Search results for: dam design

Showing opportunity 1 - 10 of 11
  • As-Needed Dam Design Services

    Type : Bid Notification

    Due : 26 Apr, 2024 (3 days ago)
    Posted : 1 month ago
    Started : 15 Feb, 2024 (2 months ago)

    Work under this contract will be related to dam structures, appurtenances, and components associated with retention, release, and conveyance of water. Under this contract, the Consultant will provide the following types of services during the design and construction phases of projects: engineering analyses and studies in support of dam design, dam design and engineering support, and environmental support.

    From: San Diego (City)

  • Jericho Town Forest Dam Removal Study & Engineering Design

    Type : Bid Notification

    Due : 20 Dec, 2024 (in 7 months)
    Posted : 5 months ago
    Started : 27 Nov, 2023 (5 months ago)

    Jericho Town Forest Dam Removal Study & Engineering Design postdate:- 11/27/2023 09:10 AM EST responsedate:- 12/20/2024 04:00 PM EST

    From: Vermont (State)

  • Jericho Town Forest Dam Removal Study & Engineering Design

    Type : Bid Notification

    Due : 20 Dec, 2024 (in 7 months)
    Posted : 5 months ago
    Started : 20 Nov, 2023 (5 months ago)

    The Town of Jericho with support from VNRC and the VT DEC through Watershed United Vermont (WUV) is requesting that engineers who are licensed to practice in Vermont submit proposals for a feasibility study including comprehensive geomorphological assessment, preliminary (30 percent) design and sediment management plan for removal of the Jericho Town Forest Dam, located in Jericho, Vermont.

    From: Vermont (State)

  • Centerbrook Dam Removal and Wetland Restoration - Hyde Park

    Type : Bid Notification

    Due : 10 May, 2024 (in 10 days)
    Posted : 4 days ago
    Started : 24 Apr, 2024 (5 days ago)

    The existing wetland habitat has been established over the last 90 years with the dam installed in 1932. There is a fair amount of sediment impounded behind the dam. This preliminary design work will help plan for a partial or full dam removal and potential wetland restoration project.

    From: Vermont (State)

  • Centerbrook Dam Removal and Wetland Restoration - Hyde Park

    Type : Bid Notification

    Due : 10 May, 2024 (in 10 days)
    Posted : 5 days ago
    Started : 24 Apr, 2024 (5 days ago)

    The existing wetland habitat has been established over the last 90 years with the dam installed in 1932. There is a fair amount of sediment impounded behind the dam. This preliminary design work will help plan for a partial or full dam removal and potential wetland restoration project.

    From: Vermont (State)

  • F--CASPER BLM RIPARIAN RESTORATION

    Type : Bid Notification

    Due : 17 May, 2024 (in 17 days)
    Posted : 2 months ago
    Started : 08 Feb, 2024 (2 months ago)

    All four sites will be within the Meadow Creek watershed.Services shall include installation of wicker weave, Zuni bowls, brush mattress and one rock dams. Construction will follow all design specifications located in the references (See section 12). No material will be gathered from the site. Locations will be flagged by BLM personnel prior to construction.

    From: Federal Government (Federal)

  • CASPER BLM RIPARIAN RESTORATION

    Type : Bid Notification

    Due : 17 May, 2024 (in 17 days)
    Posted : 2 months ago
    Started : 08 Feb, 2024 (2 months ago)

    All four sites will be within the Meadow Creek watershed.Services shall include installation of wicker weave, Zuni bowls, brush mattress and one rock dams. Construction will follow all design specifications located in the references (See section 12). No material will be gathered from the site. Locations will be flagged by BLM personnel prior to construction.

    From: Federal Government (Federal)