RFP 2024-01 - Ceiling Baffles Central Office

expired opportunity(Expired)
From: New Canaan(Town)

Basic Details

started - 08 Mar, 2024 (1 month ago)

Start Date

08 Mar, 2024 (1 month ago)
due - 01 Apr, 2024 (27 days ago)

Due Date

01 Apr, 2024 (27 days ago)
Bid Notification

Type

Bid Notification

Identifier

N/A
Town Of New Canaan

Customer / Agency

Town Of New Canaan
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

1 NEW CANAAN PUBLIC SCHOOLS 220 ELM STREET NEW CANAAN, CT 06840 203-594-4000 SPECIFICATION COVER SHEET REQUEST FOR PROPOSAL #2024-01 CEILING BAFFLES – CENTRAL OFFICE VENDOR MUST ENCLOSE THREE COPIES OF THIS SPECIFICATION COVER SHEET and THREE COPIES OF THE SPECIFICATIONS PRICING SHEETS WHEN RESPONDING TO THIS REQUEST FOR PROPOSAL (RFP) The NEW CANAAN PUBLIC SCHOOLS reserves the right in its sole discretion to reject any and all proposals, or separate parts thereof, requested herein before. When items are mentioned by a particular brand, substitution of equal quality items will be considered only if the proposed substitution is clearly stated. When a vendor fails to so identify a proposed substitution, it will be assumed that he is proposing the exact item requested. The NEW CANAAN PUBLIC SCHOOLS is exempt from the payment of Federal Excise Taxes and Connecticut Sales and Use Tax according to State Statute. Such taxes must not be included in bid prices nor added to any items specified.
INSTRUCTIONS ON RFP DEADLINES AND REQUIREMENTS: NAME OF RFP: Ceiling Baffles – Central Office TYPE OF RFP: Sealed Proposal RFP #: 2024-01 RFP CLOSURE DATE: Received Until: DATE: April 1, 2024 TIME: 1:00 PM LOCATION TO FORWARD RFPs: Sean O’Keefe, Director of Finance and Operations NEW CANAAN PUBLIC SCHOOLS 220 ELM STREET NEW CANAAN, CT 06840 RFP SECURITY: RFP Security Required __10____% RFP Security Not Required PREVAILING WAGE: Required _______ Not Required _____X____ FORMS TO COMPLETE RFP: Submit three copies of all required documentation in a sealed envelope. Identify Name of RFP on Envelope: RFP # 2024-01 Ceiling Baffles – Central Office. Only fully completed RFP packages will be accepted. The following details describe fully completed RFP packages: Base Proposal  Proposal Sheet  Schedule of Project: Schedule of installation, completion and inspection  Appendix A – Insurance Procedure Form 2 NEW CANAAN PUBLIC SCHOOLS INVITATION TO SUBMIT PROPOSAL New Canaan Public Schools (NCPS) invites proposals from qualified companies for Ceiling Baffles – Central Office. Sealed proposals will be received at the New Canaan Public Schools, 220 Elm Street, New Canaan, CT 06840 until April 1, 2024 at 1:00 pm, EST, at which time they will be opened publicly and read aloud. The contractor selected for the above project(s) shall be required to enter into a contract with the NCPS. Such contract shall require the posting of performance and payment bonds, the submittal of insurance certificates and the compliance with Federal, State and Local Laws and ordinances. Proposal surety in the form of a bank check, bid bond or certified check in the amount of ten percent (10%) of the total RFP price must be submitted with each proposal. The Request for Proposal (RFP) is available online at www.ncps-k12.org. Three (3) copies of the submitted qualifications and proposals are to be placed in a sealed envelope and addressed to Sean O’Keefe, Director of Finance & Operations, New Canaan Public Schools, 220 Elm Street, New Canaan, CT 06840. No proposals will be accepted after the date and time specified. No fax or email submissions will be accepted. The New Canaan Public Schools reserves the right in its sole discretion to accept or reject, without prejudice, any or all proposals or to waive any irregularities therein, or to accept the proposal deemed to be in the best interest of New Canaan Public Schools. Sean O’Keefe, Director of Finance and Operations New Canaan Public Schools 3 PROJECT START DATE SHALL BE DISCUSSED AT MANDATORY WALK THROUGH ON MARCH 18, 2024. By signing this document, I acknowledge I have read and understand the RFP requirement of this RFP specification included for my review herein: ________________________________________________________________________________________ Signature of Company Representative Date TYPED NAME AND TITLE:_______________________________________________________________________ COMPANY:___________________________________________________________________ ADDRESS:_____________________________________________________________________ TOWN:_______________________________________STATE:__________ ZIP:____________ TELEPHONE NUMBER:_____________________________ FAX:__________________________ CELL NUMBER:____________________________________ EMAIL ADDRESS: (Please print clearly or attach business card): ____________________________________________________ 4 NEW CANAAN PUBLIC SCHOOLS Sean O’Keefe Office of Director of Finance and Operations 220 ELM STREET NEW CANAAN, CT 06840 203-594-4025 REQUEST FOR PROPOSAL RFP #2024-01 Ceiling Baffles – Central Office Notice is hereby given that sealed RFPs on the following will be received at the Office of the Director of Finance and Operations until: 1:00 pm, April 1, 2024 at which time they will be publicly opened and read aloud: RFP #2024-01 Ceiling Baffles – Central Office Specifications are attached. The Board of Education reserves the right in its’ sole discretion to reject any and all proposals, or any part thereof, to waive defects in the same, or to accept any proposal it deems to be in the best interest of the Board of Education and/or the Town of New Canaan. Questions regarding this bid should be directed to the architect, Ryan Salvatore, AIA, at (203) 326-1320. 5 NEW CANAAN PUBLIC SCHOOLS REQUEST FOR PROPOSALS Contractor Services Associated with: CEILING BAFFLES – CENTRAL OFFICE NEW CANAAN, CT GENERAL New Canaan Public Schools (NCPS) solicits proposals from LICENSED CONTRACTORS to perform CEILING BAFFLES - CENTRAL OFFICE, 220 Elm Street, New Canaan, CT 06840. Furnish all materials, equipment, and labor related to project drawings and specifications. Work is to be scheduled as stated on top of page 3. SCOPE OF WORK The scope of work, without limiting the generality thereof, consists of furnishing all labor, material, equipment and proof of insurance required and necessary to complete the project as indicated on the drawings and as specified. PROPOSAL AND SUBMITTAL PROVISIONS Proposal price is to be complete turnkey price. THE PROPOSALS SHALL INCLUDE: 1. Vendors will submit three (3) sets of their sealed proposal on enclosed PROPOSAL SHEET. 2. Vendors will submit three (3) sets of their qualifications to include: a. A firm background or profile b. A statement of experience c. A statement of staff availability with their experiences and backgrounds. (Ensure that the Project Manager assigned to the job has knowledge of this proposal and is qualified by the membrane manufacturers to direct the effort.) d. A list of any and all proposed subcontractors to be utilized on the project. e. A projected time schedule of the work. It is expected that the work will be completed by To Be Announced. 3. Project security payable to the New Canaan Public Schools in the form of a certified check or bid bond is required for ten percent (10%) of the amount bid, issued by an acceptable surety on AIA document A311 or comparable legal bond form, and must accompany each proposal. 4. The successful vendor shall provide using AIA documentation forms for the following; Contract, Performance, and Payment bond within ten days of notification of project award. 