Type : Bid Notification
The DEPARTMENT requires a Bridge (NBI)/ Tunnel Inspection Inventory (NTI) software solution to allow Bridge and Tunnel Inspection staff and its consultants to meet federal requirements.
People also searched for
The DEPARTMENT requires a Bridge (NBI)/ Tunnel Inspection Inventory (NTI) software solution to allow Bridge and Tunnel Inspection staff and its consultants to meet federal requirements.
2024 Tunnel Lighting LED Upgrade2024 Tunnel Lighting LED Upgrade Construction Bid Notice MSP Airport May 14, 2024 View
Army Engineer Research and Development Center (ERDC), Cold Regions Research and Engineering Laboratory (CRREL), Biogeochemical Sciences Branch (BSB) requires the procurement of two enclosed high tunnels greenhouses for current and incoming project work. Greenhouses will be utilized to create a controlled growing area over containment test cells.
Le ministère des Transports et de la Mobilité durable, requiert, par le présent appel d'offres, des soumissions dans le but d'octroyer un contrat ferme pour l'acquisition d'accessoires de relampage pour le Tunnel Ville-Marie, le tout, selon le devis, la norme et les spécifications faisant partie des documents d'appel d'offres. Les documents d'appel d'offres sont disponibles uniquement par le système électronique SEAO.
***This Combined Synopsis/Solicitation (CSS) is being issued to establish a Fixed Price contract for the purchase of plastic tunnel bags, fiberboard boxes, and fiberboard flutes at DLA Distribution San Joaquin, CA. See SP3300-24-Q-0130 for more details. Please complete Attachment 1-Schedule of Services and Attachment 2-Drawing_Diagram for all quotes submitted. This is an 'all or nothing' requirement where all line items must be quoted.
Culvert, Precast Concrete Box, Modified 15. Dewatering System for Contaminated Groundwater 16. Slotted Drain, Galvanized 17. Cleanout 18. Revisions to Precast Three-Sided, Arch, and Box Culverts 19. Culvert Bedding 20. Steel Sheet Piling, Temporary 21. Decorative Panel, Furnish and Install 22. Timber Bridge 23. Modular Block Wall 24. Shared use Path, Aggregate, __ inch, Modified 25. Shared use Path, Conc, __ inch 26.
Swim Tunnel respirometry allows researchers to effect water quality changes in a controlled environment and measure changes to an organism’s metabolic processes as a result.SCOPE: The Contractor shall furnish and deliver the swim tunnel, sensors, probes, and peripherals listed in Statement of Need.