The City of Pacifica is accepting sealed bids/proposals for Lower Linda Mar Repair and Rehabilitation Project CO44 to be received no later than Wednesday, April 24, 2024 at 2:00 pm. BackgroundThe LOWER LINDA MAR REHABILITATION AND REPAIR PROJECT C044 includes replacing sewer mainlines throughout the Lower Linda Mar neighborhood in the City of Pacifica (City). The approximate length of sewer mainlines to be replaced are listed below: • Base Bid = 18,359 linear feet • Additive Bid Item #1 = 3,450 linear feet • Additive Bid Item #2 = 7,048 linear feetThe project includes replacement of existing sanitary sewer mains with pipe bursting and open trench construction methods. New sanitary sewer piping ranges from 8-inch to 16-inch HDPE pipe for pipe bursting methods, and 8-inch to 12-inch for open trench methods. The work includes reconnection of sanitary sewer laterals, connection to existing manholes, construction of new manholes, manhole modifications, manhole rehabilitation, and lamp hole
replacement.The project includes, but is not limited to the following additional items: • Bypass pumping and/or routing of sewage. • Prepare and implement a water pollution control plan (WPCP) and site protection. • Traffic and pedestrian control • Dewatering and the construction of all temporary shoring and slope protection measures. • Replacement of disturbed landscaping, private improvements, curb & gutter, sidewalks, curb ramps, monuments, AC pavement restoration, and other miscellaneous items.The project includes additive bid items that may or may not be awarded by the City depending on the bid results and available funding. The project also includes provisions for the contractor to replace private laterals under separate contracts with individual property owners.TimelineRelease Project Date:March 26, 2024Question Submission Deadline:April 15, 2024, 5:00pmQuestion Response Deadline:April 19, 2024, 5:00pmSubmission Deadline:April 24, 2024, 2:00pmContractor Selection Date:May 2, 2024