5. Vendors must include their standard contract with bid proposal. Vendor standard contract is subject to review and revision by New Canaan Public Schools. 6. The successful Contractor shall be required to provide a one (1) year contractor’s labor and materials warranty. 6 SUBMISSION REQUIREMENTS Respondents shall submit three (3) sets of their proposal. Proposals will be received at New Canaan Public Schools, 220 Elm Street, New Canaan, CT 06840, ATTN: Sean O’Keefe, Director of Finance & Operations, until April 1, 2024, 1:00 pm, at which time they will be opened and publicly read aloud. No fax or email submissions will be accepted. Sean O’Keefe Director of Finance & Operations New Canaan Public Schools 220 Elm Street New Canaan, CT 06840 Questions regarding this RFP may be directed to the architect, Ryan Salvatore, AIA, at (203) 326-1320. A mandatory Pre-Bid Meeting is scheduled for Monday, March 18, 2024 at 11:00 AM at Central Office, 220 Elm Street, New Canaan, CT. All proposals must be signed by an Officer of the Company. The following items are attached: Terms and Conditions Proposal Sheet 7 SPECIFICATIONS RFP #2024-01 CEILING BAFFLES – CENTRAL OFFICE Due on or before April 1, 2024, 1:00 pm at the office of: Sean O’Keefe Director of Finance and Operations NEW CANAAN PUBLIC SCHOOLS 220 ELM STREET NEW CANAAN, CT 06840 Sealed proposals will be received by the Business Department of the New Canaan PUBLIC SCHOOLS of the Town of New Canaan, Connecticut until April 1, 2024, 1:00 pm. Each proposal should be clearly marked (example) "RFP #2024-01 – CEILING BAFFLES – CENTRAL OFFICE". Specifications, instructions and proposal forms may be obtained at the above address. Faxed copies of the proposal will not be accepted. CONDITIONS FOR SUBMITTING PROPOSALS 1. The Board of Education reserves the right in its absolute and sole discretion to reject any proposal if it is deemed to be in the best interests of the Town of New Canaan, Connecticut, New Canaan Public Schools and its students. 2. The Board of Education reserves the right to grant an award in total or for any part thereof for the items or services being proposed. In addition, the Board of Education reserves the right to award this project as a package in conjunction with other proposals for similar services/supplies/equipment. The Board reserves the right to award with preference to State of Connecticut contract holders and/or local vendors. 3. The submission of a proposal shall be conclusive evidence that the vendor can satisfactorily fulfill all requirements of the RFP specifications and any controlling conditions which may exist. 4. Vendors may not withdraw their proposal for a period of 120 days from the date of RFP opening. The Board of Education and the vendor may mutually agree to extend the time limit. 5. In determining the ranking of responsible vendors, the Board of Education may consider, in addition to price, the quality, availability and type of items, the experience of the vendor, the sufficiency of the financial resources of the vendor and the reputation of the vendor for ability, integrity, judgment and performance, as well as the ability of the vendor to provide future service/supplies/equipment. 6. It is anticipated that the goods will be needed for the current school year, but the Board of Education reserves the right to cancel or alter this service because of enrollment changes, budget consideration or unforeseen circumstances which require a change. 8 7. All responses prices are to include the complete costs, which includes inside delivery to each school or location with installation and assembly of same, if applicable, and training, if applicable. All deliveries must be made prepaid and must be delivered to the location subsequently designated on the purchase orders at no cost over and above the bid price indicated in your proposal. Deliveries must be made inside building indicated. In no case will collect shipments or sidewalk deliveries be accepted. A packing slip shall be included in each shipment. All packages must be clearly marked as to content. 8. The Board of Education of the Town of New Canaan supports efforts to reduce the use of illegal drugs in the workplace. In instances where responsible prospective bidders submit identical tie bids, preference shall be given to the businesses with drug-free workplace programs. Whenever two or more proposals which are equal with respect to price, quality, and service are received by the Board of Education for the procurement of commodities or contractual services which are proposed, a proposal received from a business which has certified that it has implemented a drug- free workplace program shall be given preference in the award process. The drug-free workplace program certification is attached and is to be submitted with the proposal package by the vendor along with other proposal documents in order to receive preference. This policy shall become effective in accordance with the provisions of the Charter of the Town of New Canaan regarding proposal procedures. 9. ALTERNATIVES: When proposing an alternate item, indicate the Brand and Model identification on the specification sheets. To have alternates considered, complete specifications must be provided and catalogues describing the product must accompany the bid. The New Canaan Public Schools reserves the right to request equipment samples on specific items. 10. SUBSTITUTIONS: No substitutions The New Canaan Public Schools reserves the right to request equipment samples on specific items. 11. FORM AND STYLE OF PROPOSAL: All blanks on the Proposal Sheet, except where otherwise requested, shall be filled in by typewriter or manually in ink and must be completely legible. 12. WARRANTIES: Whenever an item or service is covered by a specified product or service warranty, such warranties must be submitted with the official proposal or quotation specification sheets. All such warranties shall inure to the benefit of the Board. 13. INSURANCE REQUIREMENTS: The successful vendor will be required to purchase from and maintain, for the life of the contract and the terms of the contract, from a company or companies with an A.M/Best rating of A- (VII) or better, such insurance as will protect and indemnify the Town of New Canaan and the Board of Education from claims set forth below which may arise out of or result from the vendor’s obligation and performance under the Contract, whether such obligation is the vendor’s or a subcontractor or any person or entity directly or indirectly employed by them. 14. WORKER’S COMPENSATION: Vendor shall purchase statutory workers compensation insurance required by law with employer’s liability limits for at least the amounts of liability for bodily injury by accident of $500,000 each accident and bodily injury by disease of $500,000. 9 15. Commercial General Liability Insurance: Vendor shall obtain and provide proof of commercial general liability insurance policy with an edition of 1986 or later including products and complete operations. Limits should be at least: Bodily injury and property with an occurrence limit of $1,000,000; Personal & advertising injury limit of $1,000,000 per occurrence; General aggregate limit of $2,000,000 (other than products and completed operations); Products and completed operations aggregate limit of $2,000,000.  The policy shall name the Town and the New Canaan Public Schools as an additional insured and include ISO Form CG2010 (07/04) and CG 2037 (07/04).  