From: Federal Government(Federal)
Basic Details | Start Date28 Mar, 2024 (1 month ago)Due Date22 Apr, 2024 (10 days ago) |
Customer / Agency | |
SetAside | SBA(Total Small Business Set-Aside (FAR 19.5)) |
Attachments (2) | |
3-27-24 See attachement Questions and Answers 1.The Contractor will remove and dispose of diesel fuel from Buildings 106, 234 on US NAVY Joint Base Wahiawa (NCTAMS). Contractor will provide all labor, supervision, project management, tools, materials, equipment, facilities, transportation, incidental engineering, documentation and other items necessary to troubleshoot, inspect, remove, rebuild, rewind, repair, replace, dispose, process, modify, adjust, reinstall, test and operationally verify the removal and disposal of diesel fuel. Additional requirements include and is not limited to:? Proper removal of approximately 17,000 gallons of diesel fuel.? Proper disposal of approximately 17,000 gallons of diesel fuel.? Handling and generating any/all required documentation related to both the removal, transportation, and disposal of hazardous material (diesel fuel etc.)? All other necessary tasks and operational checks as