Golden Avenue Water Main Replacement Project (WD-54-22)

expired opportunity(Expired)
From: Long Beach(City)
WD-23-049

Basic Details

started - 30 Dec, 2022 (15 months ago)

Start Date

30 Dec, 2022 (15 months ago)
due - 08 Feb, 2023 (13 months ago)

Due Date

08 Feb, 2023 (13 months ago)
Bid Notification

Type

Bid Notification
WD-23-049

Identifier

WD-23-049
City of Long Beach

Customer / Agency

City of Long Beach
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Bid Solicitation: WD-23-049 Header Information Bid Number: WD-23-049 Description: Golden Avenue Water Main Replacement Project (WD-54-22) Bid Opening Date: 02/08/2023 03:00:00 PM Purchaser: Jinny Huang-Uy Organization: Long Beach Water Department Department: ENGINEERING - Engineering Bureau Location: 6006 - Engineering Fiscal Year: 23 Type Code: 01 - ITB - Invitation to Bid Allow Electronic Quote: Yes Alternate Id: Required Date: Available Date : 12/30/2022 07:00:00 AM Info Contact: Contact Valeri Karakanov at (562)570-2331 Bid Type: OPEN Informal Bid Flag: No Purchase Method: Blanket Blanket/Contract Begin Date: 03/01/2023 Blanket/Contract End Date: 03/03/2025 Pre Bid Conference: Online Meeting: E-mail to Valeri.Karakanov@lbwater.org and include subject line "Golden Avenue Water Main Replacement (MC-5223): RSVP to Pre-Bid Conference" Bulletin Desc: The Work consists of all work related to the replacement of existing
6-inch ductile iron water main and 48 copper water services with new non-metallic piping, replacement of existing water valves, and three first hydrants along Golden Avenue between Spring St and 32nd St. Ship-to Address: Water Department 1800 E Wardlow Rd Long Beach, CA 90807 US Email: Fernando.Eggleston@lbwater.org Phone: (562)570-2329 Bill-to Address: Water Department 1800 E Wardlow Rd Long Beach, CA 90807 US Email: Fernando.Eggleston@lbwater.org Phone: (562)570-2329 File Attachments: Form Attachments: Required Quote Attachments Desired Attachment Name: Bid Description: Bid form. NOTE: Original Bidder's Bond and Noncollusion Affidavit must be mailed or hand-delivered (see Instructions to Bidders) Pre-Bid Meeting: Yes Mandatory: No Pre-Bid Meeting On (PST): 01/25/2023 10:00:00 AM Pre-Bid Meeting Location: Online Meeting: E-mail to Valeri.Karakanov@lbwater.org and include subject line "Golden Avenue Water Main Replacement (MC-5223): RSVP to Pre-Bid Conference" Amendments: Amendment # Amendment Date Amendment Note 1 01/12/2023 09:10:43 AM Attachment File Changes: Header 1. File 'MC-5223-DWG-GoldenAveDrawings-Revised Final (20221117 Rev) RV Signed.pdf': Show Attachment to Vendor Flag changed from "No" to "Yes". 2. File 'MC-5223-SPC-GoldenAveSpecifications-Revised Final Signed.pdf': Show Attachment to Vendor Flag changed from "No" to "Yes". 2 01/12/2023 03:15:45 PM Addendum No. 1 - Pre-bid meeting & Bid Opening date changes Header 1. Bid Opening Date changed from "02/01/2023 03:00:00 PM" to "02/08/2023 03:00:00 PM". 2. Custom Field: Custom Field changed from "01/18/2023 10:00:00 AM" to "01/25/2023 10:00:00 AM". Attachment File Changes: Header 1. File 'MC-5223 / WD-54-22 Addendum No.1 ': File 'MC-5223 / WD-54-22 Addendum No.1 ' added . 3 02/02/2023 03:29:56 PM Questions and Answers for Golden Avenue Water Main Replacement (MC-5223) Attachment File Changes: Header 1. File 'MC-5223_QA.pdf': File 'MC-5223_QA.pdf' added . Item Information 1-5 of 29 1 Item # 1: ( 913 - 60 ) Mobilization/Demobilization NIGP Code: Construction, Water System, Plants, Main and Service Line Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost 1.0 LS - Lump Sum Manufacturer: Brand: Model: Make: Packaging: Item # 2: ( 925 - 86 ) Construction Survey Staking and Verifications of utility locations, and field dimensions NIGP Code: Surveyor Services, Land Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost 1.0 LS - Lump Sum Manufacturer: Brand: Model: Make: Packaging: Item # 3: ( 968 - 84 ) Work area traffic control and temporary restriping NIGP Code: Traffic Control Services, Including Placement and Removal of Control Devices Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost 1.0 LS - Lump Sum Manufacturer: Brand: Model: Make: Packaging: Item # 4: ( 913 - 60 ) Excavation /Safety Measures NIGP Code: Construction, Water System, Plants, Main and Service Line Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost 1.0 LS - Lump Sum Manufacturer: Brand: Model: Make: Packaging: Item # 5: ( 913 - 60 ) Dewatering NIGP Code: Construction, Water System, Plants, Main and Service Line Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost 1.0 LS - Lump Sum Manufacturer: Brand: Model: Make: Packaging: 1-5 of 29 1

Long Beach City Hall 333 W Ocean Blvd Fl13Location

Address: Long Beach City Hall 333 W Ocean Blvd Fl13

Country : United StatesState : California

You may also like

Air Wall Replacement Project

Due: 29 Mar, 2024 (Today)Agency: City of Santa Clara

2024 Water Main Replacement Projects

Due: 17 Apr, 2024 (in 19 days)Agency: San Antonio Water System

THIS PROJECT IS TO INSTALL BIRD DETERRENT DEVICES AT THE MARIPOSA LPOE BUILDING C

Due: 29 Mar, 2024 (Today)Agency: PUBLIC BUILDINGS SERVICE

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.