Such coverage will be provided on an occurrence basis, and will be primary, and shall not contribute in any way to any insurance or self-insured retention carried by the Board of Education and the Town of New Canaan.  All policies shall contain a waiver of subrogation in favor of the Town of New Canaan and the Board of Education, including worker’s compensation.  Such coverage shall contain a broad form contractual liability endorsement or wording within the policy form to comply with the hold harmless and indemnity provision of the contract.  A per project aggregate limit of liability endorsement shall apply for any construction contract.  Deductible and self-insured retentions shall be declared and are subject to approval by the Board of Education. 16. Commercial Automobile Insurance: Vendor shall provide commercial automobile insurance for any leased, non-owned and owned autos (symbol 1 or equivalent) in the amount of $1,000,000 each accident covering bodily injury and property damage on a combined single limit basis. Such coverage shall also include hired and non-owned automobile coverage. Policy shall name the Town of New Canaan and the Board of Education as an additional insured. 17. Umbrella Liability Insurance: Vendor shall provide an umbrella or excess liability policy (without restriction or limitation). Such policy shall contain limits of liability in the amount of $5,000,000 each occurrence and $5,000,000 in the aggregate. As to the insurance required, the insurer(s) and/or their authorized agents shall provide the Board of Education certificates of insurance prior to execution of the agreement by the Board of Education describing said coverage. 18. All policies shall be primary and non-contributory. All policies, except workers compensation, require the Town of New Canaan and the Board of Education as additional insureds. 19. Any contractors/subcontractors engaged by vendor are subject to these same insurance requirements. 20. The awarded vendor and any contractors/subcontractors engaged by vendor must complete a background check, the cost of which is covered by New Canaan Public Schools. Forms are included in Appendix B. 10 21. QUESTIONS: For questions regarding the proposal process, contact Sean O’Keefe, Director of Finance and Operations, at (203) 594-4025. For questions regarding the project, contact the architect, Ryan Salvatore, AIA, at (203) 326-1320. NOTE: By submitting a proposal for this contract the vendor agrees that any or all past clients may be contacted by the New Canaan School District. The vendors quoting on this contract also agree, to the fullest extent permitted by law, to hold harmless, release and discharge by quoting on this contract for the vendor him/herself, his/her heirs executors administrators and assigns, release acquit and forever discharge the Town of New Canaan and the New Canaan School System, its Board of Education and all employees and any or all other persons, firms and corporations of and from and against any and all actions, causes of actions, claims or demands for damages, costs, loss of services, expenses, compensation, consequential damage or any other thing whatsoever, on account of, or in any way growing out of any former client contacted by the New Canaan School System to obtain an opinion regarding any work performed by your company. The above release shall also include and apply to any former client contacted, to the fullest extent permitted by law. 11 TERMS AND CONDITIONS THIS IS A REQUEST FOR PROPOSALS AND THE NEW CANAAN PUBLIC SCHOOLS RESERVES THE RIGHT IN ITS SOLE DISCRETION TO NEGOTIATE AND CONTRACT WITH ANYONE OR NO ONE IN THE BEST INTERESTS OF THE TOWN. NCPS RESERVES THE RIGHT TO AWARD ONE, TWO, OR ALL OF THE PROJECTS TO THE SAME CONTRACTOR. Unless otherwise modified, the following terms and conditions will apply to services rendered. The respondent may use a standard form of agreement incorporating the following provisions. Services to be Provided The winning vendor shall provide services as set forth in the RFP and in accordance with the terms identified herein. The services provided will be performed on behalf of and solely for the New Canaan Public Schools and any information, tests, reports, correspondence, and conclusions shall not be released to other parties unless authorized by NCPS or in accordance with any applicable state or federal law. Billing and Payment New Canaan Public Schools will pay the winning vendor for services performed in accordance with the signed Agreement. Invoices will be submitted periodically or upon completion of services rendered. The Town reserves the right to request substantiating information on any bill submitted. The Town will, within 30 days after receipt of an invoice requesting payment, and with the approval of the Town, indicate the approval of payment and process the invoice or indicate to the winning vendor in writing, the reason for refusing to approve said invoice. In the latter case, the winning vendor will make the necessary corrections and resubmit the invoice. Court Litigation and Waiver of Jury Trial Notwithstanding the existence of any provision for arbitration of disputes in the contract or any legislation providing for arbitration, any dispute arising under this contract shall not be submitted to arbitration and the parties shall be left to the remedies at law. It is further expressly agreed that both parties waive and relinquish their right to a trial by jury of any dispute arising out of this contract. The intent of the parties is not to have a jury decide any aspect of any dispute which may arise under this contract. Mediation All claims, disputes or other matters in question between the parties to this Agreement arising out of or relating to this Agreement or breach thereof shall be submitted to non-binding mediation. On the written notice of either party to the other of the election to submit any dispute under this Agreement to mediation, each party shall designate its representative and shall meet at the New Canaan Town Hall within ten (10) days after the service of notice. The parties themselves shall then attempt to resolve the dispute within ten (10) days of meeting. Should the parties themselves be unable to agree on a resolution of this dispute, then the parties shall appoint a third party, who shall be a competent and impartial party and who shall be acceptable to each party, to mediate the dispute. Each party shall pay the fees and expenses of the party mediator and such costs shall be borne equally by both parties. Upon agreement of the parties, either party may waive the first step in the mediation process and appoint a mutually acceptable mediator. 12 Any third party mediator designated to serve in accordance with the provisions of the Agreement shall be disinterested and shall be qualified to evaluate the performance of both parties. This process shall be considered as a condition precedent to moving to court. Equitable Relief Nothing herein shall prevent either party from obtaining a court order enforcing the mediation process or such other temporary or equitable relief until such time that the dispute is settled or finally adjudicated. 