Search results for: ev charger

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 10
  • EV Charging Station Installation

    Type : Bid Notification

    Due : 03 May, 2024 (in 2 days)
    Posted : 16 days ago
    Started : 15 Apr, 2024 (16 days ago)

    Issue RFQ: 8:00 a.m., April 15, 2024 Deadline for Questions: 12:00 Noon, May 3, 2024 Deadline Submittal of Quotes: 5:00 p.m., May 3, 2024 Notify Contractor Chosen: May 6, 2024 Questions and final quotes must be submitted electronically, via email, to Alyssa Jones Wood, Sustainability Coordinator, using the following subject line: "Quote for Fleet EV Charger Installation.” No faxed or telephone statements will be accepted.

    From: Tumwater (City)

  • LIT EVSE FOR PASSENGER SHUTTLES

    Type : Bid Notification

    Due : 09 May, 2024 (in 8 days)
    Posted : 13 days ago
    Started : 03 Apr, 2024 (28 days ago)

    Description: Project Category Code:Electric Charging Stations/Vehicle, Airports, Electrical Installation/Construction, Conduit/Electrical/TelemetryDescription:The Project consists of installation of two level 2 electric vehicle chargers and related service equipment, including conduit, panels, transformer, wire, EV charger equipment, and new service setup with Entergy.

    From: Garver (Co-op)

  • City Hall Parking Garage Level C EV Chargers Installation Project

    Type : Bid Notification

    Due : 30 Apr, 2024 (Yesterday)
    Posted : 25 days ago
    Started : 04 Apr, 2024 (26 days ago)

    Install a new 225-amp 120/208 electrical subpanel in the Level C City Hall parking garage that will feed six new EV chargers that will be dedicated to City Fleet vehicles.TimelineBid Post Date:April 4, 2024Pre-Bid Meeting (Non-Mandatory):April 17, 2024, 10:00am City Hall parking garage Level A 250 Hamilton Ave., Palo Alto, CA 94301Question and Clarifications Due Date and Time:April 22, 2024, 1:00pmBid Due Date and Time:April 30, 2024, 3:00pm

    From: Palo Alto (City)

  • Design, Build, Operation and Maintenance of Electric Vehicle Charging Stations

    Design, Build, Operation and Maintenance of Electric Vehicle Charging Stations

    Type : Contract

    Due : 05 Oct, 2024 (in 5 months)
    Posted : 25 days ago
    Started : 22 Mar, 2024 (1 month ago)

    Detailed Description The Ministry of Transportation and Ministry of the Environment, Conservation and Parks, have identified fifteen (15) sites in total where the EV chargers will be deployed at government-owned properties along key provincial travel corridors and destinations, in rural and northern areas of Ontario, including highway rest areas, provincial parks and carpool lots.

    From: Ontario (State)

  • OMH Mid-Hudson Forensic Psychiatric Center New Forensic Replacement Hospital BP2 Base Building

    Type : Bid Notification

    Due : 20 Jun, 2024 (in 1 month)
    Posted : 4 days ago
    Started : 26 Apr, 2024 (5 days ago)

    WBE)Disadvantaged Business Enterprise (DBE)SUPPLIER: Lockers, Partitions, Division 10 Specialties, Bathroom Accessories, EV Chargers, EVSE, Spill Containment, Safety Gear, PPE, HAZMAT Protection, Fall Protection, Parking Lot and Construction Zone Supplies, Construction Mats, Tactical Gear, Environmentally preferable Supplies, WBE, DBE, LEED and Envision rated Supplies, Sustainable, Recycled Content, Made in USAstark estimatingashley Homes6094454412

    From: New York State (State)

  • Electric Vehicle (EV) Charging Stations, Service & Maintenance

    Type : Bid Notification

    Due : 29 May, 2024 (in 27 days)
    Posted : 5 days ago
    Started : 25 Apr, 2024 (6 days ago)

    The scope of the work is to expand and/or update Participating Agency’s EV charging network and to provide related installation, maintenance, repair, parts and supplies, and warranties. The Contractor will provide EV charging stations. The installed chargers will be part of a networked, cloud-based service that will facilitate charge monitoring, reporting services, billing services, and provide access to related software and/or technology.

    From: Foundation for California Community Colleges (Higher Education)

  • City Bus <b>EV</b> Fleet Electrification

    City Bus EV Fleet Electrification

    Type : Contract

    Due : N/A
    Posted : 17 months ago
    Started : 13 Apr, 2024 (17 days ago)

    Description:City Bus is participating in PG&E's EV Fleet Electrification program. PG&E will do engineering, design, construction, own and maintain the line extension to the meet and transformer at 55 Stony Point Road, Santa Rosa, CA 95401. The City will need to engineer and construct from the meter to the charger and install the charger. Transit needs assistance with the electrical engineering work from the transformer to the charger.

    From: Santa Rosa (City)