Russell Campus Building & Fire Prevention Lighting Control System Replacement

expired opportunity(Expired)
From: Southern Nevada Regional Housing Authority(State)
started - 01 Nov, 2022 (3 months ago)

Start Date

01 Nov, 2022 (3 months ago)
due - 01 Nov, 2022 (3 months ago)

Due Date

01 Dec, 2022 (2 months ago)
Bid Notification

Opportunity Type

Bid Notification
606407-22 Addendum 1

Opportunity Identifier

606407-22 Addendum 1
Southern Nevada Regional Housing Authority

Customer / Agency

Southern Nevada Regional Housing Authority
340 N 11th Street, Las Vegas, NV 89101

Location

340 N 11th Street, Las Vegas, NV 89101
unlockUnlock the best of InstantMarkets.
Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Clark County invites qualified firms or individuals to submit bids. Questions regarding this bid must be directed to the Bid Contact listed in this bid. The "Project" of which the "Work" of the Contract is a part titled Russell Campus Building & Fire Prevention – Lighting Control System Replacement and is located at 4701 S. Russell Road, Las Vegas Nevada 89119. The "Work" is described in the Project Drawings and Divisions 01 through 26 of the Project Manual. The Work consists of the construction of replacement of existing lighting control system with new lighting control panels, lighting control devices and lighting control cabling throughout the entire building including the installation and installation of 2 nd floor new light fixtures and associated supporting cables and power accessories, Construction includes all administrative work as outlined in the Division 01 General Requirements and the following using materials noted on Drawings and Specifications: Scope 1 - All demolition and repair Work as noted by divisions 02, 09 and 26. Demolition of the lighting control equipment including the lighting relay panels, lighting control devices and existing lighting control cabling plus the demolition of 2 nd floor light fixtures and associated supporting cables and power accessories. Scope 2 - Installation of new lighting control panels, lighting control devices and lighting control cabling throughout the entire building plus the installation of the new 2 nd floor light fixtures, associated supporting cables and power accessories. Commissioning of the lighting control panels connection to the building management system and the commissioning/programming of the lighting analytics system. Power connections for a complete system including conduit, boxes and conductors to support the new equipment. Connection of the lighting control panels and analytics system to the building LAN/WAN system. Repairing and painting/patching of all ceilings and walls and replacement of damaged ceiling tiles shall be completed to repair the existing spaces back to their original condition. Material storage shall be limited to on site storage containers, provided by the contractor and coordinated with the engineer/RPM D&C. Bid Opening will be held via Webex: To join: Copy and paste url: https://clarkcountynv.webex.com/clarkcountynv/j.php?MTID=m79920c61385ea3581420ce1ac321365e To join by phone Dial: 1-408-418-9388 Meeting/Access Code: 2482 273 9941

Dates

Start Date

01 Nov, 2022 (3 months ago)

Due Date

01 Dec, 2022 (2 months ago)

You may also like

Main Building Generator Switch Gear Replacement

Due: 09 Feb, 2023 (Tomorrow)Agency: State Engineer

Fire Station 10 Lighting Retrofit

Due: 09 Feb, 2023 (Tomorrow)Agency: City of Madison

AMTEK COMPANY

Due: 01 Jan, 2027 (in about 3 years)Agency: AMTEK COMPANY, INC.

Location

Country : United StatesState : Nevada