13 PROPOSAL SHEET NEW CANAAN PUBLIC SCHOOLS CEILING BAFFLES – CENTRAL OFFICE NEW CANAAN, CT Having carefully examined the Instructions to Vendors, Equipment / Material Specifications, Scope of Work, Standard Bid/RFP and Contract Terms and Conditions, the site(s) where the work is to be performed, all applicable legal requirements and having made such independent investigations as the respondent deemed necessary, the undersigned hereby submits a proposal to perform the Ceiling Baffles – Central Office. In submitting this proposal, the vendor represents that this proposal will remain effective for one hundred twenty (120) days following the proposal due date. A. Project Cost and Construction Administration: For providing all work, labor, materials, equipment, transportation, insurance and all else whatsoever required to completely finish all work in connection with the project: Ceiling Baffles – Central Office BASE BID Written Amount: $ ____ ALTERNATE NO. 1 – Perform work during Written Amount: $ ___ normal hours during summer of 2024 Please attach your proposal to this form. If awarded this contract, we will execute an AIA contract with New Canaan Public Schools, Owner of the properties. *Prices given are the final price to the Owner and include all permits, fees, overhead and profit of the Vendor. Company Name: _______________________________________________________________ Address: _______________________________________________________________ Email: __________________________________ Phone: _______________________ Name: __________________________________ Title: ________________________ Signature: __________________________________ Date: ________________________ 14 DRUG-FREE WORKPLACE CERTIFICATE I hereby certify that this company: 1. Has a published statement notifying employees that the unlawful manufacture, distribution, dispensing, possession, or use of a controlled substance is prohibited in the workplace and that this statement specifies the actions which will be taken against employees for violations of such prohibition. 2. Has a written policy informing employees about the dangers of drug abuse in the workplace, the firm’s policy of maintaining a drug free workplace, any available counseling, rehabilitation, and employee assistance programs, and the penalties which may be imposed upon employees for drug abuse violations. 3. Each employee engaged in providing the commodities or contractual services which are being bid was given a copy of the statements specified in paragraphs 1 and 2, above. 4. In the statement specified in paragraph 1, the employees have been notified that, as a condition of working on the commodities or contractual services which are under bid, the employee will abide by the terms of the statement and will notify the employer of any conviction of, or plea of “guilty” or of “nolo contendere” to any violation of any controlled substance law of the United States or of any state, for a violation occurring in the workplace no later than five (5) days after such conviction or plea. 5. This firm will impose a sanction on or require the satisfactory participation in a drug abuse assistance program or a rehabilitation program, if such are available in the employee’s community, by any employee who is so convicted. 6. This firm will make a good faith effort to continue to maintain a drug free workplace. As the person authorized to sign this statement, I certify that this firm fully complies with the above requirements. Signature: ____________________________________ Date: _________________________ Print Name: ___________________________________ Company: ____________________________________ DrugFreeWkplaceCert (forms) 15 Appendix A INSURANCE PROCEDURE NEW CANAAN PUBLIC SCHOOLS NEW CANAAN, CT PLEASE NOTE: RETURN THIS COMPLETED FORM WITH YOUR PROPOSAL. FAILURE TO DO SO MAY RESULT IN YOUR PROPOSAL BEING REJECTED. Please take the insurance requirements of the PROPOSAL to your agent/broker immediately upon receipt of the RFP documents to determine your existing coverage and any costs for new or additional coverage required for the work noted in RFP. Any PROPOSALS’s that contain exceptions to the insurance requirements may be considered non-responsive and may be rejected. STATEMENT OF VENDOR: I have read the insurance requirements for this work and have taken the documentation to my insurance agent/broker. BID/RFP cost reflects any additional costs relating to insurance requirements for this work. If I am awarded this CONTRACT, I or my insurance agent shall submit all of the required insurance documentation and a certificate of insurance to NEW CANAAN PUBLIC SCHOOLS Business Office within ten (10) days after the date of the award. ________________________________________ ___________________________ Signature Date _________________________________________ Print Vendor Name 16 Appendix B BACKGROUND CHECK FORMS Connecticut Department of Children and Families AUTHORIZATION FOR DCF CPS BACKGROUND CHECK (Central Registry Only) DCF-3031 7/2022 (Rev.) Page 1 of 1 I, (Applicant Name): _______________________________________________ do hereby authorize the Department of Children and Families to research its records and if applicable request out of state checks, to determine whether or not I am on the central registry of persons responsible for child abuse and neglect. I understand that this information may be used to determine my suitability for (check one): ☐Employment ☐ Day Care ☐ Volunteer ☐ Intern ☐ Mentor ☐ Other I release the Department of Children and Families from any liability for any damages I may incur because of the release/use of this information. Name of Agency (requesting background check) Attention: Address: (No. and Street): City: State: Zip: I submit the following information to assist the Department of Children and Families in their search. Applicant Last Name: Applicant First Name: Middle: DOB: Applicant Address: (No. and Street): Apt. # City: State: Zip: Start date at current address: (mm/dd/yyyy) List all previous applicant addresses for the last five years Check if an additional sheet is necessary, and attached Address (No. and Street): Apt. # City: State: Zip: Dates From: (mm/dd/yyyy) To (mm/dd/yyyy) Other names I have used (including preferred names, maiden, and previous marriages) Check if an additional sheet is necessary, and attached Last Name: First Name: Middle Name: Names of ALL children - biological/step (Including adult children in or out of the home) Check if an additional sheet is necessary, and attached Last Name: First Name: Middle: DOB: Gender: Female Male Other Female Male Other Female Male Other This authorization will expire 180 days after the date of the signature Applicant Signature: Date: Submit at https://portal.dcf.ct.gov/Portal/Main/#dashboard. To enroll your agency in the portal, please contact bgc.verification@ct.gov. For questions or support, please contact the Background Check Unit at bgc.verification@ct.gov. 17 815 Boston Post Road, Second Floor Darien, Connecticut 06820 NEW CANAAN PUBLIC SCHOOLS New Canaan, Connecticut BSA Project No. 22-002 Revised February 27,2024 CEILING MODIFICATION SCOPE I. INTRODUCTION Certain areas of the administrative offices of New Canaan Public Schools, located at 220 Elm Street in New Canaan, are fitted with ceiling grid and grid-mounted light fixtures. The grid is not fitted with ceiling tiles. The intention of this scope narrative is to replace the existing open-grid installation with a ceiling baffle system. The scope of work is limited to only those areas fitted with the open-grid installation. II. DOCUMENTS The following documents describe the scope: 1. Ceiling Modification Scope dated February 27, 2024. In the event of a conflict between this document and the drawings, this document shall supersede; 2. Sheet A-110 (Reflected Ceiling Plan) prepared by Burr Salvatore Architects and dated February 21, 2023; 3. Sheet A-600 prepared by Burr Salvatore Architects and dated February 21, 2023, with specific reference to detail 6 (PARTIAL PLAN CUT AT OFFICE SOFFIT - DETAIL AT BAFFLES) and detail 7 (PARTIAL PLAN CUT AT CORRIDOR SOFFIT - DETAIL AT BAFFLES); 4. Sheet A-601 prepared by Burr Salvatore Architects and dated February 21, 2023 with specific reference to detail 9 (TYPE G - SOFFIT WITH GLASS). 