Bid Solicitation: WD-23-049 Header Information Bid Number: WD-23-049 Description: Golden Avenue Water Main Replacement Project (WD-54-22) Bid Opening Date: 02/08/2023 03:00:00 PM Purchaser: Jinny Huang-Uy Organization: Long Beach Water Department Department: ENGINEERING - Engineering Bureau Location: 6006 - Engineering Fiscal Year: 23 Type Code: 01 - ITB - Invitation to Bid Allow Electronic Quote: Yes Alternate Id: Required Date: Available Date : 12/30/2022 07:00:00 AM Info Contact: Contact Valeri Karakanov at (562)570-2331 Bid Type: OPEN Informal Bid Flag: No Purchase Method: Blanket Blanket/Contract Begin Date: 03/01/2023 Blanket/Contract End Date: 03/03/2025 Pre Bid Conference: Online Meeting: E-mail to
Valeri.Karakanov@lbwater.org and include subject line "Golden Avenue Water Main Replacement (MC-5223): RSVP to Pre-Bid Conference" Bulletin Desc: The Work consists of all work related to the replacement of existing
6-inch ductile iron water main and 48 copper water services with new non-metallic piping, replacement of existing water valves, and three first hydrants along Golden Avenue between Spring St and 32nd St. Ship-to Address: Water Department 1800 E Wardlow Rd Long Beach, CA 90807 US Email:
Fernando.Eggleston@lbwater.org Phone: (562)570-2329 Bill-to Address: Water Department 1800 E Wardlow Rd Long Beach, CA 90807 US Email:
Fernando.Eggleston@lbwater.org Phone: (562)570-2329 File Attachments: Form Attachments: Required Quote Attachments Desired Attachment Name: Bid Description: Bid form. NOTE: Original Bidder's Bond and Noncollusion Affidavit must be mailed or hand-delivered (see Instructions to Bidders) Pre-Bid Meeting: Yes Mandatory: No Pre-Bid Meeting On (PST): 01/25/2023 10:00:00 AM Pre-Bid Meeting Location: Online Meeting: E-mail to
Valeri.Karakanov@lbwater.org and include subject line "Golden Avenue Water Main Replacement (MC-5223): RSVP to Pre-Bid Conference" Amendments: Amendment # Amendment Date Amendment Note 1 01/12/2023 09:10:43 AM Attachment File Changes: Header 1. File 'MC-5223-DWG-GoldenAveDrawings-Revised Final (20221117 Rev) RV Signed.pdf': Show Attachment to Vendor Flag changed from "No" to "Yes". 2. File 'MC-5223-SPC-GoldenAveSpecifications-Revised Final Signed.pdf': Show Attachment to Vendor Flag changed from "No" to "Yes". 2 01/12/2023 03:15:45 PM Addendum No. 1 - Pre-bid meeting & Bid Opening date changes Header 1. Bid Opening Date changed from "02/01/2023 03:00:00 PM" to "02/08/2023 03:00:00 PM". 2. Custom Field: Custom Field changed from "01/18/2023 10:00:00 AM" to "01/25/2023 10:00:00 AM". Attachment File Changes: Header 1. File 'MC-5223 / WD-54-22 Addendum No.1 ': File 'MC-5223 / WD-54-22 Addendum No.1 ' added . 3 02/02/2023 03:29:56 PM Questions and Answers for Golden Avenue Water Main Replacement (MC-5223) Attachment File Changes: Header 1. File 'MC-5223_QA.pdf': File 'MC-5223_QA.pdf' added . Item Information 1-5 of 29 1 Item # 1: ( 913 - 60 ) Mobilization/Demobilization NIGP Code: Construction, Water System, Plants, Main and Service Line Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost 1.0 LS - Lump Sum Manufacturer: Brand: Model: Make: Packaging: Item # 2: ( 925 - 86 ) Construction Survey Staking and Verifications of utility locations, and field dimensions NIGP Code: Surveyor Services, Land Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost 1.0 LS - Lump Sum Manufacturer: Brand: Model: Make: Packaging: Item # 3: ( 968 - 84 ) Work area traffic control and temporary restriping NIGP Code: Traffic Control Services, Including Placement and Removal of Control Devices Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost 1.0 LS - Lump Sum Manufacturer: Brand: Model: Make: Packaging: Item # 4: ( 913 - 60 ) Excavation /Safety Measures NIGP Code: Construction, Water System, Plants, Main and Service Line Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost 1.0 LS - Lump Sum Manufacturer: Brand: Model: Make: Packaging: Item # 5: ( 913 - 60 ) Dewatering NIGP Code: Construction, Water System, Plants, Main and Service Line Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost 1.0 LS - Lump Sum Manufacturer: Brand: Model: Make: Packaging: 1-5 of 29 1