Type : Bid Notification
Added:Nov 01, 2019 4:18 pm Webster Dam Spillway Chute Replacement
Added:Nov 01, 2019 4:18 pm Webster Dam Spillway Chute Replacement
The crest and spillway bridge occupy ND State Highway 200 which is a major highway through central North Dakota. The approximately 3,000-foot-long spillway is excavated in the left abutment with a design crest elevation of 1,826.2 NAVD88. The chute-type spillway structure consists of a crest structure (including Tainter gates and a bridge), paved chute channel, and a stilling basin.
It is the sole responsibility of the respondent to be knowledgeable of all addenda related to this procurement.
Bid Classification: Services Bid Type: Request for Proposal Bid Number: 2023-ENG-10 Bid Name: Dam Safety Report for Mirror Lake Spillway and Valleyview Storm Pond Bid Status: Open Bid Closing Date: Wed Aug 2, 2023 2:00:00 PM (MDT) Question Deadline: Tue Jul 25, 2023 4:00:00 PM (MDT) Duration in months: 6 Negotiation Type: Refer to project document Condition for Participation: Refer to project document Electronic Auctions: Not Applicable Language for
OF DOCUMENT BEING CONTINUED: PAGE 8 OF 23 PAGES CONTINUED ON NEXT PAGE SPE7M1-23-T-502T
Barrel Springs Dam Removal and Stream Channel Restoration #WA402222 Ecology Project # WQC-2023-SkCoPW-00001 6/8/23 6/26/23
the reinforced concrete spillway chute slab.