5. Sheet A-704 prepared by Burr Salvatore Architects and dated February 21, 2023, with specific reference to detail 3 (Pantry – East) and detail 4 (Pantry – West) as representative of typical baffle conditions applicable throughout similar spaces. 6. Sheet E-200 prepared by B2R Consulting Engineers and dated November 15, 2022; 7. Sheets FP-100 and FP-301 prepared by B2R Consulting Engineers and dated November 15, 2022. Please note that all of these drawings were prepared in connection with the initial fit-out of the space. That work has been done and this ceiling work, while documented, was edited from the scope. The Contractor shall familiarize her- or himself with all field conditions that may deviate from the conditions documented. It is clear that the baffle height proposed in the design drawings will need to be lower than that specified given clearance to ducts in the space. III. SCOPE NARRATIVE 1. General Conditions. a. All work must be performed after normal work hours of 8:00 AM to 5:00 PM and/or on weekends. Access via building common areas may not impede or otherwise affect building tenants during normal work hours of 8:00 AM to 5:00 PM, and all spaces in which access is provided or work is conducted must be restored to their condition prior to usage of such spaces. b. Protect existing spaces as required to prevent damage and to ensure they can be restored to their current conditions by the start of business on the business day next following the day on which work is conducted. 2. Demolition: 18 bryanluizzi Highlight 815 Boston Post Road, Second Floor Darien, Connecticut 06820 a. Demolish all existing grid-installed lighting and ceiling grid in areas at which open grid is installed. Remove support wires or other elements of those installations. b. Temporarily support any other grid-mounted items (Wifi receptors or the like). 3. Paint a. Patch all soffits or walls to which grid had been anchored. b. Paint all soffits or walls to which patches are conducted. The Contractor shall take measures to ensure that touch-ups are not perceptible as such when the work is complete. 4. Lighting: a. Supply and install downlights where denoted on the attached drawings. The downlight specification follows: MANUFACTURER: Contech Lighting PRODUCT: TDL905 Eclipse Curve Flexible Cable Luminaires PRODUCT NO.: CTL CTL9053MCF3CD-B CHORD LENGTHS: As required to sit flush with bottom of baffles COLOR / FINISH: B - Black Existing switching and programming shall be maintained; interconnect new lights with existing switches and programming as required. b. Re-mount any non-lighting devices currently mounted to the grid (eg. Wifi receptors, alarm devices). Provide support structures as required. 5. Sprinkler a. Assess the current sprinkler installation to confirm whether vertical heads were installed. Ensure sprinkler coverage is provided in accordance with the enclosed drawings. b. Provide sprinkler shop drawings for submission to the fire marshal’s office. 6. Baffles a. Supply and install the baffles as indicated in the drawings, per the specification below, and in accordance with the manufacturer’s installation guidelines: MANUFACTURER: United State Gypsum PRODUCT: Paraline Baffles Linear Ceiling & Wall System LENGTHS: As documented on the drawings COLOR / FINISH: Timbre Maple 4010 b. Note that the baffles will need to be lower than indicated in the design drawings. In addition, baffles along the South side of the space, proximate to the Pantry, will be at a different level than the typical baffle underside elsewhere; the Contractor shall transition between the two elevations with a graduated drop of baffles. IV. ADDITIONAL INFORMATION Should additional information be required, please contact the architect: Ryan Salvatore, AIA Burr Salvatore Architects T (203) 326-1320 E r.salvatore@burrsalvatore.com 19 815 Boston Post Road, Second Floor Darien, Connecticut 06820 End of Ceiling Modification Scope 20 K-2035-8PINOIRLAVATORYVITREOUS CHINA COMPUTER STATION K-2035-8PINOIRLAVATORYVITREOUS CHINAK-2035-8PINOIRLAVATORYVITREOUS CHINA K-2035-8PINOIRLAVATORYVITREOUS CHINA DRYER K-2035-8PINOIRLAVATORYVITREOUS CHINA BA N Q U ET TE WASHER K-2035-8PINOIRLAVATORYVITREOUS CHINA POCKET DOOR POCKET DOOR BA N Q U ET TE ENTRY VESTIBULE 100 LOBBY 101 PRINCIPAL HALLWAY 102 TECHNOLOGY WORK AREA 105 TECH. DIRECTOR'S OFFICE 104 RECEPTION 103 FINANCE WORK AREA 107 NEW MOTHER ROOM 108FACILITIES DIRECTOR'S OFFICE 110 BUDGET DIRECTOR'S OFFICE 111 FINANCE/FACILITIES ASST. OFFICE 112 FINANCE & ADMINISTRATOR DIRECTOR'S OFFICE 113 HUMAN RESOURCES DIRECTOR'S OFFICE 114 ASSISTANT SUPERINTENDENT'S OFFICE 115 SUPERINTENDENT'S OFFICE 118 DEPUTY SUPERINTENDENT'S OFFICE 119 SOCIAL WORKER'S OFFICE 120 OUTREACH OFFICE 121 TRANSPORT. DIRECTOR'S OFFICE 122 PANTRY 123 HIGH SCHOOL CLASSROOM 124 HIGH SCHOOL LOUNGE 125 HIGH SCHOOL FORUM 126 HIGH SCHOOL WORK ROOM 127 HIGH SCHOOL ENTRY 128 INSTRUCTIONAL PANTRY 133 WEST BATH HALL 130 WEST MENS' BATH 131 WEST LADIES' BATH 132 LOCKER ROOM CLOSET 135 NORTH WEST BATH HALL 136 NORTH WEST BATH 137 LAUNCH PROGRAM ROOM 140 LAUNCH HALL 141 LAUNCH GATHERING ROOM 142 TELEPHONE CLOSET 147 MECHANICAL ROOM 146 LADIE'S BATH 144 MEN'S BATH 143 ENTRY CORRIDOR 145 CONFERENCE ROOM 109 LAUNCH PROGRAM ROOM CLOSET 139 LAUNCH PROGRAM ROOM ELECTRICAL 138 PRINCIPAL HALLWAY 102 PRINCIPAL HALLWAY 102 HIGH SCHOOL ENTRY CLOSET 129 LOCKER ROOM 134 WEST ENTRY 150 WEST PORCH 149 NORTH PORCH 148 SOUTH PORCH 152 SOUT WEST PORCH 151 CHECK PRINTER CLOSET 153 EX IS TI N G B AN K FI LE S TO R AG E SY ST EM COPY / FILE R EC EPTIO N SHELVESSHELVES SHELVES M AI LB O XE S SHELVESSHELVES SHELVES SHELVESSHELVES SHELVES SHELVES SHELVES SHELVES SHELVES PRINT STATION PRINT STATION COPY/FILE ROOM 117 ASSISTANTS' WORK AREA 116 HUMAN RESOURCES WORK AREA 106 K-2035-8PINOIRLAVATORYVITREOUS CHINA 26X18 RETURN RISER 30X20 SUPPLY RISER 26X18 RETURN RISER 30X20 SUPPLY RISER SH AL LO W C O U N TE R 21 3 3.4 4 4.4 5 5.1 6 7 8 A C B D E F H G A C B D E F H G 21 3 3.4 4 4.4 5 5.1 6 7 8 EX EX EX A A AA A A A A A P P S S S S S S AA A A A A AA ACT CEILING 9'-0" +/- AFF PAINTED EXPOSED SLAB WITH BAFFLES PAINTED EXPOSED SLAB WITH BAFFLES PAINTED EXPOSED SLAB WITH BAFFLES PAINTED EXPOSED SLAB WITH BAFFLES PAINTED EXPOSED SLAB WITH BAFFLES ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF SOFFIT AT 8'-11" SOFFIT AT 9'-11" SOFFIT AT 8'-11" SOFFIT AT 8'-11" SOFFIT AT 8'-11"SOFFIT AT 9'-11" SOFFIT AT 8'-11" SOFFIT AT 9'-11" PAINTED GWB AT 8'-0" AFF PAINTED GWB AT 8'-0" AFF PAINTED GWB AT 8'-0" AFF PAINTED GWB AT 8'-0" AFF PAINTED GWB AT 8'-0" AFF PAINTED GWB AT 8'-0" AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF A A P P P P CCCCCCCCCCC C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C CCCCCCCC CCC C CCC CCCCCC C C C C C C C A A A AAA A A A A A A A A A A A A A P A A A AAA LF -1 LF -1 LF -1 LF -1 LF -1 LF -1 LF -1 LF -1 LF -1 LF -1 LF -1 LF -1 LIGHTING NOTES: SEQUENCE OF OPERATIONS: No. ISSUE Project No. Drawing No. BURR SALVATORE ARCHITECTS 815 BOSTON POST ROAD DARIEN, CONNECTICUT 06820 TEL. (203) 655-0303 KEY PLAN A B C D E F G H I J K L 1 2 3 