The Government anticipates that these projects are to be awarded this Fiscal Year, and are anticipated to have a rough order of magnitude in excess of $10M each. The project includes an enclosed DoD Type III hydrant fueling pump house with control room, two aboveground 10,000 barrel operating storage tanks, filter building, distribution piping to existing loop, a new product recovery tank, extension of a fuel transfer line and associated site work.Please complete and return the attached spreadsheet to the POCs below NOT LATER THAN 16 DEC