Type : Bid Notification
The Work consists of demolition of two (2) existing mechanical bar screens and replacement with two (2) new catenary mechanical bar screens, demolition of the existing screenings conveyor and replacement with a new screenings conveyor, demolition of four (4) slide gates and replacement with four (4) new slide gates, demolition of the existing grit system including the grit hoppers, piping, and grit pumps, demolition of the existing Flow Equalization