4 5 6 7 8 9 10 11 12 DATE A B C D E F G H I J K L Copyright (c) 2022 Burr Salvatore Architects 1 2 3 4 5 6 7 8 9 10 11 12 NEW CANAAN PUBLIC SCHOOLS 220 ELM STREET, NEW CANAAN, CONNECTICUT THIS DOCUMENT AND THE IDEAS AND DESIGN INCORPORATED HEREIN IS AN INSTRUMENT OF PROFESSIONAL SERVICE AND THE PROPERTY OF BURR SALVATORE ARCHITECTS, PLLC, AND IS NOT TO BE USED IN WHOLE OR IN PART FOR ANY EXTENSION OF THIS PROJECT OR FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF BURR SALVATORE ARCHITECTS, PLLC. - ISSUE FOR PRICING 11/15/2022 Drawn by: Scale: B2R22049 Checked by: 2777 Summer Street Suite 606 Stamford, CT 06905 (203) 548-9939 E-200 ELECTRICAL FIRST FLOOR LIGHTING PLAN MV JB 1/4"=1'-0" E200, 11/15/2022 4:53:07 PM, Alvin Averion K-2035-8PINOIRLAVATORYVITREOUS CHINA COMPUTER STATION K-2035-8PINOIRLAVATORYVITREOUS CHINAK-2035-8PINOIRLAVATORYVITREOUS CHINA K-2035-8PINOIRLAVATORYVITREOUS CHINA DRYER K-2035-8PINOIRLAVATORYVITREOUS CHINA BA N Q U ET TE WASHER K-2035-8PINOIRLAVATORYVITREOUS CHINA POCKET DOOR POCKET DOOR BA N Q U ET TE ENTRY VESTIBULE 100 LOBBY 101 PRINCIPAL HALLWAY 102 TECHNOLOGY WORK AREA 105 TECH. DIRECTOR'S OFFICE 104 RECEPTION 103 FINANCE WORK AREA 107 NEW MOTHER ROOM 108FACILITIES DIRECTOR'S OFFICE 110 BUDGET DIRECTOR'S OFFICE 111 FINANCE/FACILITIES ASST. OFFICE 112 FINANCE & ADMINISTRATOR DIRECTOR'S OFFICE 113 HUMAN RESOURCES DIRECTOR'S OFFICE 114 ASSISTANT SUPERINTENDENT'S OFFICE 115 SUPERINTENDENT'S OFFICE 118 DEPUTY SUPERINTENDENT'S OFFICE 119 SOCIAL WORKER'S OFFICE 120 OUTREACH OFFICE 121 TRANSPORT. DIRECTOR'S OFFICE 122 PANTRY 123 HIGH SCHOOL CLASSROOM 124 HIGH SCHOOL LOUNGE 125 HIGH SCHOOL FORUM 126 HIGH SCHOOL WORK ROOM 127 HIGH SCHOOL ENTRY 128 INSTRUCTIONAL PANTRY 133 WEST BATH HALL 130 WEST MENS' BATH 131 WEST LADIES' BATH 132 LOCKER ROOM CLOSET 135 NORTH WEST BATH HALL 136 NORTH WEST BATH 137 LAUNCH PROGRAM ROOM 140 LAUNCH HALL 141 LAUNCH GATHERING ROOM 142 TELEPHONE CLOSET 147 MECHANICAL ROOM 146 LADIE'S BATH 144 MEN'S BATH 143 ENTRY CORRIDOR 145 CONFERENCE ROOM 109 LAUNCH PROGRAM ROOM CLOSET 139 LAUNCH PROGRAM ROOM ELECTRICAL 138 PRINCIPAL HALLWAY 102 PRINCIPAL HALLWAY 102 HIGH SCHOOL ENTRY CLOSET 129 LOCKER ROOM 134 WEST ENTRY 150 WEST PORCH 149 NORTH PORCH 148 SOUTH PORCH 152 SOUT WEST PORCH 151 CHECK PRINTER CLOSET 153 EX IS TI N G B AN K FI LE S TO R AG E SY ST EM COPY / FILE R EC EPTIO N M AI LB O XE S COPY/FILE ROOM 117 ASSISTANTS' WORK AREA 116 HUMAN RESOURCES WORK AREA 106 K-2035-8PINOIRLAVATORYVITREOUS CHINA 26X18 RETURN RISER 30X20 SUPPLY RISER 26X18 RETURN RISER 30X20 SUPPLY RISER SH AL LO W C O U N TE R 21 3 3.4 4 4.4 5 5.1 6 7 8 A C B D E F H G A C B D E F H G 21 3 3.4 4 4.4 5 5.1 6 7 8 EX EX EX A A AA A A A A A P P S S S S S S AA A A A A AA ACT CEILING 9'-0" +/- AFF PAINTED EXPOSED SLAB WITH BAFFLES PAINTED EXPOSED SLAB WITH BAFFLES PAINTED EXPOSED SLAB WITH BAFFLES PAINTED EXPOSED SLAB WITH BAFFLES PAINTED EXPOSED SLAB WITH BAFFLES ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF SOFFIT AT 8'-11" SOFFIT AT 9'-11" SOFFIT AT 8'-11" SOFFIT AT 8'-11" SOFFIT AT 8'-11"SOFFIT AT 9'-11" SOFFIT AT 8'-11" SOFFIT AT 9'-11" PAINTED GWB AT 8'-0" AFF PAINTED GWB AT 8'-0" AFF PAINTED GWB AT 8'-0" AFF PAINTED GWB AT 8'-0" AFF PAINTED GWB AT 8'-0" AFF PAINTED GWB AT 8'-0" AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF A A P P P P CCCCCCCCCCC C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C CCCCCCCC CCC C CCC CCCCCC C C C C C C C A A A AAA A A A A A A A A A A A A A P A A A AAA LF -1 LF -1 LF -1 LF -1 LF -1 LF -1 LF -1 LF -1 LF -1 LF -1 LF -1 LF -1 S 1 S 1 S1S1 S1S1 S 1 S 1 S 1 S 1 S4 S1 S1 S 4S 1 S1 S 4 S 1 S1 S 1 S1 S 1 S1 S 1 S1 S1 S1 S 1 S1 S 1 S 1 S 3 S 1 S 1 S 1 S 1 S 1 S 1 S1 S1 S1 S 3 S3 S3 S 3 S 3 S 3 S 3 S 3 S 3S 3 S 1 S1 S 1 S3 S 3 S 3 S 1 S4 S1 S1 No. ISSUE Project No. Drawing No. BURR SALVATORE ARCHITECTS 815 BOSTON POST ROAD DARIEN, CONNECTICUT 06820 TEL. (203) 655-0303 KEY PLAN A B C D E F G H I J K L 1 2 3 4 5 6 7 8 9 10 11 12 DATE A B C D E F G H I J K L Copyright (c) 2022 Burr Salvatore Architects 1 2 3 4 5 6 7 8 9 10 11 12 NEW CANAAN PUBLIC SCHOOLS 220 ELM STREET, NEW CANAAN, CONNECTICUT THIS DOCUMENT AND THE IDEAS AND DESIGN INCORPORATED HEREIN IS AN INSTRUMENT OF PROFESSIONAL SERVICE AND THE PROPERTY OF BURR SALVATORE ARCHITECTS, PLLC, AND IS NOT TO BE USED IN WHOLE OR IN PART FOR ANY EXTENSION OF THIS PROJECT OR FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF BURR SALVATORE ARCHITECTS, PLLC. - ISSUE FOR PRICING 11/15/2022 Drawn by: Scale: B2R22049 Checked by: 2777 Summer Street Suite 606 Stamford, CT 06905 (203) 548-9939 FP-100 FIRE PROTECTION FIRST FLOOR PLAN JOR JOR 1/4"=1'-0" FP100, 11/15/2022 10:14:59 AM, Alvin Averion FIRE/SMOKE STOPPING WALL PENETRATION DETAIL SPRINKLER HEAD LOCATION DETAIL TYPICAL SPRINKLER INSTALLATION DETAIL TYPICAL INSTALLATION OF UPRIGHT PENDENT SPRINKLER TYPICAL HANGER DETAIL Nominal Pipe Size Less than 100 psi Greater than 100 psi 3/4 inch 4' 3' 1 inch 5' 4' 1 1/2 inch 7' 7' > 1 1/2 inch 7' 7' HANGER SPACING WITH AN END LINE DROP ELBOW Nominal Pipe Size Less than 100 psi Greater than 100 psi > 1 1/2 inch 2' 1' 1 1/2 inch 2' 1' 1 1/4 inch 1'4" 1' 3/4 inch 9" 6" C BOLT AND NUTS. THREADED LIGHTWALL 5-6 7-0 8-0 12-0 15-0 3/4" 1-1/2"1-1/4" 3-1/2" 12-0 3" N/A 15-0 5" 15-0 15-0 N/A 15-0 HANGER RING STRUCTURAL FRAMING ALL-THREAD ROD TOP BEAM CLAMP SOLID CONCRETE CONSTRUCTION PIPE RING ALL THREAD ROD CONCRETE ANCHOR POWDER DRIVEN STUDROD COUPLING SOLID CONCRETE CONSTRUCTION ALL THREAD ROD HANGER DETAIL HANGER SPACING WITH AN IN LINE DROP TEE 1 1/4 inch 6' 5' 1 inch 1' 9" A B C A STEEL RISER CLAMP B F.S.P. OR DRAIN RISER. THREADED LIGHTWALL STEEL PIPE EXCEPT NOMINAL PIPE STEEL PIPE COPPER TUBE CPVC SIZE (in.) 8-0 10-0 6-0 8-0 6-6 10-0 9-0 12-0 12-0 12-0 N/A 15-0 N/A N/A 15-0 MAXIMUM DISTANCE BETWEEN HANGERS 12-0 12-0 N/A N/A 12-0 12-0 12-0 15-0 1" 2-1/2" 12-0 15-0 12-0 15-0 15-0 2" N/A 15-0 N/A 15-0 4" N/A 15-0 N/A N/A 8"6" LENGTH VARIES HANGER DETAIL DRILLED CONC. ANCHOR PIPE RING SHOT & ROD COUPLING No. ISSUE Project No. Drawing No. BURR SALVATORE ARCHITECTS 815 BOSTON POST ROAD DARIEN, CONNECTICUT 06820 TEL. (203) 655-0303 KEY PLAN A B C D E F G H I J K L 1 2 3 4 5 6 7 8 9 10 11 12 DATE A B C D E F G H I J K L Copyright (c) 2022 Burr Salvatore Architects 1 2 3 4 5 6 7 8 9 10 11 12 NEW CANAAN PUBLIC SCHOOLS 220 ELM STREET, NEW CANAAN, CONNECTICUT THIS DOCUMENT AND THE IDEAS AND DESIGN INCORPORATED HEREIN IS AN INSTRUMENT OF PROFESSIONAL SERVICE AND THE PROPERTY OF BURR SALVATORE ARCHITECTS, PLLC, AND IS NOT TO BE USED IN WHOLE OR IN PART FOR ANY EXTENSION OF THIS PROJECT OR FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF BURR SALVATORE ARCHITECTS, PLLC. - ISSUE FOR PRICING 11/15/2022 Drawn by: Scale: B2R22049 Checked by: 2777 Summer Street Suite 606 Stamford, CT 06905 (203) 548-9939 FP-301 FIRE PROTECTION DETAILS JOR JOR NONE FP301, 11/15/2022 10:15:05 AM, Alvin Averion E X EX E X A A AA A A A A A P P S S S S S S AA A A A A AA ACT CEILING 9'-0" +/- AFF PAINTED EXPOSED SLAB WITH BAFFLES PAINTED EXPOSED SLAB WITH BAFFLES PAINTED EXPOSED SLAB WITH BAFFLES PAINTED EXPOSED SLAB WITH BAFFLES PAINTED EXPOSED SLAB WITH BAFFLES ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF SOFFIT AT 8'-11" SOFFIT AT 9'-11" SOFFIT AT 8'-11" SOFFIT AT 8'-11" SOFFIT AT 8'-11" SOFFIT AT 9'-11" SOFFIT AT 8'-11" SOFFIT AT 9'-11" PAINTED GWB AT 8'-0" AFF PAINTED GWB AT 8'-0" AFF PAINTED GWB AT 8'-0" AFF PAINTED GWB AT 8'-0" AFF PAINTED GWB AT 8'-0" AFF PAINTED GWB AT 8'-0" AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF ACT