Road The Wildcat Creek Restoration and Greenway Trail Project (Project) will restore the right bank of Wildcat Creek and develop approximately 0.5 mile of creekside trail between Church Lane and Vale Road in the City of San Pablo. Wildcat Creek drains an 11 square mile watershed straddling Alameda and Contra Costa Counties. The creek flows from the hilly open space areas of the East Bay Regional Park District; through the densely developed flatland communities of San
Pablo, Richmond, and unincorporated North Richmond. About 2.2 miles of Wildcat Creek’s open channel run through the community of the City of San Pablo. During World War II as commercial and residential development replaced remaining farmlands, little room was left for the creek’s natural processes. The proposed restoration and greenway trail project is located on Wildcat Creek between a private high school, condominium complexes on the west side and a city-owned 18-acre parcel to the east (formerly a trailer park, now known as “Plaza San Pablo”). The proposed Wildcat Creek Restoration and Greenway Trail Project will restore 2,200 linear feet of creek channel to effectively transport sediment throughout the reach without excessive aggradation or deposition while increasing the in-stream riffle-to-pool ratio. Other creek restoration benefits include refuge areas for trout, a modified floodplain to accommodate larger flow volumes, a widened creek corridor, soil bioengineering applications and planting of riparian plants on the restored bank. This project will also create a greenway trail for safe cycling and pedestrian path. Related improvements include: lighting improvements and associated underground conduit systems, security cameras, concrete benches, trail landscaping, interpretive signs, bicycle racks and bollards. Download Available at http://www.blueprintexpress.com/

City of San Pablo, City Clerk's Office, 13831 San Pablo Ave. Bldg. 1, San Pablo, CA 94806Location

Address: City of San Pablo, City Clerk's Office, 13831 San Pablo Ave. Bldg. 1, San Pablo, CA 94806

Country : United StatesState : California

You may also like

8666 Floodplain Restoration Design and Vegetation Restoration

Due: 31 Dec, 2026 (in about 2 years)Agency: Molalla River Watch Watershed Council

Roof Restoration Birds Creek

Due: 09 May, 2024 (in 10 days)Agency: County of Hastings

Design of Westside Trail (Wildhorse Trail)

Due: 15 May, 2024 (in 16 days)Agency: City of Pueblo

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.

Classification

Public Works Projects