Search results for: geotechnical investigation

Showing opportunity 1 - 10 of 47
  • RFQ - Sir John Johnson Geotechnical Investigation

    Type : Bid Notification

    Due : 09 May, 2024 (in 9 days)
    Posted : 3 days ago
    Started : 17 Apr, 2024 (11 days ago)

    Project: RFQ - Sir John Johnson Geotechnical Investigation Ref. #: 2024-17 Type: RFQ Status: Open Open Date: Apr 17th 2024, 4:00 PM EDT Questions Due Date: May 1st 2024, 4:00 PM EDT Close Date: May 9th 2024, 11:00 AM EDT Days Left: 12 Project Description:This Request for Quotations (the “RFQ”) is an invitation by Loyalist Township (the “Township”) to prospective respondents to submit non-binding quotations for Geotechnical Investigation and Soil Sampling

    From: Loyalist (Town)

  • OR2 (Dundas Street) Geotechnical Investigation

    Type : Bid Notification

    Due : 23 Apr, 2024 (6 days ago)
    Posted : 26 days ago
    Started : 19 Mar, 2024 (1 month ago)

    Bid Classification: Services Bid Type: RFQ Bid Number: RFQ-ENG-2024-513 Bid Name: OR2 (Dundas Street) Geotechnical Investigation Bid Status: Open Published Date: Tue Apr 2, 2024 4:00:01 PM (EDT) Bid Closing Date: Tue Apr 23, 2024 2:00:01 PM (EDT) Question Deadline: Thu Apr 18, 2024 2:00:00 PM (EDT) Electronic Auctions: Not Applicable Language for Bid Submissions: English unless specified in the bid document Submission Type: Online Submissions Only

    From: Oxford (County)

  • PRESQU’ILE BAY FIXED AID MODIFICATIONS

    Type : Bid Notification

    Due : 02 May, 2024 (in 2 days)
    Posted : 18 days ago
    Started : 11 Apr, 2024 (18 days ago)

    The Contractor is responsible for performing a geotechnical investigation and obtaining an engineered foundation designed to meet the intended loads of the tower and the results of the geotechnical investigation. In preparation for the new tower, the front range tower will be demolished by the Contractor. The new tower has been fabricated by others in anticipation of construction and will be provided to the Contractor at the CCG DSL.

    From: Canada (Federal)

  • South Fork Water Pump Stations ITB (2024028-PU-B)

    Type : Bid Notification

    Due : 07 May, 2024 (in 7 days)
    Posted : 1 month ago
    Started : 01 Mar, 2024 (1 month ago)

    Investigation 04/04/244/15/24RFx Document Addendum 3 - S-1105 & S-1202_R1.pdf(308.27 KB)Addendum #3 (04-10-24) - Revised Drawings S-1105 and S-1202 (2 sheets)4/10/24RFx Document Pumps and Motors Shop Dwgs RFP and Response redacted.pdf(13.52 MB)Addendum #3 (04-10-24) - Pumps and Motors Shop Drawings, RFP and Sydnor Hydro Proposal (279 pages)4/10/24RFx Document ASK 03.29.2024 REV1.pdf(403.03 KB)Addendum #3 (04-10-24) - Sketches ASK-001, ASK-002, ASK

    From: Virginia (State)

  • Outdoor Cantilever Racking for Equipment Storage at 960 Thomas Avenue - WFMA

    Type : Bid Notification

    Due : 03 May, 2024 (in 4 days)
    Posted : 1 month ago
    Started : 15 Mar, 2024 (1 month ago)

    D2.2 The essential components of the Work are as follows: (a) The City of Winnipeg to request Geotechnical Engineering investigation and certify the existing sub-grade have suitable materials and no soft spots are encountered. (b) The Contractor shall submit a final design and loading capacity of racking system to include rack supplier’s engineered shop drawing to be approved by the City of Winnipeg.

    From: MerX (Federal)

  • Estero Island Beach Nourishment and Hurricane Recovery Project

    Type : Bid Notification

    Due : 23 Apr, 2024 (6 days ago)
    Posted : 1 month ago
    Started : 15 Mar, 2024 (1 month ago)

    Investigation Report 2021_20240319 Clarification Mar 19, 2024 Complete 447455_LK-BB GFA Amdril Detailed Geotechnical Investigation 2022_20240319 Clarification Mar 19, 2024 Complete Addendum 1 Issued 3.19.24 Addendum Mar 19, 2024 Complete VOIDNotice of Non-Mandatory Pre-Bid MeetingVOID Attachment Mar 15, 2024 Complete VOIDEl Rmon Jun2023-elev-NAVD88ftVOID Attachment Mar 15, 2024 Complete VOIDEl OPC-South-Jun2023-elev-NAVD88ftVOID Attachment Mar 15

    From: Town of Fort Myers Beach (Town)

  • North Intermodal (NIM) Yard Tower Operations Relocation 2024

    North Intermodal (NIM) Yard Tower Operations Relocation 2024

    Type : Contract

    Due : 21 May, 2024 (in 21 days)
    Posted : 15 days ago
    Started : 29 Mar, 2024 (1 month ago)

    The submitting firm/team shall have experience in planning, preliminary and final architectural and engineering design including (architectural, civil, structural, mechanical, plumbing, electrical and audio/visual), geotechnical investigation and design, land survey, cost estimating, scheduling, permitting, project management, environmental support, bidding support, construction support and grant administration support.

    From: Tacoma (Port)