CEILING 9'-0" +/- AFF 7 A-600 6 A-600 A A CCCCCCCCCCC C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C CCCCCCCC CCC C CCC CCCCCC C C C C C C C A A A AAA A A A A A A A A A A A A A A A A AAA L F - 1 L F - 1 L F - 1 L F - 1 L F - 1 L F - 1 L F - 1 L F - 1 L F - 1 L F - 1 L F - 1 L F - 1 G G G G H H H GWB CEILING G G G G G G G G H G G G CONSTRUCT 1-HOUR FIRE-RATED SOFFIT ABOVE PROPOSED DOOR PAINT CEILING - NO OTHER WORK PROVIDE NEW EXIT SIGN - REFER TO SPECIFICATIONS FOR TYP. EXIT SIGNAGE PATCH EXISTING CEILING AS A RESULT OF PARTITION DEMOLITION - MATCH EXISTING GRID & TILE & REPLACE GRID FROM PARTITION THROUGH WC IF REQUIRED IN ORDER TO MAINTAIN INTEGRITY OF GRID LAYOUT (TYP. LADIES' BATH ALSO) REFER TO ADD-ALTERNATE NO. 3 FOR PROPOSED ALTERNATE SCOPE AT THIS ENTRY DOOR NEW EXIT SIGN P P CONTRACTOR SHALL VERIFY THAT ONE OF THE TWO EXISTING LIGHTS IS FITTED WITH INVERTER OR OTHER EMERGENCY CAPABILITY P CONTRACTOR SHALL VERIFY THAT EXISTING EXTERIOR LIGHT IS FITTED WITH EMERGENCY CAPABILITY EXIT SIGN DELETED EXIT SIGN DELETED EXIT SIGN DELETED EXIT SIGN DELETED EXIT SIGN DELETED K-2035-8PINOIRLAVATORYVITREOUS CHINA K-2035-8PINOIRLAVATORYVITREOUS CHINAK-2035-8PINOIRLAVATORYVITREOUS CHINA K-2035-8PINOIRLAVATORYVITREOUS CHINA K-2035-8PINOIRLAVATORYVITREOUS CHINA K-2035-8PINOIRLAVATORYVITREOUS CHINA K-2035-8PINOIRLAVATORYVITREOUS CHINA A A A A A A A PROVIDE NEW EXIT SIGN - REFER TO SPECIFICATIONS FOR TYP. EXIT SIGNAGE REMOVE EXISTING PENDANTS & REPLACE WITH NEW RECESSED LIGHTS, TYP. - PATCH CEILING AS REQUIRED TO EFFECT INSTALLATION A PROVIDE NEW EXIT SIGN - REFER TO SPECIFICATIONS FOR TYP. EXIT SIGNAGE P P P P P EX-EM EX-EM APPROXIMATE LOCATION EX APPROXIMATE LOCATION OF EXISTING PENDANTS APPROXIMATE LOCATION OF EXISTING EXTERIOR LIGHT APPROXIMATE LOCATION EX-EM APPROXIMATE LOCATION EX APPROXIMATE LOCATION EX-EM APPROXIMATE LOCATION EX EX EX APPROXIMATE LOCATION APPROXIMATE LOCATION APPROXIMATE LOCATION EX-EM APPROXIMATE LOCATION EX EX EX APPROXIMATE LOCATION APPROXIMATE LOCATION APPROXIMATE LOCATION EXISTING FLUORESCENT LIGHT APPROXIMATE LOCATION EXISTING FLUORESCENT LIGHT APPROXIMATE LOCATION EM EM EM EM EM EXEX EXEX EX EX-EM APPROXIMATE LOCATION ACCESSIBLE SIGN NEW EXIT SIGN NEW EXIT SIGN ACCESSIBLE SIGN NEW EXIT SIGN ACCESSIBLE SIGN NEW EXIT SIGN ACCESSIBLE SIGN 4" RECESSED LIGHT FIXTURE EXHAUST FAN S 3 S 4 S 1 CAT 6 DATA PULL - 2 WIRES PER PULL FLOOR BOX SINGLE-POLE SWITCH 3-WAY SWITCH 4-WAY SWITCH DUPLEX RECEPTACLE / EXISTING DUPLEX REC. 4" RECESSED EMERGENCY LIGHT FIXTURE A B EXIT SIGN; WALL MOUNTED W/ ARROWS AND FACES AS SHOWN EXIT SIGN; CEILING MOUNTED W/ ARROWS AND FACES AS SHOWN CFA CALL FOR AID PULL SWITCH CALL FOR AID ALARM SIGNAL FIRE HORN STROBE DEDICATED CIRCUIT LF-1 EX A A-EM LF-1- EM B LED STRIP LIGHT (FIXTURE BY OWNER) CEILING STRIP LIGHT EMERGENCY CEILING STRIP LIGHT 2 X 2 CEILING LIGHT FIXTURE SCONCE S PENDANT (FIXTURE BY OWNER) C 2-1/2" L.V. RECESSED ACCENT LIGHT FIXTURE RETURN CEILING GRILLE OR REGISTERS AC/DC INTERCONNECTED CO DETECTOR CO EXIST. EMERGENCY LIGHT W/ VISIBLE TEST BUTTONS EXIST. CEILING LIGHT (RECESSED OR PENDANT) P EX-EM EX EXIT SIGN WITH LIGHT & DIRECTIONAL ARROWS AS IND. EXIT SIGN WITH SYMBOL OF ACCESSIBILITY ACCESS. SIGN No. ISSUE Project No. Drawing No. BURR SALVATORE ARCHITECTS 815 BOSTON POST ROAD DARIEN, CONNECTICUT 06820 TEL. (203) 655-0303 KEY PLAN LEGEND / NOTES A B C D E F G H I J K L 1 2 3 4 5 6 7 8 9 10 11 12 DATE A B C D E F G H I J K L Copyright (c) 2022 Burr Salvatore Architects 1 2 3 4 5 6 7 8 9 10 11 12 NEW CANAAN PUBLIC SCHOOLS 220 ELM STREET, NEW CANAAN, CONNECTICUT THIS DOCUMENT AND THE IDEAS AND DESIGN INCORPORATED HEREIN IS AN INSTRUMENT OF PROFESSIONAL SERVICE AND THE PROPERTY OF BURR SALVATORE ARCHITECTS, PLLC, AND IS NOT TO BE USED IN WHOLE OR IN PART FOR ANY EXTENSION OF THIS PROJECT OR FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF BURR SALVATORE ARCHITECTS, PLLC. DRAWN BY: REVIEWED BY: A-110 REFLECTED CEILING PLAN FIRST FLOOR 1 1/4" = 1'-0" PROPOSED RCP FIRST FLOOR 1 ISSUE FOR PRICING 11/15/2022 2 ISSUE FOR PERMIT REVISIONS 02/21/2023 AutoCAD SHX Text CFA AutoCAD SHX Text S 5/4 X 6 PAINTED, PRE-PRIMED (AND BACK-PRIMED) POPLAR JAMB AROUND FRAMELESS DOORS AS DEPICTED FRAMELESS GLASS DOORS & TRNASOM CEILING BAFFLES HUNG FROM DECK / JOISTS ABOVE 1/2" GLASS PARTITION, TYP. TRASH/RECYCLING EXIT PAINTED WOOD CABINETS BY DURASUPREME (REESE INSET CABINETRY) - COLOR TBD PROVIDE CLEAR MAPLE INTERIORS, TYP. TILE BACKSPLASH ATOP STONE COUNTERTOPS - REFER TO SCHEDULES SILL AT EXISTING WINDOW DROPS BELOW PROPOSED COUNTERTOP HEIGHT. PAINT BOTTOMMOST LITES BLACK & FABRICATE BLANK-OFF PANEL ATOP THEM AS SUBSTRATE FOR CONTINUOUS BACKSPLASH DEPICTED. PROVIDE STONE CAP AS INDICATED CABINET DOORS FOLD AWAY TO PROVIDE ADA ACCESS BENEATH SINK - INSULATE PIPES TO MEET ADA STANDARDS & ENSURE FLOOR RUNS CONTINUOUS BENEATH CABINETRY NEW PAINTED, PRE-PRIMED (AND BACK-PAINTED) POPLAR CASING AT EXISTING EXTERIOR DOORS 2 ' - 1 0 " FAUCET SPECIFIED IN SCHEDULE SUPERSEDES ANY GRAPHIC REPRESENTATION FULL-HEIGHT TILE WALL AS DEPICTED - MATCH BACKSPLASH TILE (REFER TO SCHEDULE) PAINTED WOOD CABINETS BY DURASUPREME (REESE INSET CABINETRY) - COLOR TBD PROVIDE CLEAR MAPLE INTERIORS, TYP. FINISHED FLAT, INSET END-PANEL AT EXPOSED END OF CABINETRY, TYP. 2 ' - 1 0 " 2'-0" MAX COUNTER DEPTH FOR SIDE-APPROACH AT SINK FAUCET SPECIFIED IN SCHEDULE SUPERSEDES ANY GRAPHIC REPRESENTATION 7 ' - 0 " PAINTED WOOD APRON BENEATH VANITY - PROVIDE INSULATION SHROUDS AT PIPES ON WALL REV. 1 - FLUSH CONTROL REVERSED 2 ' - 1 0 " C L O F G R A B B A R 6" 3'-0" GRAB BAR LENGTH 1'-0" TO CL TOILET 2'-0" TO CL TOILET 3 ' - 4 " B . O . G R A B B A R 3 ' - 0 " C L G R A B B A R 1 ' - 6 " G R A B B A R 2 ' - 1 0 " F F T O T . O . C O U N T E R T O P 3 ' - 4 " F F T O B . O . R E F L E C T I V E S U R F A C E PROVIDE SOLID BLOCKING AT LOCATION OF ALL GRAB BARS 3 ' - 4 " F I N I S H E D F L O O R T O R E F L E C T I V E S U R F A C E 4 ' - 0 " 3'-8" 9 F U L L C O U R S E S B E L O W A C C E N T & C A P 3'-4" FACE OF WALL TO CL GRAB BAR 2 ' - 1 0 " C L O F G R A B B A R 1 ' - 6 5 / 8 " + / - F F T O D I S P E N S E R CONTRACTOR SHALL EFFECT INSTALLATION SUCH THAT TISSUE DISPENSER IS 1'-8" AFF ALIGN DISPENSER WITH TILE PATTERN AS DEPICTED - ENSURE SUCH ALIGNMENT DOES NOT RENDER TISSUE DISPENSER LOWER THAN 15" AFF AND HIGHER THAN 48" AFF REMOVE EXISTING WALL & DOOR AT TOILET ENCLOSURE - PROVIDE NEW TOILET PARTITIONS & ACCESSORIES TO PROVIDE ADA TOILET ENCLOSURE REMOVE EXISTING VANITY; PROVIDE NEW WOOD APRON WITH STONE COUNTERTOP (REFER TO SCHEDULES) - ENSURE PIPES BENEATH VANITY ARE INSULATED - REFER TO ELEVATIONS REMOVE & REPLACE ALL PLUMBING FIXTURES - MAINTAIN EXISTING PLUMBING FIXTURE LOCATIONS A-704 INTERIOR ELEVATIONS - PANTRY, LADIES BATHROOM 1 1/2" = 1'-0" PANTRY - NORTH 3 1/2" = 1'-0" PANTRY - EAST 2 1/2" = 1'-0" PANTRY - SOUTH 4 1/2" = 1'-0" PANTRY - WEST 6 1/2" = 1'-0" LADIES' BATHROOM - NORTH 7 1/2" = 1'-0" LADIES' BATHROOM - SOUTH 8 1/2" = 1'-0" LADIES' BATHROOM - EAST 9 1/2" = 1'-0" LADIES' BATHROOM - WEST 10 1/2" = 1'-0" PARTIAL PLAN AT LADIES' BATHROOM 1 ISSUE FOR PRICING 11/15/2022 No. ISSUE Project No. Drawing No. BURR SALVATORE ARCHITECTS 815 BOSTON POST ROAD DARIEN, CONNECTICUT 06820 TEL. (203) 655-0303 KEY PLAN LEGEND / NOTES A B C D E F G H I J K L 1 2 3 4 5 6 7 8 9 10 11 12 DATE A B C D E F G H I J K L Copyright (c) 2022 Burr Salvatore Architects 1 2 3 4 5 6 7 8 9 10 11 12 NEW CANAAN PUBLIC SCHOOLS 220 ELM STREET, NEW CANAAN, CONNECTICUT THIS DOCUMENT AND THE IDEAS AND DESIGN INCORPORATED