Modifications to the Converter Compressor Facility for SLS Block 1B, Phase 1, John F. Kennedy Space Center, Florida

expired opportunity(Expired)
From: Federal Government(Federal)
80KSC020R0001

Basic Details

started - 20 Feb, 2020 (about 4 years ago)

Start Date

20 Feb, 2020 (about 4 years ago)
due - 26 Feb, 2020 (about 4 years ago)

Due Date

26 Feb, 2020 (about 4 years ago)
Bid Notification

Type

Bid Notification
80KSC020R0001

Identifier

80KSC020R0001
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

Customer / Agency

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (8351)NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (8351)NASA KENNEDY SPACE CENTER (301)

Attachments (18)

unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

The Contractor shall furnish all management, supervision, labor, transportation, facilities, materials, tools, equipment, disposal, and documentation (except any property, including utilities, specified in the Schedule to be Government-Furnished) to perform all work for the Tasks named below, and defined in the contract drawings, maps, specifications, and/or statements of work.The work includes, but is not limited to, the following:1. General renovation of the existing CCF including removal and replacement of facility roofing system, removal and replacement of an acoustic ceiling tile system, architectural modifications to existing shop and office areas, civil site work for new utilities installation, structural modifications for an expanded safe room, potable water and plumbing modifications, modifications to medium and low voltage electrical power systems, removal and replacement of lighting systems, addition of a lightning protection system, replacement of HVAC equipment and duct
work throughout the facility, installation of a new fire suppression system, and removal and replacement of a fire alarm system.2.  Modifications and upgrades to the existing Liquid Helium (LHe) Transfer Area and Valve Yard including removal and relocation of gas bag trailers, removal and reinstallation of existing LHe dewars (includes temporary storage), removal of LHe transfer cryogenic process piping, removal of Gaseous He (GHe) process piping, civil and structural modifications to existing concrete pads, installation of an exterior covered walkway and canopy system over LHe pumps provided by others, procurement and installation of large LHe vaporizers, installation of new LHe cryogenic process piping, and installation of new GHe process piping to new and existing equipment/supply lines. Systems must comply with applicable ASME Code references specified.3.  Installation of a new Ground Support Pneumatics (GSPN) console including installation of control console computers and monitors in the new control room portion of the facility safe area, installation of PLCs at locations around the CCF, installation of equipment racks at locations around the CCF, installation of control and power wiring, installation of gas analyzer equipment, installation of sensing devices, connection to PLCs for the LHe pumps provided by others, and programming, GUI development, and testing of the GSPN console and all field equipment prior to implementation in production service. The existing GSPN console equipment must remain in service, connected to end item equipment, powered, air conditioned, accessible, and protected from the construction environment (i.e. dust, noise, etc.).4.  Existing equipment, components, assemblies, etc., that must be removed and replaced/reinstalled known to have coatings containing or are partially comprised of asbestos, heavy metals, and/or PCBs. Abatement procedures will be required for certain construction activities.This project includes working in a fully operational facility that cannot have any significant duration of downtime without substantial coordination around launch and launch vehicle processing schedules. The CCF must remain operational with operations personnel able to perform work related to the existing GSPN console, existing GHe compressors and scavenger compressors, and existing LHe pump and vaporizer (temporary installation by others) as required to perform launch and launch vehicle processing operations at locations it supplies with GHe. Phasing of work around daily operations of the CCF is critical to the success of the project. Daily coordination with operations personnel for outages and work in different areas will be required to keep the CCF operational and perform the work specified.NOTE:  Contract Attachment J-F, Drawings, have been split into 3 files under this announcement due to the file size limitations.

Orlando ,
 FL  32899  USALocation

Place Of Performance : N/A

Country : United StatesState : FloridaCity : KENNEDY SPACE CENTER

You may also like

Notice of Availability -- Commercial Aerospace Opportunities at John F. Kennedy Space Center

Due: 02 Jun, 2024 (in 29 days)Agency: NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

Classification

naicsCode 236210Industrial Building Construction
pscCode Y1EZCONSTRUCTION OF OTHER INDUSTRIAL BUILDINGS