Project Name:10190 Iron Rock Way Tenant ImprovementsProject Type:BuildingOwnership:Public Project City, State:Elk Grove, California Engineer's Estimated Cost:$1,284,000 to $1,284,000 Pre-Qualification for Bidders:Not RequiredLicense Type Required:B, C-16Project/Contract Number:WFC045Project Contact: Kim Brown City of Elk Grove Public Works - CIP 8401 Laguna Palms Way Elk Grove, CA 95758 Tel:(916) 627-3316 Fax:(916) 691-3173
kbrown@elkgrovecity.org Bid Due Date:11/15/22 Bid Due Time:3:00 PM Bid Bond Percentage: 10% Mandatory Pre Bid Conference Date:10/26/22 Pre Bid Conference Time :3:00 PM Pre Bid Conference Location:10190 Iron Rock Way, Elk Grove, CA 95624 Project Description:The proposed Work shall be performed in accordance with the plans, specifications and other Contract Documents and shall include but not be limited to the following: selective demolition, architectural, plumbing, mechanical, electrical, low voltage,
lighting, modifications to the Fire Sprinkler and Alarm systems, modifications to the camera surveillance and access control management systems (ACMS), new site CMU block wall and masonry (Bid Alternate 12), and Furniture, Fixture and Equipment (FF&E) procurement and installation. The Work will result in the demolition of existing unoccupied spaces to expand the Women’s locker room, relocate, refurbish and install sixteen (16) existing lockers to include pedestals, electrical and lighting, procure and install up to thirty (30) new lockers to include electrical and lighting (Bid Alternates 9-11), infill existing external storage space for new Armory, SWAT and Work Bench spaces, new Heating, Ventilation and Air Conditioning (HVAC) system to include one new air conditioning (AC) unit, five (5) new pneumatic lines connected to a City furnished air compressor at these new spaces (new Armory, SWAT and Work Bench spaces), FF&E consisting of storage solutions, new lighting, cameras, access control, flooring, casework and wall finishes. The Contractor shall provide temporary facilities to support the onsite operation to include a three (3) stall self-contained restroom and shower facilities to include full service and janitorial services during construction (Work).