From: Federal Government(Federal)
Basic Details | Start Date09 Jan, 2023 (15 months ago)Due Date31 Jan, 2023 (15 months ago) |
Customer / Agency | |
The work consists of furnishing all plant, labor, materials and equipment, and constructing the Engineering Research and Development Center (ERDC) Geotechnical and Structures Laboratory (GSL) Building roofing repairs. Work includes removal of the existing roofing material, installing a new TPO roof covering, flashing of numerous mechanical ventilation handler casings, and install/repair of the roof drainage