RFB 5591 Mary Rhodes Pipeline Ph. 1 System Improvements, E13037

expired opportunity(Expired)
From: Corpus Christi(City)
RFB 5591

Basic Details

started - 29 Jan, 2024 (2 months ago)

Start Date

29 Jan, 2024 (2 months ago)
due - 17 Apr, 2024 (10 days ago)

Due Date

17 Apr, 2024 (10 days ago)
Bid Notification

Type

Bid Notification
RFB 5591

Identifier

RFB 5591
City of Corpus Christi Contracts Procurement

Customer / Agency

City of Corpus Christi Contracts Procurement
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Scope A Site Visit will be held on Tuesday, March 5, 2024. Contractors will meet at the ON Stevens Water Treatment Plant, 13101 Leopard St. at 8:00 am., at the Woodsboro Booster Pump Station at 9:00 am. and the Bloomington Pump Station at 11:00 am. NO OTHER SITE VISITS ARE PLANNED. The project scope of work includes: Furnish, install, test, and provide assistance during commissioning for improvements at the Bloomington and Woodsboro raw water booster pump stations that serve the City of Corpus Christi’s Mary Rhodes Pipeline. The work includes the following: Bloomington Booster Pump Station: • A new horizontal split-case centrifugal pump and associated pipe, valves, and fittings. • Two new medium voltage variable frequency drives (VFD), one for the new pump and one to replace an existing VFD on an existing pump. • Remove hydro-pneumatic valve actuators on the pump discharge flow control valves and replace with new electric motor valve actuators for four existing pump trains and one new
pump train. • A new electro-magnetic flow meter within a new concrete vault, associated connections to the existing pipeline, and electrical and signal cabling and conduits. • New sump pumps: three in existing valve vaults and one in the new meter vault, and associated controllers, electrical and signal cabling, and conduits. • Sump pump discharge piping from the vaults to the existing water storage tank. • One new low voltage emergency generator and associated duct bank. • Two new outdoor air conditioning units, modifications to two existing air handler units, and associated modifications to ducting, louvers, wiring, and controls. • Replacement of heaved concrete panels adjacent to the storage tank. • Selective process mechanical, building mechanical, and electrical demolition. • Instrumentation and controls programming associated with the new pumps, pump control valves, and flow meters. Woodsboro Booster Pump Station: • One new medium voltage variable frequency drive (VFD) to replace an existing VFD on an existing pump. • Remove hydro-pneumatic valve actuators on the pump discharge flow control valves and replace with new electric motor valve actuators for four existing pump trains. • A new electro-magnetic flow meter within a new concrete vault, associated connections to the existing pipeline, and electrical and signal cabling and conduits. • New sump pumps: three in existing valve vaults and one in the new meter vault, and associated controllers, electrical and signal cabling, and conduits. • Sump pump discharge piping from the vaults to the existing water storage tank. • One new low voltage emergency generator and associated duct bank. • Two new outdoor air conditioning units, modifications to two existing air handler units, and associated modifications to ducting, louvers, wiring, and controls. • Selective process mechanical, building mechanical, and electrical demolition. • Instrumentation and controls programming associated with the new pumps, pump control valves, and flow meters.

1201 Leopard Street Corpus Christi, Texas 78401Location

Address: 1201 Leopard Street Corpus Christi, Texas 78401

Country : United StatesState : Texas

You may also like

JOC for Wet Utility Pipeline Projects - Hunter Contracting

Due: 31 May, 2024 (in 1 month)Agency: Hunter Contracting Company

Cedar Drive Upgrades – Phase 1: Partington Creek Conveyance Improvements

Due: 08 May, 2024 (in 10 days)Agency: Conveyance systems installation and repair

JOC for Wet Utility Pipeline Projects - Hunter Contracting

Due: 31 May, 2024 (in 1 month)Agency: City of Peoria

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.