Status: Posted
Contact Name: Elaine Robbins
Contact Number: 940-369-7229
Contact Email:
elaine.robbins@untsystem.eduResponse Due Time: 2:00 PM
Agency/Texas SmartBuy Member Number: 769
Days Solicited: 21+ Days for Solicitation Notice
Solicitation Posting Date: 5/12/2022
Response Due Date: 6/13/2022
Last Modified: 5/12/2022 6:17 pm
Solicitation Description: This project is for the build out of the retail space at the newly built dining hall, Eagle Landing, located at 1416 Maple, Denton, Texas. The retail space is approximately 2,700 gross square feet (GSF). It is consistent with the institution’s strategic land and campus master plan. The facility includes market area, coffee/baker server and Which Wich server along with associated kitchen, preparation, storage, wash room, and other necessary support areas for a modern retail facility. The retail space is to prove the
student and faculty a unique experience of a coffee shop and market, by the use of its materials, rich warm wood porcelain tile tones, and patina metal porcelain tile tones, in an intimate setting with lots of natural light. Notice to Proceed for construction is anticipated to be July 2022, with substantial completion in November 2022 and final completion in December 2022.
This project is for the build out of the retail space at the newly built dining hall, Eagle Landing, located at 1416 Maple, Denton, Texas. The retail space is approximately 2,700 gross square feet (GSF). It is consistent with the institution’s strategic land and campus master plan. The facility includes market area, coffee/baker server and Which Wich server along with associated kitchen, preparation, storage, wash room, and other necessary support areas for a modern retail facility. The retail space is to prove the student and faculty a unique experience of a coffee shop and market, by the use of its materials, rich warm wood porcelain tile tones, and patina metal porcelain tile tones, in an intimate setting with lots of natural light. Notice to Proceed for construction is anticipated to be July 2022, with substantial completion in November 2022 and final completion in December 2022.
URL:
Addendum:
Class/Item Code(s): 90927-Building Construction, Educational 90945-Finishes: Flooring, Wall And Ceiling, Etc.