HEREIN IS AN INSTRUMENT OF PROFESSIONAL SERVICE AND THE PROPERTY OF BURR SALVATORE ARCHITECTS, PLLC, AND IS NOT TO BE USED IN WHOLE OR IN PART FOR ANY EXTENSION OF THIS PROJECT OR FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF BURR SALVATORE ARCHITECTS, PLLC. DRAWN BY: REVIEWED BY: 2 ISSUE FOR PERMIT REVISIONS 02/21/2023 FLOOR FINISH VARIES - REFER TO SCHEDULE FOR DETAILS LIGHT GAUGE METAL-FRAMED STUD WALL (REFER TO PLAN FOR STUD SIZE) EXTENDS FROM T.O. SLAB TO UNDERSIDE OF DECK ABOVE 5/8" PAINTED GWB EXTENDS FULL-HEIGHT OF WALL - PROVIDE VENTS AS REQUIRED ABOVE CEILING LEVEL TO SERVICE HVAC RETURN NEEDS UNFACED SOUND-BATT INSULATION TO FIT CAVITY 5/8" CEMENT BOARD TILE SUBSTRATE CERAMIC TILE WAINSCOTING - REFER TO ELEVATIONS E X T E N T O F T I L E W A S I N C O T & C E M E N T B A C K E R - B O A R D R E F E R T O E L E V A T I O N S FLOOR FINISH VARIES - REFER TO SCHEDULE FOR DETAILS LIGHT GAUGE METAL-FRAMED STUD WALL (REFER TO PLAN FOR STUD SIZE) EXTENDS FROM T.O. SLAB TO UNDERSIDE OF DECK ABOVE 5/8" GWB EXTENDS FULL-HEIGHT OF WALL - PROVIDE VENTS AS REQUIRED ABOVE CEILING LEVEL TO SERVICE HVAC RETURN NEEDS UNFACED SOUND-BATT INSULATION TO FIT CAVITY 5/8" CEMENT BOARD TILE SUBSTRATE CERAMIC TILE WAINSCOTING - REFER TO ELEVATIONS P E R E L E V A T I O N S FLOOR FINISH VARIES - REFER TO SCHEDULE FOR DETAILS LIGHT GAUGE METAL-FRAMED STUD WALL (REFER TO PLAN FOR STUD SIZE) EXTENDS FROM T.O. SLAB TO UNDERSIDE OF DECK ABOVE 5/8" PAINTED GWB EXTENDS FULL-HEIGHT OF WALL - PROVIDE VENTS AS REQUIRED ABOVE CEILING LEVEL TO SERVICE HVAC RETURN NEEDS UNFACED SOUND-BATT INSULATION TO FIT CAVITY FLOOR FINISH VARIES - REFER TO SCHEDULE FOR DETAILS 1/2:" FRAMELESS GLASS PARTITIONS & DOORS 8 ' - 6 " A F F F I N I S H E D H E I G H T RECESSED CHANNEL TO RECEIVE GLASS - T.O. CHANNEL SHALL NOT BE LOWER THAN B.O. GWB AT HEAD SHOE TO HOLD BOTTOM OF GLAZING - MINIMIZE HEIGHT 5/8" PAINTED GWB EXTENDS FULL-HEIGHT OF WALL FROM T.O. GLASS TO UNDERSIDE OF DECK ABOVE UNFACED SOUND-BATT INSULATION TO FIT CAVITY WOOD BLOCKING RECESSED CHANNEL TO RECEIVE GLASS - T.O. CHANNEL SHALL NOT BE LOWER THAN B.O. GWB AT HEAD LIGHT GAUGE METAL-FRAMED STUD WALL (REFER TO PLAN FOR STUD SIZE) EXTENDS FROM T.O. SLAB TO UNDERSIDE OF DECK ABOVE UNFACED SOUND-BATT INSULATION TO FIT CAVITY RECESSED CHANNEL TO RECEIVE GLASS - T.O. CHANNEL SHALL NOT BE LOWER THAN B.O. GWB AT HEAD LIGHT GAUGE METAL-FRAMED STUD WALL (REFER TO PLAN FOR STUD SIZE) EXTENDS FROM T.O. SLAB TO UNDERSIDE OF DECK ABOVE UNFACED SOUND-BATT INSULATION TO FIT CAVITY CEILING BAFFLE (WHERE SPECIFIED) - REFER TO SCHEDULES SPRINKLER ASSEMBLY WITH HEADS ABOVE & BELOW BAFFLES FLOOR FINISH VARIES - REFER TO SCHEDULE FOR DETAILS LIGHT GAUGE METAL-FRAMED STUD WALL (REFER TO PLAN FOR STUD SIZE) EXTENDS FROM T.O. SLAB TO UNDERSIDE OF DECK ABOVE 5/8" PAINTED QUIETROCK GWB EXTENDS FULL-HEIGHT OF WALL - INSTALL IN ACCORDANCE WITH MANUFACTURER'S GUIDELINES & WITH ALL MANUFACTURER-REQUIRED SEALANTS AND FASTENERS UNFACED SOUND-BATT INSULATION TO FIT CAVITY A-601 FINISH SCHEDULE 1 NTS INTERIOR FINISH SCHEDULE 2 NTS MATERIAL & FINISH SCHEDULE 3 3/4" = 1'-0" TYPE A - STUD GWB BOTH SIDES 5 3/4" = 1'-0" TYPE C - STUD GWB WITH TILE 6 3/4" = 1'-0" TYPE D - STUD GWB WITH FULL TILE 4 3/4" = 1'-0" TYPE B - FRAMELESS GLASS 10 3/4" = 1'-0" TYPE H - SOFFIT 9 3/4" = 1'-0" TYPE G - SOFFIT WITH GLASS 1 ISSUE FOR PRICING 11/15/2022 7 3/4" = 1'-0" TYPE E - FRAMELESS GLASS 8 3/4" = 1'-0" TYPE F - QUIETROCK PARTITION 11 NTS PAINT LEGEND No. ISSUE Project No. Drawing No. BURR SALVATORE ARCHITECTS 815 BOSTON POST ROAD DARIEN, CONNECTICUT 06820 TEL. (203) 655-0303 KEY PLAN LEGEND / NOTES A B C D E F G H I J K L 1 2 3 4 5 6 7 8 9 10 11 12 DATE A B C D E F G H I J K L Copyright (c) 2022 Burr Salvatore Architects 1 2 3 4 5 6 7 8 9 10 11 12 NEW CANAAN PUBLIC SCHOOLS 220 ELM STREET, NEW CANAAN, CONNECTICUT THIS DOCUMENT AND THE IDEAS AND DESIGN INCORPORATED HEREIN IS AN INSTRUMENT OF PROFESSIONAL SERVICE AND THE PROPERTY OF BURR SALVATORE ARCHITECTS, PLLC, AND IS NOT TO BE USED IN WHOLE OR IN PART FOR ANY EXTENSION OF THIS PROJECT OR FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF BURR SALVATORE ARCHITECTS, PLLC. DRAWN BY: REVIEWED BY: 2 ISSUE FOR PERMIT REVISIONS 02/21/2023 DETAIL INTENTIONALLY OMITTED GENERAL NOTES: 1. ALL GYPSUM SHALL BE UNITED STATES GYPSUM "SHEETROCK" BRAND ECOSMART PANELS FIRECODE X CONTRACTOR SHALL PROVIDE SUBMITTAL FOR REVIEW BY ARCHITECT FOR ALL GYPSUM MATERIALS. 2. ALL INTERIOR FRAMING STUDS SHALL BE CLARK DIETRICH PROSTUD 25 DRYWALL STUDS. CONTRACTOR SHALL PROVIDE SUBMITTAL FOR REVIEW BY ARCHITECT FOR ALL GYPSUM MATERIALS. 3. ALL INTERIOR GLAZING PROVIDED AS WALL TYPE B SHALL BE SAFETY GLAZING. SUCH GLAZING SHALL MEET THE TESTING REQUIREMENTS OF CODE SECTION 2406.2: "GLAZING SHALL BE TESTED IN ACCORDANCE WITH CPSC 16 CFR PART 1201. GLAZING SHALL COMPLY WITH THE TEST CRITERIA FOR CATEGORY II, UNLESS OTHERWISE INDICATED IN TABLE 2406.2(1)" (CODE PORTION INTENTIONALLY DELETED AS NOT APPLICABLE TO THIS PROJECT). "EXCEPTION: GLAZING NOT IN DOORS OR ENCLOSURES FOR HOT TUBS, WHIRLPOOL, SAUNAS, STEAM ROOMS, BATHTUBS AND SHOWERS SHALL BE PERMITTED TO BE TESTED IN ACCORDANCE WITH ANSI Z97.1. GLAZING SHALL COMPLY WITH THE TEST CRITERIA FOR CLASS A, UNLESS OTHERWISE INDICATED IN TABLE 2406.2(2)." 7 ' - 0 " VARIES 7 ' - 0 " 3 ' - 0 " VARIES 7 ' - 0 " VARIES 7 ' - 0 " VARIES 5 1 / 2 " 3/4" 2 5/8" 3 1/8" 3 / 4 " R 5 / 8 " 1 / 8 " 3 1 / 2 " 1 " 4 1 / 2 " 4" 1" 5/8" GWB 4 1/2" 1/2" GLASS 6" TYP. BAFFLE SPACING CL TO CL 1 1/2" TYP. BAFFLE 5 / 8 " F A C E O F G W B W A L L T O F A C E O F B A F F L E USG PARALINE BAFFLE LINEAR CEILING SYSTEM 6 " C L B A F F L E T O L E B A F F L E USG PARALINE BAFFLE LINEAR CEILING SYSTEM 4 7/8" FINISHED SOFFIT / WALL 5/8" GWB 6"6" 4 1/2" 4 1/2" 6" TYP. BAFFLE SPACING CL TO CL FRAMED SOFFIT (SOUND-ATTENUATING INSULATION OMITTED FOR CLARITY) 1/2" GLASS PARTITION NOTE: VIEW DEPICTED IS A COMPOSITE VIEW OF PLAN CUT TAKEN WHERE GLASS INTERSECTS SOFFIT ABOVE TO DEMONSTRATE RELATIONSHIP BETWEN BAFFLES & SOFFIT AND BAFFLES & GLAZING WHERE THEY ABUT ONE ANOTHER EQ. FACE OF BAFFLE TO FACE OF GLAZING EQ. FACE OF BAFFLE TO FACE OF GLAZING A-600 INTERIOR DOOR & CASED OPENING SCHEDULE 1 NTS INTERIOR DOOR & CASED OPENING SCHEDULE DOOR TYPE A DOOR TYPE B DOOR TYPE C DOOR TYPE D 2 1'-0" : 1'-0" BASEBOARD A 3 1'-0" : 1'-0" CASING IL2006 4 1'-0" : 1'-0" WINDOW CASING - TYPICAL 5 1'-0" : 1'-0" WINDOW STOOL & APRON (WHERE NEW) 6 SCALE: 3" = 1'-0" PARTIAL PLAN CUT AT OFFICE SOFFIT - DETAIL AT BAFFLES 7 SCALE: 3" = 1'-0" PARTIAL PLAN CUT AT CORRIDOR SOFFIT - DETAIL AT BAFFLES 1 ISSUE FOR PRICING 11/15/2022 DETAIL INTENTIONAL OMITTED No. ISSUE Project No. Drawing No. BURR SALVATORE ARCHITECTS 815 BOSTON POST ROAD DARIEN, CONNECTICUT 06820 TEL. (203) 655-0303 KEY PLAN LEGEND / NOTES A B C D E F G H I J K L 1 2 3 4 5 6 7 8 9 10 11 12 DATE A B C D E F G H I J K L Copyright (c) 2022 Burr Salvatore Architects 1 2 3 4 5 6 7 8 9 10 11 12 NEW CANAAN PUBLIC SCHOOLS 220 ELM STREET, NEW CANAAN, CONNECTICUT THIS DOCUMENT AND THE IDEAS AND DESIGN INCORPORATED HEREIN IS AN INSTRUMENT OF PROFESSIONAL SERVICE AND THE PROPERTY OF BURR SALVATORE ARCHITECTS, PLLC, AND IS NOT TO BE USED IN WHOLE OR IN PART FOR ANY EXTENSION OF THIS PROJECT OR FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF BURR SALVATORE ARCHITECTS, PLLC. DRAWN BY: REVIEWED BY: 2 ISSUE FOR PERMIT REVISIONS 02/21/2023

39 LOCUST AVENUE NEW CANAAN, CT 06840Location

Address: 39 LOCUST AVENUE NEW CANAAN, CT 06840

Country : United StatesState : Connecticut