Search results for: Tunnel

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 5,553
  • Natural Tunnel Woods BH85 Groundbreaker Backhoe

    Type : Bid Notification

    Due : 29 Apr, 2024 (in 2 days)
    Posted : 21 hours ago
    Started : 25 Apr, 2024 (Yesterday)

    Info Items Issued By: Department of Conservation and Recreation Opportunity Type: Quick Quote Category: Equipment - Non-Technology Work Location: Natural Tunnel Website: Summary: Woods BH85 Groundbreaker Backhoe or agency approved equal.

    From: Virginia (State)

  • Tunnel Washing Services

    Type : Bid Notification

    Due : 16 May, 2024 (in 19 days)
    Posted : 16 days ago
    Started : 26 Mar, 2024 (1 month ago)

    Metro is seeking a qualified contractor to provide complete high pressure washing services to clean the walls, ceiling, and floors of rail tunnels from trash debris, dirt, dust, grease, grime and other contaminants from Metro Rail tunnels

    From: Los Angeles Metropolitan Transit Authority (Transportation)

  • 54-24 RTA Tunnel Membrane Replacement Re-Bid

    Type : Bid Notification

    Due : 16 May, 2024 (in 19 days)
    Posted : 3 days ago
    Started : 08 Apr, 2024 (18 days ago)

    54-24 RTA Tunnel Membrane Replacement Re-Bid File Number:54-24 Ordinance:1365-23 Description:FOR THE DIVISION OF CLEVELAND HOPKINS AIRPORT FOR THE DEPARTMENT OF PORT CONTROL, AS AUTHORIZED BY ORDINANCE 1365-23. PASSED DECEMBER 4, 2023. There is a $50.00 charge for plans and specifications. Bidders must be on the Plan-holders list to submit a bid or receive any addenda.

    From: Cleveland (City)

  • Plastic Tunnel Bags, Fiberboard Boxes, and Fiberboard Flutes-DLA San Joaquin, CA

    Type : Bid Notification

    Due : 30 Apr, 2024 (in 3 days)
    Posted : 23 days ago
    Started : 24 Apr, 2024 (2 days ago)

    ***This Combined Synopsis/Solicitation (CSS) is being issued to establish a Fixed Price contract for the purchase of plastic tunnel bags, fiberboard boxes, and fiberboard flutes at DLA Distribution San Joaquin, CA. See SP3300-24-Q-0130 for more details. Please complete Attachment 1-Schedule of Services and Attachment 2-Drawing_Diagram for all quotes submitted. This is an 'all or nothing' requirement where all line items must be quoted.

    From: Federal Government (Federal)

  • ​Construction Engineering for Barton/Bandemer Park Pedestrian Tunnel Project

    Type : Bid Notification

    Due : 01 May, 2024 (in 4 days)
    Posted : 16 days ago
    Started : 26 Mar, 2024 (1 month ago)

    Groundwater may need to be controlled during construction for installation of the culvert. 12 This project includes the construction of approximately 800-feet of non-motorized concrete path, which also includes an 18-foot timber bridge that spans over a relocated stream to be constructed. The pedestrian access provided by this project will be lighted at the tunnel with transition lighting provided on each end of the tunnel.

    From: Ann Arbor (City)

  • ​Barton/Bandemer Park Pedestrian Tunnel Project

    Type : Bid Notification

    Due : 08 May, 2024 (in 11 days)
    Posted : 13 days ago
    Started : 28 Mar, 2024 (28 days ago)

    Culvert, Precast Concrete Box, Modified 15. Dewatering System for Contaminated Groundwater 16. Slotted Drain, Galvanized 17. Cleanout 18. Revisions to Precast Three-Sided, Arch, and Box Culverts 19. Culvert Bedding 20. Steel Sheet Piling, Temporary 21. Decorative Panel, Furnish and Install 22. Timber Bridge 23. Modular Block Wall 24. Shared use Path, Aggregate, __ inch, Modified 25. Shared use Path, Conc, __ inch 26.

    From: Ann Arbor (City)

  • NOAA – National Marine Fisheries Service – AFSC-RACE – Loligo Swim Tunnel Aquatic Respirometry System or Equivalent

    Type : Bid Notification

    Due : 06 May, 2024 (in 9 days)
    Posted : 4 days ago
    Started : 22 Apr, 2024 (4 days ago)

    Swim Tunnel respirometry allows researchers to effect water quality changes in a controlled environment and measure changes to an organism’s metabolic processes as a result.SCOPE: The Contractor shall furnish and deliver the swim tunnel, sensors, probes, and peripherals listed in Statement of Need.

    From: Federal Government (Federal)