Emsworth Locks and Dams Miter Gate Hydraulic System Upgrade

expired opportunity(Expired)
From: Federal Government(Federal)
W911WN22B8002

Basic Details

started - 30 Jun, 2022 (21 months ago)

Start Date

30 Jun, 2022 (21 months ago)
due - 29 Jun, 2022 (21 months ago)

Due Date

29 Jun, 2022 (21 months ago)
Bid Notification

Type

Bid Notification
W911WN22B8002

Identifier

W911WN22B8002
DEPT OF DEFENSE

Customer / Agency

DEPT OF DEFENSE (705719)DEPT OF THE ARMY (132647)USACE (37955)LRD (5538)US ARMY ENGINEER DISTRICT PITTSBURG (470)
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

The U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves the upgrade of the miter gate hydraulics systems at Emsworth Locks and Dams, Ohio River, PA. The contract generally includes the installation of four (4) dedicated hydraulic power units (HPU) on the main chamber with new variable frequency drive (VFD) motor control centers (MCC), installation of a new central HPU for the auxiliary chamber, demolition of the existing central HPU, and demolition of existing hydraulic pipes and valves associated with the main chamber. The major features of the requirements are identified below: The contract specifically includes: a. Installation of additional shutoff valves on the middle wall oil piping to enable removal of the main chamber miter gate operating machinery from the existing central hydraulic network.b. Testing of existing fiber optic network and production of network map.c. Furnishings and installation of four dedicated HPU, including raised concrete pads,
protection, associated electronics and hardware, and hydraulic oil, by each of the miter gate locations on the main chamber.d. Furnishing and delivery of spare dedicated HPU.e. Furnishing and installation of VFD control MCCs on the land and middle walls.f. Furnishing and installation of new auxiliary chamber HPU on middle wall, including all associated electronics and hardware.g. Furnishing and delivery of spare motor and pump for auxiliary HPU.h. Furnish and install new miter gate position feedback sensors.i. Modification of existing control software to allow for automated miter gate operation and HPU monitoringj. Demolition and disposal of existing HPU located in the middle wall operation building. This includes all motors, pumps, reservoir, raised skid, associated piping, and proper disposal of hydraulic oil.k. Demolition and removal of all existing hydraulic oil lines on the land wall, including all lines for pressure, return, drain, and filling, valving, and proper disposal of hydraulic oil.l. Integration of new system with existing fiber optic communication cabling.Removal and proper disposal of hydraulic oil will be required. Removal and proper disposal of electrical equipment will be required. Ferrous and all other construction waste material will be disposed of at commercially permitted facilities licensed to accept waste or recyclable materials as applicable. Construction work will occur in close proximity to waterway traffic and operating lock and dam gates. The existing lock chambers and dams are currently operated and staffed by Government personnel 24 hours a day 365 days of the year. Lock closures for installation and testing of new equipment will be required to be minimal and at the approval of Government. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W911WN22B8002' to obtain more details.*29 June 2022:  Bid opening held virtually at 1100 ET, attendance register and bid results attached.30 June 2022:  An updated Bid Results list has been posted due to a typo error on the “.” on the Total Bid Amount for Marine Diving Solutions, LLC.

KO CONTRACTING DIV WMFM 1000 LIBERTY AVE RM 727  PITTSBURGH , PA 15222-4198  USALocation

Place Of Performance : KO CONTRACTING DIV WMFM 1000 LIBERTY AVE RM 727 PITTSBURGH , PA 15222-4198 USA

Country : United StatesState : Pennsylvania

You may also like

Raystown Dam Hydraulic Mechanical Gate and Bulkhead Replacements

Due: 13 May, 2024 (in 24 days)Agency: DEPT OF DEFENSE

UPPER MISSISSIPPI RIVER LOCKS 3 & 4 MITER GATE SUPPLY

Due: 15 Jul, 2024 (in 2 months)Agency: DEPT OF DEFENSE

Classification

naicsCode 237990Other Heavy and Civil Engineering Construction
pscCode Z2KAREPAIR OR ALTERATION OF DAMS