Search results for: bridge

Showing opportunity 1 - 10 of 71,105
  • Code Maintenance Bridge

    Type : Bid Notification

    Due : 30 Apr, 2024 (in 3 days)
    Posted : 1 day ago
    Started : 25 Apr, 2024 (Yesterday)

    This notice is for a sole source bridge action to Planned Systems International Inc (PSI) via General Services Administration (GSA) contract GS-35F-598GA in support of on-going Code maintenance Services. The Government is currently working on the solicitation package for the follow-on Code Maintenance contract.

    From: Federal Government (Federal)

  • 63132QQ Aluminum Bridge Railing

    Type : Bid Notification

    Due : 30 Apr, 2024 (in 3 days)
    Posted : 8 days ago
    Started : 17 Apr, 2024 (9 days ago)

    Railing; 32 Linear Foot Sections NIGP Code: 54075 Railings Quantity: 128.00000 linear foot Delivery Date: 05/20/2024 I1_2. 5 inch two Rail Aluminum Bridge Rail Post NIGP Code: 57005 Aluminum: Bars, Plates, Posts, Rods, Sheets, Siding, Strips, Structural Shapes, Tubes, etc.

    From: Virginia (State)

  • RFQ# 24.0073 Bridge Replacement – Bridge File #02305

    Type : Bid Notification

    Due : 02 May, 2024 (in 5 days)
    Posted : 14 days ago
    Started : 11 Apr, 2024 (15 days ago)

    RFQ# 24.0073 Bridge Replacement – Bridge File #02305 Project Description :The County requires a qualified Supplier to perform the demolition and removal of the existing bridge structure and installation of a new bridge structure on a tributary to Oldman Creek located at NW-20-52-22-W4M, Bridge File #02305. Contact Information :-Deb Feser 780-400-3809

    From: MerX (Federal)

  • Ascutney Basin Bridge Superstructure

    Type : Bid Notification

    Due : 30 Apr, 2024 (in 3 days)
    Posted : 2 months ago
    Started : 26 Feb, 2024 (2 months ago)

    Ascutney Basin Bridge Superstructure postdate:- 02/26/2024 08:15 AM EST responsedate:- 04/30/2024 01:00 PM EDT

    From: Vermont (State)

  • Ascutney Basin Bridge Superstructure

    Type : Bid Notification

    Due : 30 Apr, 2024 (in 3 days)
    Posted : 2 months ago
    Started : 21 Feb, 2024 (2 months ago)

    The goal of this project is to remove the existing concrete bridge superstructure and replace it with new. The existing concrete superstructure is deteriorated, has been damaged by flooding, and can no longer safely carry current traffic loads. The existing substructure (abutments and wingwalls) will be retained and reused. The project includes related site work, excavation and paving.

    From: Vermont (State)

  • Ascutney Basin Bridge Superstructure

    Type : Bid Notification

    Due : 30 Apr, 2024 (in 3 days)
    Posted : 2 months ago
    Started : 21 Feb, 2024 (2 months ago)

    The goal of this project is to remove the existing concrete bridge superstructure and replace it with new. The existing concrete superstructure is deteriorated, has been damaged by flooding, and can no longer safely carry current traffic loads. The existing substructure (abutments and wingwalls) will be retained and reused. The project includes related site work, excavation and paving.

    From: Vermont (State)

  • LIBERTY UNIVERSITY WALKWAY BRIDGE REHABILITATION

    Type : Bid Notification

    Due : 01 May, 2024 (in 4 days)
    Posted : 22 days ago
    Started : 03 Apr, 2024 (23 days ago)

    065 LIBERTY UNIVERSITY WALKWAY BRIDGE REHABILITATION DRAWINGS2024-065 ADDENDUM 01 PACKET FOR LIBERTY UNIVERISTY WALKWAY Return To Main Bid Postings Page

    From: Lynchburg (City)