The Contractor must furnish all management, supervision, labor, material, equipment, tools, supplies, consumables, parts, and related services, in accordance with the SOW, drawings, and specifications to demolish all existing flooring, abate and properly dispose of asbestos mastic in all rooms, and install Armstrong LVT Plank flooring or equal according to manufacturer’s’ instructions and 6” cove base according to manufacturer’s instructions in the HIMS department (Building 1, Basement, Rooms 29, 30, 31, 32 including 2 electrical closets (36 & 38), and 37). Electronic Portable Document Format (.pdf) copies of drawings and specifications to this work will be furnished by VA upon Contractor’s written request to the Contracting Officer (CO). Hard copies of SOW, drawings, and specifications must be the Contractor’s responsibility and expense. Contractor is responsible to verify existing and new dimensions, locations, and quantities to complete this project located on the VHSO Main Campus 1100 N. College Avenue, Fayetteville, AR 72703.SITE VISIT INFORMATION: December 4, 2023 at 10:00 AM at VHSO Main Campus 1100 N. College Avenue, Fayetteville, AR 72703. ( Building 1